Q: What is the purpose of the solution context?
Answer:
Understand how the solution will be used by the customer
To identify critical aspects of a Solution’s operational environment
Q: What is the purpose of a program epic?
Answer:
An epic is a container for a significant solution development initiative that captures the more
substantial investments that occur within a portfolio
To capture Agile release train initiatives that cannot be completed in a single program increment
Q: Features are sized or split to fit what duration?
Answer:
Program Increment
Q: Who provides ART context and vision during PI planning?
Answer:
Product Management
Q: What are 2 benefits of PI objectives?
Answer:
Immediate feedback, decentralized decisions, predictability without specificity, commitment
To promote business agility by giving teams options on how they might deliver features
To promote the achievement of business outcomes over the completion of features
Q: Iteration goals serve what purpose?
Answer:
Align team members to a common purpose
Provide continuous management information
Align program teams to common PI objectives and manage dependencies
Provide continuous management information
Q: Why is the problem-solving workshop more effective than traditional lessons-learned
documents?
Answer:
It makes improvements actionable through backlog items for the next PI
Q: What is the importance of the definition of done?
Answer:
It creates a clear understanding of when items are complete
Q: An organization is conducting their first Program Increment Planning session, and the new
teams are asked to provide their capacity. Which three actions are part of the initial capacity
planning process? (choose 3)
Answer:
Find a small story that takes about a day to develop and call it a one
Subtract one point for every team member’s vacation day, public holiday or training day
Use eight points per person (adjust for part-time employees
Q: What are two examples of team-level events? (Choose 2)
Answer:
Daily stand up
Backlog refinement
Q: The goal is fast delivery process, ideally requiring little manual effort. What is one
capability used to achieve this?
Answer:
Features toggles
Q: The goal of the Product Owner is most closely aligned with which Agile Manifesto
principle?
Answer:
The highest priority is to satisfy the customer through early and continuous delivery of valuable
software
Q: Which principle of the Agile Manifesto is most aligned with conducting a System Demo?
Answer:
Working software is the primary measure of progress
Q: What is the purpose of iteration goals?
Answer:
To align the team members and the Product Owner (PO) to the mission
Q: Which two aspects of the Continuous Delivery Pipeline require the most involvement from
Product Management?
Answer:
Continuous Exploration and Release on Demand
Q: Which role is primarily responsible for working with business teams?
Answer:
Product Owner (PO)
Q: Which Agile Team event supports relentless improvement?
Answer:
Iteration Retrospective
Q: What are two primary responsibilities of Business Owners in Program Increment (PI)
Planning? (Choose 2)
Answer:
To set the business context
To assign business value
Q: What is the relationship between a Product Owner (PO and Product Management (PM)?
Powered by https://learnexams.com/search/study?query=

Which 2 statements are true about nonfunctional requirements?
They operate as constraints on the design of the system
They are associated with backlogs at all 4 levels of SAFe
What are 2 inputs to the Vision?
Customer feedback
strategic themes
Which 2 statements are true about the SAFe backlog model?
Stories are in the Team backlog, features are in the program backlog
During the PI planning meetings the PO coordinates with other POs, shared resources and who else?
Product Management
Who typically participated as the train’s business owners to approve the team’s PI objectives?
Product Management
When should a dependency be added to the program risks?
When it must be accepted
What are 3 elements of agile team capacity allocation that ensure a healthy balance of work?
Refractors, user stories, maintenance
How do SAFe continuous delivery pipeline activities map to the teams work each iteration within the PI?
Each iteration in the PI, teams are exploring, integrating, deploying, and potentially releasing new value
The SAFe definition of DevOps includes which 3 concepts?
Culture, technical practices, mindset
What is the primary focus of an operational value stream?
Contains the steps and the people who deliver end user value using the business solutions created by the development value streams Delivering end-user value
Which 2 responsibilities belong to the product owner?
