Chapter 01: From Beginning to End: An Overview of Systems Analysis and Design
Page 1
Systems Analysis and Design in a Changing World 7th Edition SatzingerTest Bank
- An information system often includes the software, the database, and the related manual processes.
a. True
b. False
ANSWER: True
POINTS: 1
REFERENCES: p4 - Systems analysis is sometimes referred to as “understanding and specification.”
a. True
b. False
ANSWER: True
POINTS: 1
REFERENCES: p4 - Systems design consists of activities to describe the solution to the problem.
a. True
b. False
ANSWER: True
POINTS: 1
REFERENCES: p5 - Systems development is always a formal activity with a beginning and an end.
a. True
b. False
ANSWER: False
POINTS: 1
REFERENCES: p6 - The SDLC means the Systems Design Life Cycle.
a. True
b. False
ANSWER: False
POINTS: 1
REFERENCES: p7 - Agile Development refers to the flexibility that programmers have in taking on various assignments.
a. True
b. False
ANSWER: False
POINTS: 1
REFERENCES: p8 - Iterative development is the same as Agile development.
Chapter 01: From Beginning to End: An Overview of Systems Analysis and Design
Page 2
a. True
b. False
ANSWER: False
POINTS: 1
REFERENCES: p8
- In iterative development the system is grown organically.
a. True
b. False
ANSWER: True
POINTS: 1
REFERENCES: p8 - The first core process is to plan the project.
a. True
b. False
ANSWER: False
POINTS: 1
REFERENCES: p8 - In iterative development, an iteration usually lasts about six weeks.
a. True
b. False
ANSWER: False
POINTS: 1
REFERENCES: p10 - The System Vision Document is usually developed before the project actually begins.
a. True
b. False
ANSWER: True
POINTS: 1
REFERENCES: p12 - The project plan is required to get the project approved.
a. True
b. False
ANSWER: False
POINTS: 1
REFERENCES: p12 - A Work Breakdown Structure is the first step in building a project schedule.
a. True
b. False
ANSWER: True
POINTS: 1
Chapter 01: From Beginning to End: An Overview of Systems Analysis and Design
Page 3
REFERENCES: p14
- During analysis activities the project team build two types of diagrams: Use Case diagram and Package diagram.
a. True
b. False
ANSWER: False
POINTS: 1
REFERENCES: p17-18 - The purpose of a workflow diagram is to document the internal steps of a use case.
a. True
b. False
ANSWER: True
POINTS: 1
REFERENCES: p19 - The ovals in a workflow diagram represent tasks.
a. True
b. False
ANSWER: True
POINTS: 1
REFERENCES: p19-20 - The database is designed using information from the class diagram.
a. True
b. False
ANSWER: True
POINTS: 1
REFERENCES: p22 - All the classes in the Design Class Diagram are used to define the database tables.
a. True
b. False
ANSWER: False
POINTS: 1
REFERENCES: p24 - A package diagram is useful to document the various subsystems in a system.
a. True
b. False
ANSWER: True
POINTS: 1
REFERENCES: p24-25 - Usually the final step in a given iteration is to deploy part of the system.
a. True
b. False
Chapter 01: From Beginning to End: An Overview of Systems Analysis and Design
Page 4
ANSWER: False
POINTS: 1
REFERENCES: p27
- One approach to the SDLC can be described using five core processes.
a. True
b. False
ANSWER: False
POINTS: 1
REFERENCES: p7 - An iteration normally only includes three or four of the core processes.
a. True
b. False
ANSWER: False
POINTS: 1
REFERENCES: p8 - Sometimes the activities within Core Process one are completed before the actual project starts.
a. True
b. False
ANSWER: True
POINTS: 1
REFERENCES: p11 - An information system consists of
a. software, database, and manual processes
b. software, hardware, and network
c. software, hardware, and database
d. applications, screens, and database
ANSWER: a
POINTS: 1
REFERENCES: p4 - A person that functions as an architect to plan, capture the vision, and understand the needs for a new system is often
called a .
a. programmer analyst
b. software engineer
c. systems analyst
d. software developer
ANSWER: c
POINTS: 1
REFERENCES: p6 - Those activities that enable a person to describe in the detail the system that solves the need is called