TAMIS Actual Test | 40 Questions with 100% Correct Answers | Verified

TAMIS Actual Test | 40 Questions with 100% Correct Answers | Verified

TAMIS Actual Test
what form is used to request ammunition in TAMIS – ✔✔e581
Once an e581 is Reconciled it can still be modified – ✔✔False
Training requirements data is based on _ and data – ✔✔STRAC and Requirements
the individuals signing blocks 13 and 14 of the TAMIS-generated e581 must be properly
authorized as indicated on the requesting units current – ✔✔DA Form 1687
What document would be required to request training ammunition within the 90 day lock out
window – ✔✔Commanders Unforecasted Memorandum
DA PAM 350-38 can be downloaded from TAMIS – ✔✔True
On block three of the e581 what item auto populates – ✔✔DODAAC
Munitions managers should not forecast more that 50 percent f their authorizations within the
first __
days of the FY – ✔✔120
AR 5-13 only applies to Active Duty Units – ✔✔FALSE

Once an e581 is Accepted by the ASP the requester can not modify the e581 – ✔✔TRUE
Once munitions are authorized to a unit what must be done at least 90 days out in order to draw
the munitions – ✔✔Forecast
All TAMIS-generated documents must be reconciled no later than _ days after the completion of the issue and/or turn-in – ✔✔15 Authorizations can be forecasted across fiscal years – ✔✔true to confirm forecasted munitions are posted in TAMIS what report would be run – ✔✔forecast summary report the quantities requested on the TAMIS-generated e581 can be changed after the signature of the approver in block 14 is applied – ✔✔false the forecast lock out period for conus ASPs is – ✔✔90-days (current plus next two months) Units will not “front load” their forecast in order to receive more than percent of their annual
authorizations in the first _ days of a FY – ✔✔50 % and 120 days