{"id":130644,"date":"2023-12-19T20:55:07","date_gmt":"2023-12-19T20:55:07","guid":{"rendered":"https:\/\/learnexams.com\/blog\/?p=130644"},"modified":"2023-12-19T20:55:09","modified_gmt":"2023-12-19T20:55:09","slug":"nccco-tower-crane-test-new-2023-2024-update-questions-and-verified-answers-graded-a-100-correct","status":"publish","type":"post","link":"https:\/\/www.learnexams.com\/blog\/2023\/12\/19\/nccco-tower-crane-test-new-2023-2024-update-questions-and-verified-answers-graded-a-100-correct\/","title":{"rendered":"NCCCO Tower Crane Test (New 2023\/ 2024 Update) Questions and Verified Answers| Graded A| 100% Correct"},"content":{"rendered":"\n<p>NCCCO Tower Crane Test (New 2023\/ 2024 Update) Questions and Verified Answers| Graded A| 100% Correct<\/p>\n\n\n\n<p>NCCCO Tower Crane Test (New 2023\/ 2024<br>Update) Questions and Verified Answers|<br>Graded A| 100% Correct<br>QUESTION<br>According to AMSE B30.3 an overhead powerline is ALWAYS considered to be:<br>Answer:<br>Energized until the power company has verified it is not energized<br>QUESTION<br>High tensile bolts shall be marked with manufacturers designation and:<br>Answer:<br>Strength rating<br>QUESTION<br>Bolt connections for tower sections must use high tensile strength nuts with ratings of:<br>Answer:<br>12<br>QUESTION<br>Washers used in high tensile bolt connections shall be marked with:<br>Answer:<br>HV<\/p>\n\n\n\n<p>QUESTION<br>Before installation high tensile bolt connection Components shall be cleaned and visually<br>examined for:<br>Answer:<br>Damage and corrosion<br>QUESTION<br>When ready to torque the nut on a high tensile bolt connection you should:<br>Answer:<br>Lubricate threads<br>QUESTION<br>During tightening of high tensile connections the bolt is stretched to a specific percentage of its<br>elastic limit at the correct:<br>Answer:<br>Torque<br>QUESTION<br>Preferably the tightening torque shall be applied to the:<br>Answer:<br>Nut<br>QUESTION<br>The tightening torque values placed on the nuts and bolts of high tensile bolt connection are<br>dependent on the:<br>Answer:<br>Type and size<\/p>\n\n\n\n<p>QUESTION<br>What components of a tower crane are connected with high tensile bolt connections?<br>Answer:<br>Foundation anchors, tower sections, slewing ring support<br>QUESTION<br>When the Tower base bolts are torqued the counter jib should be positioned:<br>Answer:<br>0\u00b0 from the bolt<br>QUESTION<br>According to the NCCCO tower crane reference manual what items below should be part of the<br>operators Daily pre-check?<br>Answer:<br>Wire ropes, limit switches<br>QUESTION<br>According to the NCCCO tower crane reference manual, how many safety turns (wraps) must<br>be left on the hoist drum when the load hook is in its lowest position?<br>Answer:<br>3<br>QUESTION<br>According to the NCCCO tower crane reference manual,when possible, installing the hoist wire<br>rope on a tower crane you should wind the rope with approximately how much of the maximum<br>permissible load?<\/p>\n\n\n\n<p>Answer:<br>10%<br>QUESTION<br>According to ASME B30.3, what is the design factor for rotation resistant load hoist wire rope?<br>Answer:<br>5.0 to 1<br>QUESTION<br>Who determines the correct hoist wire rope to be installed on tower cranes?<br>Answer:<br>Manufacturer<br>QUESTION<br>What grade alloy steel chain should be used for crane hoisting slings?<br>Answer:<br>80<br>QUESTION<br>According to ASME B30.3, using rotation resistant running rope on a tower crane, how many<br>broken wires in six rope diameters can you have to leave it in service?<br>Answer:<br>1<br>QUESTION<br>Powered by <a href=\"https:\/\/learnexams.com\/search\/study?query=\" target=\"_blank\" rel=\"noopener\">https:\/\/learnexams.com\/search\/study?query=<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><a href=\"https:\/\/learnexams.com\/search\/study?query=\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" src=\"https:\/\/learnexams.com\/blog\/wp-content\/uploads\/2023\/12\/nccco-tower-crane-test-new-2023-2024-update-questions-and-verified-answers-graded-a-100-correct-725x1024.png\" alt=\"\" class=\"wp-image-130645\" style=\"width:1004px;height:auto\"\/><\/a><figcaption class=\"wp-element-caption\">NCCCO Tower Crane Test (New 2023\/ 2024 Update) Questions and Verified Answers| Graded A| 100% Correct<\/figcaption><\/figure>\n\n\n\n<p>Which of the following OSHA regulations govern suspended personnel platforms?