DBIA EXAM 2 LATEST ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) |ALREADY GRADED A+

DBIA EXAM 2 LATEST ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) |ALREADY GRADED A+

DBIA EXAM 2 LATEST 2023-2024 ACTUAL EXAM 200
QUESTIONS AND CORRECT DETAILED ANSWERS
WITH RATIONALES (VERIFIED ANSWERS)
|ALREADY GRADED A+
What are the 5 main stages of DB Leadership? – ANSWER- 1. Project
team formation and alignment.

  1. Project pursuit and procurement.
  2. Design integration and advancement.
  3. Construction.
  4. Closeout and Commissioning.
    _ must manage the entire process – ANSWER- Design-Builders What does IDWP stand for? – ANSWER- Integrated Design Work Plan Which phase commitments sets the stage for Integrated Project Leadership and Design-Build Process Control? – ANSWER- Proposal Phase Commitments The Construction process is while the design process is ___. –
    ANSWER- – sequential
  • iterative

_ problem solving is what creates the opportunity to optimize the project. – ANSWER- Integrated Create and a culture for success – ANSWER- Sustain
create a shared vision of project success. –
ANSWER- Team Alignment Sessions
Commitment to Project goals promotes team and __
. –
ANSWER- – integration

  • cohesion
    Proximity leads to _ — the power of overhearing. – ANSWERcommunication Communication leads to __ — promotes common knowledge. –
    ANSWER- understanding
    Understanding leads to _ — interdisciplinary fluency develops One Team. – ANSWER- respect _ fosters cohesion — one team acts as one team – ANSWERRespect

Joint execution planning drives early . – ANSWERdecision-making
What are the 4 DB Team Integration roles? – ANSWER- 1. Integrated
Project Leader (DB – PM).

  1. Designer of Record (A/E).
  2. Design Manager.
  3. Estimator (A/E).
    Who leads the project team and manages team dynamics?
    a) Integrated Project Leader
    b) Designer of Record
    c) Design Manager
    d) Estimator – ANSWER- a) Integrated Project Leader
    Who balances the Owner’s needs plus design and construction?
    a) Integrated Project Leader
    b) Designer of Record
    c) Design Manager
    d) Estimator – ANSWER- a) Integrated Project Leader
    Who is licensed to protect the health, safety and welfare of the public?