WGU C720 Pre Assessment Latest Exam 2023 Questions and Answers (Verified Answers) WGU C720 Pre Assessment Latest Exam 2023 Questions and Answers (Verified Answers)

1 / 21
WGU C720 Pre Assessment 2023 Questions and Answers
(Verified Answers)

  1. A company that produces motors uses the following check
    sheet: Why would the company use this check sheet?
    To create a control chart to measure the engine assembly
    process To create a flow chart of the engine assembly process
    To develop a suppliers, inputs, process, outputs, customers (SIPOC)
    dia- gram
    To develop a Pareto chart identifying the root causes of engine defects:
    To develop a Pareto chart identifying the root causes of engine
    defects
  2. Which aspect of quality is demonstrated by a vehicle that has a useful
    life of 165,000 miles?
    Performance
    Reliability
    Features
    Durability: Durability

2 / 21

  1. A quality improvement team is trying to illustrate to upper
    management how a process is varying over time as measurements are
    collected.
    Which two statistical process control (SPC) tools should the team use?
    Choose 2 answers
    Cause-and-effect diagrams
    Scatter diagrams
    Histograms
    Run charts
    Check sheets
    Pareto charts
    Control charts: Control
    charts Run charts
  2. The CEO of a service company wants to change the strategy of the
    com- pany from volume sales to high-quality products.
    Which philosophy should the CEO implement to emphasize quality
    over volume?
    Shewhart’s variation reduction

3 / 21
Deming’s 14 points
Ohno and Shingo’s kaizen
Taguchi’s loss function: Deming’s 14 points

  1. A company sells garage doors through a national retailer and
    contracts with local installers to complete the installations. The operations
    manager is responsible for completing the installations in a 14-day period
    after the sale. The company will be penalized financially if it fails to achieve
    these ob- jectives. The operations manager’s daily responsibilities include
    contacting installers to expedite orders and ensure deadlines are met.
    Which two tools that should be used to measure installer
    performance? Choose 2 answers
    Control charts to measure the time elapsed to completion
    Fishbone diagram to chart the method, material, machine, and manpower
    Gantt chart to measure how much performance has improved
    Run charts to chart output around the 14-day central tendency: Control
    charts to measure the time elapsed to completion
    Run charts to chart output around the 14-day central tendency
  2. Which quality tool examines patterns, flow, and causes of variation of
    data points over time?
    Quality function
    deployment Cause-and-

4 / 21
effect matrix Students t-test
Statistical process control: Statistical process control

  1. A vice president of a major retailer is trying to reduce the wait time for
    customers in the checkout line by appropriately opening checkout lines. To
    do this, the VP needs to know the relationship and degree of correlation
    between monthly customer visits and area population.
    Which tool should be used in this
    situation? Pareto chart
    Control chart
    Scatter plot
    Histogram: Scatter
    plot