Defines and accepts stories, acts as the customer for developer questions, works with PM to plan PIs, owns team backlog, defines iterations and stories, contributes to vision, roadmap, ROI, and accepts iteration increments
Prioritizing the Team Backlog
Drafting iteration goals
Product Management is responsible for which 3 activities?
Owns program backlog
defines features, PIs and releases
owns vision, roadmap, pricing, licensing and ROI
Collaborates on enablers
Establishes features and acceptance criteria
Establishing features and benefit hypothesis
Prioritizing features for optimum economic value
What is the purpose of the solution context?
Understand how the solution will be used by the customer
To identify critical aspects of a Solution’s operational environment
What is the purpose of a program epic?
An epic is a container for a significant solution development initiative that captures the more substantial investments that occur within a portfolio
To capture Agile release train initiatives that cannot be completed in a single program increment
Features are sized or split to fit what duration?
Program Increment
Who provides ART context and vision during PI planning?
Product Management
What are 2 benefits of PI objectives?
Immediate feedback, decentralized decisions, predictability without specificity, commitment
To promote business agility by giving teams options on how they might deliver features
To promote the achievement of business outcomes over the completion of features
Iteration goals serve what purpose?
Align team members to a common purpose
Provide continuous management information
Align program teams to common PI objectives and manage dependencies
Provide continuous management information
Why is the problem-solving workshop more effective than traditional lessons-learned documents?
It makes improvements actionable through backlog items for the next PI
What is the importance of the definition of done?
It creates a clear understanding of when items are complete
An organization is conducting their first Program Increment Planning session, and the new teams are asked to provide their capacity. Which three actions are part of the initial capacity planning process? (choose 3)
Find a small story that takes about a day to develop and call it a one
Subtract one point for every team member’s vacation day, public holiday or training day
Use eight points per person (adjust for part-time employees
What are two examples of team-level events? (Choose 2)
Daily stand up
Backlog refinement
The goal is fast delivery process, ideally requiring little manual effort. What is one capability used to achieve this?
Features toggles
The goal of the Product Owner is most closely aligned with which Agile Manifesto principle?
The highest priority is to satisfy the customer through early and continuous delivery of valuable software
Which principle of the Agile Manifesto is most aligned with conducting a System Demo?
Working software is the primary measure of progress
What is the purpose of iteration goals?
To align the team members and the Product Owner (PO) to the mission
Which two aspects of the Continuous Delivery Pipeline require the most involvement from Product Management?
Continuous Exploration and Release on Demand
Which role is primarily responsible for working with business teams?
Product Management (PM)
Which Agile Team event supports relentless improvement?
Iteration Retrospective
What are two primary responsibilities of Business Owners in Program Increment (PI) Planning? (Choose 2)
To set the business context
To assign business value
What is the relationship between a Product Owner (PO and Product Management (PM)?
The PO is team-oriented, PM is market-oriented
What is the primary job of Product Management when considering the Architectural Runway?
Ensuring sufficient capacity is allocated to Enablers
A Product Manager is working for an insurance company and is responsible for the internal systems used for managing claims. This is an example of what kind of value stream?
Development Value Stream
We have an expert-written solution to this problem!
Product Management works with which other role to define and maintain nonfunctional requirements?
System and Solution Architect / Engineering
What is enabled by the key components of the Continuous Delivery Pipeline?
Accelerated release of value
When should a Product Owner (PO) establish team objectives?
During the Program Increment (PI) Planning
When should innovation activities be conducted by teams on the Agile Release Train?
Throughout the Program Increment
What is a recommended time horizon of the Program Increment Roadmap?
Less then 1 year
In SAFe work item hierarchy, Features are decomposed into what?
Stories
What are personas?
Fictional characters that act as a representative user when discussing the backlog
Epics are decomposed into what?
Features
What is included in the Inspect and Adapt agenda?
Quantitative and qualitative measurement
What is a benefit of capacity allocation?
It ensures different types of backlog items are not compared against one another?