<br>OSHA 1926.1431<\/p>\n\n\n\n<p>According to ASME B30.3 The prohibited zone for power lines that are 60 kV is<br>15 ft<\/p>\n\n\n\n<p>According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of<br>5 to 1<\/p>\n\n\n\n<p>According to ASME B30.3 when Lifting a suspended personnel platform design factor for the rigging hardware is<br>5 to 1<\/p>\n\n\n\n<p>According to ASME B30.3 Load hoist ropes that are not rotation resistant must have a design factor of<br>5 to 1<\/p>\n\n\n\n<p>The OSHA construction standard for rigging equipment is<br>1926.251<\/p>\n\n\n\n<p>According to ASME B30.3 on who&#8217;s recommendations should a preventative maintenance program be set up?<br>Crane manufacturer<\/p>\n\n\n\n<p>When using cable or nylon spreaders it is important to remember:<br>The lower the spreader angle the greater the tension<\/p>\n\n\n\n<p>According to OSHA when testing a man basket how long must the test pick be maintained?<br>5 minutes<\/p>\n\n\n\n<p>According to ASME B30.3 What is the minimum pitch diameter for load hoisting sheaves?<br>Not less than 18 times rope diameter<\/p>\n\n\n\n<p>According to ASME B30.3 what is the minimum pitch diameter for load block sheaves?<br>Not less than 16 times rope diameter<\/p>\n\n\n\n<p>According to ASME B30.3 what is the minimum pitch diameter for boom hoist sheaves?<br>Not less than 15 times rope diameter<\/p>\n\n\n\n<p>According to OSHA when lifting personnel the cranes hook must be the type that<br>Can be closed and locked<\/p>\n\n\n\n<p>According to OSHA when working over water with a man basket are the people inside required to wear a belt\/harness?<br>No harness or belt required<\/p>\n\n\n\n<p>According to ASME B30.3 when working near powerlines where should caution stickers be installed?<br>Operator station and at the base of the crane<\/p>\n\n\n\n<p>According to OSHA a frequent inspection is:<br>Daily to monthly<\/p>\n\n\n\n<p>According to OSHA a periodic inspection is:<br>Monthly to annually<\/p>\n\n\n\n<p>Cranes idle for more than six months must have inspections performed:<br>Frequent and periodic<\/p>\n\n\n\n<p>Cranes idle for less than six months must have inspections performed:<br>Frequent<\/p>\n\n\n\n<p>Cranes lifting personnel platform must have the platform and rigging inspected:<br>Prior to each shift<\/p>\n\n\n\n<p>Crane hooks must not be twisted in excess of:<br>10 degrees<\/p>\n\n\n\n<p>A Crane hook&#8217;s throat must not exceed:<br>15% of its original size<\/p>\n\n\n\n<p>By order of hitch strength which is the correct answer?<br>Basket,vertical ,choker<\/p>\n\n\n\n<p>According to ASME B30.3 And OSHA you should always have at least how many wraps on the hoist drum?<br>2<\/p>\n\n\n\n<p>What is the minimum allowable distance from the crane and power lines under 50 kV?<br>10 ft<\/p>\n\n\n\n<p>According to ASME B30.3 How many randomly broken wires must there be to remove a running wire rope from service?<br>12<\/p>\n\n\n\n<p>According to ASME B30.3 when working near power lines when is a signal person required?<br>When crane moves within a booms length of power lines<\/p>\n\n\n\n<p>According to OSHA after the crane has been checked out and before personnel lift operations begin the crew should:<br>Have a pre-lift meeting<\/p>\n\n\n\n<p>According to OSHA when is it safe to work closer than the allowable distance from power lines?<br>When utility company says lines are De-Energized<\/p>\n\n\n\n<p>When should a tagline be used?<br>When rotation of load would be dangerous<\/p>\n\n\n\n<p>What is the minimum design factor required for a boom hoist rope?<br>3.55<\/p>\n\n\n\n<p>How many broken wires must be present in one strand of one lay for running wire rope to be removed from service?<br>4<\/p>\n\n\n\n<p>What is the maximum permitted wind speed when climbing a tower?<br>20 mph<\/p>\n\n\n\n<p>According to ASME B30.3 A crane should be plumbed to:<br>1 to 500<\/p>\n\n\n\n<p>According to ASME B30.3 The rated load under static conditions shall not exceed <strong><em>_<\/em><\/strong> of calculated tipping loads<br>63%<\/p>\n\n\n\n<p>According to AMSE B30.3 an overhead powerline is ALWAYS considered to be:<br>Energized until the power company has verified it is not energized<\/p>\n\n\n\n<p>High tensile bolts shall be marked with manufacturers designation and:<br>Strength rating<\/p>\n\n\n\n<p>Bolt connections for tower sections must use high tensile strength nuts with ratings of:<br>12<\/p>\n\n\n\n<p>Washers used in high tensile bolt connections shall be marked with:<br>HV<\/p>\n\n\n\n<p>Before installation high tensile bolt connection Components shall be cleaned and visually examined for:<br>Damage and corrosion<\/p>\n\n\n\n<p>When ready to torque the nut on a high tensile bolt connection you should:<br>Lubricate threads<\/p>\n\n\n\n<p>During tightening of high tensile connections the bolt is stretched to a specific percentage of its elastic limit at the correct:<br>Torque<\/p>\n\n\n\n<p>Preferably the tightening torque shall be applied to the:<br>Nut<\/p>\n\n\n\n<p>The tightening torque values placed on the nuts and bolts of high tensile bolt connection are dependent on the:<br>Type and size<\/p>\n\n\n\n<p>What components of a tower crane are connected with high tensile bolt connections?