After using the square break tool, why should you click on the wall and
check the measurement? – ANSWER- After placing a break, you will
see the measurements shift depending on the wall thinkness
When using a sloped or peaked ceiling, how do you change the default
orientation? – ANSWER- Clic the orientation button and move the
cursor to a wall. then click when you see a red arrow.
After clicking to place the first step when using the staircase tool, what
does the red measurement indicate? – ANSWER- The total rise of the
staircase.
The related-item search method and the similar-item search method can
be used in exactly the same way – ANSWER- False
This cat code would most likely be used when adding a miscellaneous
item for a custom vanity – ANSWER- CAB
What 3 types of items do not have waste automatically included in the
cost of the item? – ANSWER- Carpet, Ninyl Sheet Goods, Shingles

Once and item is on the cusror which mouse button (right or left click)
will allow you to select additional items relating to the original item? –
ANSWER- Right click
Where can you look to see what is or is not included in the cost of an
item? – ANSWER- Item information window.
Claim Info – ANSWER- contact information and location of the loss or
repair – can also enter information regarding the customer’s policy
Creating a new estimate steps – ANSWER- Click new project, make sure
Estimate is selected in the top field, highlight the project name and type
the name of the project or keep “date based” project name, choose
correct profile and select, click create. Select a price list and click next.
Select tax jurisdiction for estimate and click Done.
How do you add a new project? – ANSWER- 1 Add a new project from
local page, click New Project button. New project window appears.
2 Change default name to (example) XW-Lopez- followed by your
initials
3 Click “create” to add the new project – the project will appear on your
dashboard
Changing Project Profiles from Carrier vs Contractor – ANSWER- 1
Save and Exit the project
2 From the local page, click on the estimate

3 From the pull-out menu, click duplicate
4 Verify the project has a unique name
5 Select the correct Profile from the menu
6 Click OK, the duplicated project is now available
Creating a New Estimate: – ANSWER- 1. From Xactimate Dashboard
Local Page, click NEW PROJECT

  1. Make sure Estimate is selected in the top field
  2. Highlight the project name (based on today’s date) and type the name
    of the project or you can change to name specific
  3. Make sure the correct profile is selected in the profile field
  4. Click create
    6 Select a price list you want to use
    Where do you click to create a new project? – ANSWER- New Project
    You can open a project directly from the Cloud > My Projects page.
    True or False – ANSWER- False
    Where would you mark your project completed? – ANSWER- Click
    Complete
    Where would you add line items to your estimate? – ANSWER- click
    Estimate Items
    get pdf at https://learnexams.com/search/study?query=

1 | P a g e
XACTIMATE LEVEL 1 CERTIFICATION EXAM
NEWEST 2024 ACTUAL EXAM 100 QUESTIONS AND
CORRECT DETAILED ANSWERS (VERIFIED
ANSWERS) |ALREADY GRADED A+
The only way to create an Xactimate estimate is through
XactAnalysis.
a. True
b. False – ANSWER- B
With an Internet connection, you can download and upload a
XactAnalysis assignment.
a. True
b. False – ANSWER- A
What are the steps in the 4-Step Estimating Process in order?
a. Claim Info, Sketch, Estimate Items, Complete
b. Claim Info, Estimate Items, Sketch, Complete
c. Estimate Items, Claim Info, Sketch, Complete
d. Sketch, Estimate Items, Claim Info, Complete – ANSWER- A

2 | P a g e
It is mandatory to follow the 4-Step Estimating Process in its
exact order.
a. True
b. False – ANSWER- B
At the fundamental level of learning, it is recommended to add
or create a project from the Control Center tab.
a. True
b. False – ANSWER- B
Multiple addresses can be added through Insured Info.
a. True
b. False – ANSWER- A
There are three coverage types available in the Coverage/Loss
section. Name them in order
a. Contents, Dwelling, Other Structures
b. Dwelling, Contents, Other Structures
c. Dwelling, Other Structures, Contents
d. Contents, Other Structures, Dwelling – ANSWER- C

3 | P a g e
A deductible can be applied across all coverages or specific
coverage only
a. True
b. False – ANSWER- A
Xactware surveys prices from contractors in the field. The unit
prices the contractors provide are __ of costs and
fees associated with performing the task, but __ of
any general overhead and profit percentage. – ANSWERinclusive, exclusive
Image types that can be imported into a Company Header
includes .tif, .gif, and .png.
a. True
b. False – ANSWER- B
Name the four sections that comprise the Sketch window: –
ANSWER- 1. Tools

  1. Search
  2. Sketch Workspace
  3. Items
    get pdf at https://learnexams.com/search/study?query=