What are two strategies a Product Owner can use during Program Increment Planning to minimize dependencies (choose 2)
Move stories on their team’s backlog to another team
Split Stories to eliminate dependencies
What are two different types of Enabler Stories? (choose 2)
Exploration
Infrastructure
What is an input to the Program Increment Planning Process that highlights how Product Management plans to accomplish the Vision?
Top ten Features
How do Business Owners quantify the value of PI Objectives?
By assigning business value
Which two roles are good candidates for becoming a Product Owner (choose 2)
Business Analysts
Subject matter experts
Which function is responsible for ensuring that the Agile Release Train has the content needed to successfully engage in Program Increment Planning?
Product Management
What are the minimum requirements for a Feature?
Name, benefit hypothesis, and acceptance criteria
Which statement describes the Scaled Agile Framework?
It synchronizes alignment, collaboration, and delivery for large numbers of teams
Which role has the responsibility for accepting stories and team increments?
Release Train Engineer
Product Owner
Product Manager
Scrum Master
Which statement is true about fast feedback?
It supports SAFe Lean-Agile Principle #3 – Assume variability; preserve options
What is another name for technical or functional spikes needed to uncover knowledge or reduce risk in the next PI
Exploration Enables
Which leadership style helps create a safe environment for learning, growth, and mutual influenc
Leader as the developer of people
Scrum is built on transparency, inspection, and what els
Adaption
During which event are the Team PI Objectives agreed upon
PI Planning
Which role serves as the Servant Leader for the Agile Release Train
Release Train Engineer
Which statement is true about Lean Portfolio Management (LPM) and budgeting
LPM empowers stakeholders to adapt the current backlog and roadmap context
Who is responsible for managing the Portfolio Kanban?
Lean Portfolio Management
Optimizing flow means identifying and reducing what?
Delays
Which statement is true about Program events?
Team events run inside the Program events, and the Program events create a closed loop system
How can trust be gained between the business and development
Deliver predictability
When are planning adjustments communicated back to the Agile Release Train after the management review
At the beginning of day two
Why do Business Owners assign business value to Teams’ PI Objectives
To provide the teams with guidance of value to the business
What is this statement defining: “A series of activities that have proven to be effective in successfully implementing SAFe”?
The SAFe Implementation Roadmap
What is an example of cross-functional Iterations?
Iteration 1: Define, Build, Test; Define, Build, Test
What are two ways to describe a cross-functional Agile team? (Choose two.)
They are optimized for communication and delivery of value
They can define, build, and test a feature or component
What are two items that appear on the program board? (Choose two.)
Dependencies related to Features
Dependencies between teams
Which two areas are part of the Scaled Agile Framework Core Values? (Choose two.)
Built-in Quality
Alignment
What is the primary focus of Lean Portfolio Management?
Align Lean-Agile development with business strategy
Which statement is true about stretch Team PI Objectives?
They are part of the load but are not part of the commitment
What is an example of applying cadence and synchronization in SAFe?
Conducting a PI Planning Meeting
Which statement is a value from the Agile Manifesto?
Working software over comprehensive documentation
Why is it important to decouple deployment from release?
To enable deploying upon demand
What are the top two reasons for adopting Agile in an organization? (Choose two.)
Enable changing priorities
Accelerate product delivery
When would Large Solution SAFe be needed?
When there are more than two Agile Teams
If small batches go through the system faster with lower variability, then which statement is true about batch size?
Severe project slippage is the most likely result of large batches
If a program repeatedly shows separate feature branches rather than a true System Demo, which practice should be reviewed to address the issue?
Continuous Integration
Which statement is true about Solution Context when defining large solutions?
It defines the environment in which the Solution operates
According to the Harvard Business Review article titled, “The New New Product Development Game”, what does it mean to create built-in instability?
Provide challenging requirements and a high degree of freedom to meet the requirements
The analyzing step of the Portfolio Kanban system has a new Epic with a completed Lean business case. What best describes the next step for the Epic?
