HAZWOPER 40 – Lesson 24 Quiz | Questions with 100% Correct Answers | Verified | Latest Update 2024 / 2025
HAZWOPER 40 – Lesson 24 Quiz
Question:
The annual review of the exposure control plan must document:
Answer:
Consideration and use of appropriate commercially available safer medical
devices
Question:
Why does the revised Standard require the involvement of frontline
employees in selecting safer devices?
Answer:
This ensures that workers using these devices have the opportunity to
impact purchasing decisions.
Question:
The revision to the Bloodborne Pathogens Standard added new requirements
for employers, including:
Answer:
Additions to their exposure control plans regarding safer sharps
The requirement to keep sharps injury logs
Powered by https://learnexams.com/search/study?query=
Revisions to the OSHA Bloodborne Pathogens Standard were:
Mandated because occupational exposure to BBPs from accidental sharps injuries in healthcare and other occupational settings continues to be a serious problem
The annual review of the exposure control plan must document:
One new element added to the employer’s annual review of the exposure control plan requirements:
Reflects changes in technology that eliminate or reduce exposure to BBPs
Specifically, the revised OSHA Bloodborne Pathogens Standard obligates employers to consider safer needle devices when they conduct their annual exposure control plan (ECP) review.
True
The revision to the Bloodborne Pathogens Standard added new requirements for employers, including:
A and B
Needleless systems means any device that does not use needles for:
All of the above
According to the revised Standard, engineering controls mean:
Controls like self-sheathing needles, safer medical devices, and needleless systems
Why does the revised Standard require the involvement of frontline employees in selecting safer devices?
The purpose of the sharps injury log is:
To help both employees and employers track all needlesticks to help identify problem areas or operations
Which of the following is an example oof engineering controls under the revised definition?
All are examples