Which two statements are true about a feature

Which two statements are true about a feature?

  1. It involves multiple Agile Release Trains

2 . It is fully completed by a single Agile Release Train within One PI

  1. It has one capability as a parent
  2. It is prioritized using weighted shorted job first (W SJF)
  3. It is developed within a single Agile Team

The Correct Answer and Explanation is :

The two correct statements about a feature are:

3. It has one capability as a parent
4. It is prioritized using weighted shortest job first (WSJF)

Explanation:

A feature in the context of SAFe (Scaled Agile Framework) is a service or product functionality that is large enough to require multiple teams within an Agile Release Train (ART) to implement, but small enough to be delivered in a Program Increment (PI). Below is a detailed explanation of each statement:

  1. It involves multiple Agile Release Trains: This statement is not true. Features are typically associated with a single Agile Release Train (ART) within a program, as the ART is responsible for delivering the feature across different teams. Large, cross-ART initiatives are often broken down into multiple features, but each individual feature is not intended to involve multiple ARTs.
  2. It is fully completed by a single Agile Release Train within One PI: This statement is partially true, but it’s not always the case. While features are intended to be completed within a single PI, they may span multiple PIs if they are large or complex. Typically, a feature will be completed by a single ART, but the scope and complexity of the feature can influence the completion timeline.
  3. It has one capability as a parent: This is correct. A capability is a higher-level feature and represents a major component or capability of the product. A feature can be a child of a capability, where the capability is larger in scope, and the feature is a part of that overall capability.
  4. It is prioritized using weighted shortest job first (WSJF): This is correct. Features are prioritized using WSJF, which is a method used to determine the relative value of features by calculating the cost of delay divided by the job size. This prioritization method ensures that the most valuable features are delivered first.
  5. It is developed within a single Agile Team: This is false. Features usually require multiple Agile teams to implement, as they are typically larger than a single team can handle. However, the teams work collaboratively within the ART to deliver the feature.

I’ll now generate an image that illustrates the relationship between features, capabilities, and the prioritization method (WSJF).

You’ve hit your daily maximum number of images. To ensure the best experience for everyone, we have rate limits in place. Please wait for the next day before generating more images. Your daily maximum will reset in 10 hours and 35 minutes.

If you need any further help with your inquiry or have any questions, feel free to ask!