It will be moved to the Portfolio Backlog if it receives a “Go” decision from Lean Portfolio Management
Which statement is a principle from the Agile Manifesto?
Working software is the primary measure of progress
At the end of PI Planning after dependencies are resolved and risks are addressed, a confidence vote is taken. What is the default method used to vote?
Fist of Five
What is the roof of the SAFe House of Lean?
Value
What is a benefit of enhancing enterprise agility?
It allows for a faster response to changing market opportunities
Weighted Shortest Job First gives preference to jobs with which two characteristics? (Choose two.)
Shorter duration
Higher Cost of Delay
What does the Continuous Delivery Pipeline enable?
Continuous learning cycles
What is the best measure of progress for complex system development?
System Demo
Which three types of decisions should remain centralized even in a decentralized decision-making environment? (Choose three.)
Long lasting decisions
Infrequent decisions
Decisions with significant economies of scale
Which SAFe Principle includes providing autonomy with purpose, mission, and minimum constraints?
Unlock the intrinsic motivation of knowledge workers
SAFe’s first Lean-Agile Principle includes “Deliver early and often” and what else?
Deliver value incrementally
What is one key purpose of DevOps?
DevOps joins development and operations to enable continuous delivery
A team has just adopted the SAFe Implementation Roadmap and is in the process of training executives, managers, and leaders. What is their next step?
Identify Value Streams and Agile Release Trains
Strategic Themes are different business objectives which help guide Solutions. Where are Strategic Themes found in the SAFe Big Picture?
Portfolio Level
What is one pillar of the SAFe House of Lean?
Flow
When should new approaches be anchored in an organization’s culture?
Culture change comes last as a results of changing work habits
What is an attribute of an application built with DevOps in mind?
It ensures continuous integration with manual deployment
Acceptance criteria provides the details of the story from a testing point of view, and it is created by who?
Product Owner
Enabler Epics are used to advance what in order to support upcoming Business Epics?
The Architectural Runway
Epic Owners collaborate with which two other roles in a typical Portfolio Kanban system? (Choose two.)
System and Solution Architect/Engineering
Business Owners
Epics require an Epic Owner and what else?
Lean Business Case
Features in Program Backlogs can result from what?
Splitting Epics or Capabilities
The first three elements of the Continuous Delivery Pipeline work together to support delivery of small batches of new functionality. These continuous elements include Exploration, Integration, and what else?
Deployment
Product Management has content authority for the Program Backlog including: the Vision, the Roadmap, driving the PI Objectives, and what else?
Establishing Features and benefit hypotheses
Which statement characterizes the perspectives of the definition of done (DoD)?
Product Owners focus on the Iteration while Product Managers focus on the release
Which statement is true about estimating and forecasting the Portfolio Backlog?
Feature estimates are rolled up into Epic estimates
An organization is conducting their first Program Increment Planning session, and the new teams are asked to provide their capacity. Which three actions are part of the initial capacity planning process?
Subtract one point for every team member’s vacation day, public holiday, or training day
Find a small story that takes about a day to develop and call it a one
Use eight points per person (adjust for part-time employees)
What is one way Kanbans are used in SAFe?
To manage queue length
How do Product Owners contribute to the Vision?
By communicating emerging requirements and opportunities
In the first step of SAFe’s Continuous Delivery Pipeline, Product Owners and Managers do what activity?
Hypothesize on what would create value to their Customers
What is one way to establish a team’s velocity?
Look at the average Story points completed from the last Iterations
What is the primary purpose of PO sync?
To assess progress of the Program Increment and adjust scope and priority as needed
When tracking team progress, what can a Kanban board show the team?
Where the team has too much work-in-process (WIP)
What is a recommended time horizon of the Solution Roadmap?
1-3 years
The goal is a fast delivery process, ideally requiring little manual effort. What is one capability used to achieve this?
Feature toggles
Which two responsibilities belong to the Product Owner?
Prioritizing the Team Backlog
Drafting Iteration Goals
What are two ways in which the SAFe House of Lean might influence a Product Owner? (Choose two.)
Collaborate with Agile Teams to develop Stories with clear acceptance criteria
Help Agile Teams gain a clear understanding of their
Customers
Communicating the Vision to the Agile Release Train during Program Increment Planning supports which SAFe Core Value?
Alignment
What are two inputs to the Vision? (Choose two.)
Strategic Themes
Customer Feedback
What is the purpose of the Solution Context?
To identify critical aspects of a Solution’s operational environment
A Product Owner is noticing that overall quality is starting to degrade. What might they do to address the problem?
Reinforce the definition of done
Which design-thinking tool is most likely to help an Agile Release Train (ART) during Program Increment (PI) Planning to ensure that the PI will deliver a Solution that is differentiated from competitive offerings?
Whole-product thinking
The Customer is asking for a forecast for when a specific Feature will be available. Where could Product Management find this information?
Solution Roadmap
How can Product Management leverage market rhythms?
Adjust the delivery of Features to better meet market needs
Product Management is expected to collaborate in planning the amount of upcoming Enabler work by establishing what?
Capacity Allocation
Which statement is true about WSJF?
It includes cost of delay and the unit of size
Who provides Agile Release Train context and Vision during PI Planning?
Product Management
Who typically participates as the train’s Business Owners to approve the team’s PI Objectives?
Product Management
The recommended structure for writing User Stories is?
As a…,
I want…,
So that…
Which two statements are true about estimating Features using Story points? (Choose two.)
Story point estimation is done on cadence during backlog refinement
More than one team may be involved in the estimation;
Iteration Goals serve what purpose?
To align team members to a common purpose
What are three elements of INVEST? (Choose three.)
Testable
Valuable
Independent
What are three elements of Agile Team capacity allocation that ensure a healthy balance of work?
Refactors
User Stories
Maintenance
Which two groups should attend every Iteration Review?
The team’s Product Owner
The team members
What happens to improvement items identified during the Iteration Retrospective?
They are entered as Stories in the Team Backlog
The first three elements of the Continuous Delivery Pipeline work together to support delivery of small batches of new functionality which are released in accordance with what?
Market Needs
SAFe recommends separating deployment from release. What can help with this practice?
Hide all new functionality under feature toggles
Who should attend the PO sync?
The Product Owners, Product Management, and other stakeholders as needed
What is a common anti-pattern related to System Demos?
Team demos are accepted in place of a System Demo to avoid redundancy
Which situation best indicates the presence of an innovation riptide?
When team and Agile Release Train innovations turn into portfolio-level strategic initiatives
Which two statements are true about the SAFe backlog model?
Stories are in the Team Backlog
Features are in the Program Backlog
Which two statements are true about nonfunctional requirements? (Choose two.)
They are associated with backlogs at all four levels of SAFe
They operate as constraints on the design of the system
What is the purpose of a Program Epic?
To capture Agile Release Train initiatives that cannot be completed in a single Program Increment
What does assigning business value to a team’s PI Objectives influence?
How teams plan the implementation
During the Program Increment Planning meetings the Product Owner coordinates with other Product Owners, shared resources, and who else?
Product Management
What is the primary focus of an operational Value Stream?
Delivering end-user value
The Funnel state in the Program Kanban welcomes all new Features. It may include new functionality, Enabler Features and what else?
Enhancing existing functions
During the PI Planning meetings the Product Owner coordinates with other Product Owners, shared resources, and who else?
The System Architect/Engineer
How frequently should the Program Backlog be reviewed?
Continuously
How is value at the Program Level defined?
By Features
The Iteration Retrospective is used to reflect on the Iteration that was just completed and to come up with new ideas to improve the process. Where are these improvement items entered?
Into the Team Backlog
Just before PI Planning the Product Manager is informed by the teams that a Feature from the top 10 list cannot be implemented because they lack the technical knowledge on how to implement it. What should the Product Manager do?
Create an Enabler to look into possible solutions and provide a recommendation
Kanbans are the primary mechanism to achieve SAFe Principle #6, which includes visualizing and limiting Work-in-Process, reducing batch sizes, and what else?
Managing queue length
A Lean Business Case can identify the impact on sales and which other two areas? (Choose two.)
Distribution
Deployment
The Lean Governance collaboration include the Enterprise Architect, Agile PMO, and which other function?
Business Owners
The Lean Portfolio Management function is primarily responsible for strategy and investment funding, governance, and what else?
Agile portfolio operations
The Portfolio Kanban Funnel captures all new big ideas from any source. What are two typical drivers of Epic creation? (Choose two.)
Identifying problems with existing
solutions that block business or technical performance
Improving the efficiency or cost for a solution or its
operation
Predictable incremental delivery occurs based on which two practices? (Choose two.)
Cadence
Synchronization
Product Management is involved in the assessment of metrics including the evaluation of business value achieved versus plan. They are also active participants in what else?
The Inspect and Adapt event
The Product Manager for an organization’s website is conducting an A/B testing analysis on certain web pages. Which stage of the Continuous Exploration process does this represent?
Research
The Product Manager has content authority for the Program Backlog including: the Vision, the Roadmap, driving the PI Objectives, and what else?
Establishing Features and Benefit Hypothesis
The Product Manager is responsible for which three activities? (Choose three.)
Assigning Agile Release Trains to a common technological and architectural vision
Establishing Features and Benefit Hypothesis
Defining Program Backlog content
The Product Manager makes weekly visits to a customer’s site. Which two Agile Manifesto Values support this behavior? (Choose two.)
Individual interactions over processes and tools
Customer collaboration over contract negotiation
Product Managers are expected to collaborate in planning the amount of upcoming Enabler work by establishing what?
Capacity allocation
The Product Owner has content authority for the Team Backlog including accepting stories and team increments, establishing story acceptance criteria, and what else?
Helping to drive PI Objectives at the Team Level
A Program Increment relates to the Agile Release Train like an Iteration relates to what?
The Agile Team
The team is struggling to agree on the story point sizing of a new user story. The PO was previously a related domain expert and feels the team is wasting time. What should she do?
Continue to support the team’s decision on sizing
Three collaborations make up the Lean Portfolio Management competency: Strategy and Investment Funding, Lean Governance, and what else?
Agile Portfolio Operations
True or False: Epics are estimated in story points rolled up from feature estimates
True
What are three considerations when creating a Lean Business Case? (Choose three.)
Define the outcomes hypothesis
Avoid over-specificity
Understand implementation impact
What are three outputs of Synthesis? (Choose three.)
Program Backlog
Vision
Program Roadmap
What are two inputs to the Solution Vision? (Choose two.)
Customer feedback
Strategic Themes
What are two roles of the Product Manager in Large Solution SAFe? (Choose two)
Collaborate with Solution Management
Participate in pre- and post-PI Planning
What are two types of Enabler stories? (Choose two.)
Research Spikes
Epic Enablers
What does Big Up-Front Design and Big Up-Front Financial commitment represent?
A poor way to foster innovation
What does the Lean UX process begin with?
A benefit hypothesis
What is an example of a Solution Vision statement?
How will our future solution solve customer problems
What is one benefit of constant customer feedback?
Fast learning cycles
What is one non-Lean behavior that organizations demonstrate when prioritizing?
Accepting that a high return on investment (ROI) is always more important than a Feature with a low ROI
What is one of the questions the Product Management team must answer in order to create a Vision?
Which problem will the Solution solve
What is the goal of Lean thinking?
Best quality and value for people and society
What is the most important activity for Product Management in the Releasing step of the Program Kanban?
Validate the hypothesis of Features
What is the purpose of an Epic Hypothesis Statement?
It is the artifact Epics use to get approval to go on the
Portfolio Backlog from the Lean Portfolio Management
What should a team do if they cannot meet their commitments?
Review the objectives and reset them to fit what
can be done
What should be understood in order to achieve the goals of Release on Demand?
How to separate the release from the development cadence
What should PI Objectives be based on?
Progress towards the hypothesis
What term characterizes an initiative that requires financial approval before implementation?
Epic
When an Epic meets the Go criteria in a go or no-go decision, where does the Epic move to?
The Portfolio Backlog
When moving to a Lean Portfolio Management capability, centralized control becomes decentralized decision making, and project-based funding and control becomes what?
Lean budgeting and self-managing Agile Release Trains
When prioritizing the backlog, what does taking an economic view mean?
Business value is more important than time criticality
Which attribute describes the Product Manager role in the SAFe enterprise?
Collaborates and sets expectations with Product
Owners, stakeholders, customers, architects
Which attribute describes the Product Owner role in the SAFe enterprise?
To operate as part of an extended Product Management Team
Which cycle is embraced by the Lean startup movement?
Hypothesize-Build-Measure-Learn
Which role defines and prioritizes the Program Backlog?
Product Management
Which role is responsible for working with customers and creating the Vision?
Product Manager
Which SAFe Lean-Agile Principle supports applying a Set-Based design approach?
Assume variability, preserve options
Which statement describes the DevOps and Release on Demand enterprise competency?
It organizes around the ability to release value on demand through the Continuous Delivery Pipeline
Which statement describes the Team and Technical Agility enterprise competency?
Cross-functional, self-organizing teams that define, build, test and possibly deploy valuable things
Which three actions would a Product Manager take to assess customer needs? (Choose three.)
Initiate elicitation discussions
Go through a Gemba walk
Conduct customer visits
Which two concepts drive the mindset for SAFe implementation? (Choose two.)
Agile Manifesto
House of Lean
Which two options are part of the SAFe Core Values? (Choose two.)
Program execution
Transparency
Which two responsibilities belong to the Product Owner? (Choose two.)
Defining Iteration Goals
Prioritizing the Team Backlog
Which two statements are true about decentralizing decision- making? (Choose two.)
Product Owners make Team Level content decisions
Teams should make backlog decisions based on Product
Owner and/or Product Manager feedback
Which two statements are true about non-functional requirements? (Choose two.)
They are associated with backlogs at all four levels of SAFe
They are part of an Epic Hypothesis Statement
Which two statements are true about story points and estimation? (Choose two.)
Story point estimation is done on cadence during backlog refinement
More than one team may be involved in the estimation
Which two types of items are maintained in the Team Backlog? (Choose two.)
Enabler Stories
User Stories
Why would Product Owners and Product Managers be key collaborators in the enterprise?
They are key roles in steering and sequencing the Agile
Release Train priorities
The Work-in-Process limit at the Analyzing step of the Program Kanban is based on the overall availability of Product Management, other subject matter experts, and the capacity of which two other roles? (Choose two.)
Business Owners
System Architects
Product Management is responsible for which three activities? (Choose three.)
Prioritizing Features for optimum economic value
Defining Program Backlog content
Establishing Features and benefit hypotheses
The team is struggling to agree on the Story point sizing of a new User Story. The Product Owner was previously a related domain expert and feels the team is wasting time. What should she do?
Continue to support the team’s decision on sizing
What are two benefits of Program Increment (PI) Objectives?
To define when the Solution will be released
To promote the achievement of business outcomes over the completion of Features
What are two ways in which the SAFe House of Lean might
influence a Product Owner? (Choose two.)
Collaborate with Agile Teams to develop Stories with clear acceptance criteria
Help Agile Teams gain a clear understanding of their
Customers
What does assigning business value to a team’s PI Objectives
influence?
How teams plan the implementation