<br>Foundation anchors, tower sections, slewing ring support<\/p>\n\n\n\n<p>When the Tower base bolts are torqued the counter jib should be positioned:<br>0\u00b0 from the bolt<\/p>\n\n\n\n<p>According to the NCCCO tower crane reference manual what items below should be part of the operators Daily pre-check?<br>Wire ropes, limit switches<\/p>\n\n\n\n<p>According to the NCCCO tower crane reference manual, how many safety turns (wraps) must be left on the hoist drum when the load hook is in its lowest position?<br>3<\/p>\n\n\n\n<p>According to the NCCCO tower crane reference manual,when possible, installing the hoist wire rope on a tower crane you should wind the rope with approximately how much of the maximum permissible load?<br>10%<\/p>\n\n\n\n<p>According to ASME B30.3, what is the design factor for rotation resistant load hoist wire rope?<br>5.0 to 1<\/p>\n\n\n\n<p>Who determines the correct hoist wire rope to be installed on tower cranes?<br>Manufacturer<\/p>\n\n\n\n<p>What grade alloy steel chain should be used for crane hoisting slings?<br>80<\/p>\n\n\n\n<p>According to ASME B30.3, using rotation resistant running rope on a tower crane, how many broken wires in six rope diameters can you have to leave it in service?<br>1<\/p>\n\n\n\n<p>According to ASME B30.3, a periodic inspection of tower cranes wire rope shall be performed at least?<br>Annually<\/p>\n\n\n\n<p>According to ASME B30.3, which inspection does not require records to be kept?<br>Frequent<\/p>\n\n\n\n<p>Wire rope lubricant is very important. It should be applied according to who&#8217;s recommendations?<br>Manufacturer<\/p>\n\n\n\n<p>When you have core failure in wire rope, a common result is?<br>Reduction in diameter<\/p>\n\n\n\n<p>According to OSHA 1926.550, who is responsible for machinery and equipment inspection before each use?<br>Foreman<\/p>\n\n\n\n<p>When is it permitted to shift the hoist gear of a tower crane?<br>Neutral gear<\/p>\n\n\n\n<p>According to ASME B30.3 , an overhead powerline is ALWAYS considered to be:<br>Energized until the power company has verified it is not energized<\/p>\n\n\n\n<p>According to ASME B30.3, Maintenance personnel are permitted to operate the crane only when:<br>Performing their duties<\/p>\n\n\n\n<p>According to ASME B30.3, Who should be present when telescoping or climbing operations begin?<br>Operator<\/p>\n\n\n\n<p>According to OSHA 1926.550, when a wire rope bridal is used to connect a personnel platform to the load line, each bridal leg shall be connected to a:<br>Master link<\/p>\n\n\n\n<p>Hand signals to construction tower crane operators shall be those prescribed by:<br>ASME B30.3<\/p>\n\n\n\n<p>According to OSHA 1926. 550, what shall be provided at both ends of travel of the trolley?<br>Buffers<\/p>\n\n\n\n<p>According to ASME B30.3, All controls shall be tested by the operator:<br>At the start of a new shift<\/p>\n\n\n\n<p>According to ASME B30.3 which is the correct statement:<br>Rated loads when wind is considered, the combined effects of static inertial and wind shall not exceed 77% of calculated tipping loads<\/p>\n\n\n\n<p>According to OSHA 1926-550 a class <strong><em>_<\/em><\/strong> fire extinguisher shall be kept in the cab or on the machinery platform:<br>5BC or higher<\/p>\n\n\n\n<p>According to ASME B30.3, where must a wind velocity indicating device be mounted?<br>At or near the top of the crane<\/p>\n\n\n\n<p>According to ASME B30.3, a frequent inspection shall be performed by a:<br>Designated person<\/p>\n\n\n\n<p>According to ASME B30.3, a frequent inspection in light service conditions must be performed:<br>Monthly<\/p>\n\n\n\n<p>According to ASME B30.3 A frequent inspection in normal service conditions must be performed:<br>Weekly to Monthly<\/p>\n\n\n\n<p>According to ASME B30.3,A frequent inspection in heavy service conditions must be performed:<br>Daily to weekly<\/p>\n\n\n\n<p>According to ASME B30.3, a periodic inspection in light service conditions must be performed:<br>Annually<\/p>\n\n\n\n<p>According to ASME B30.3, a periodic inspection in normal service conditions must be performed:<br>Semi annually to annually<\/p>\n\n\n\n<p>According to ASME B30.3, a periodic inspection in heavy service conditions must be performed:<br>Quarterly<\/p>\n\n\n\n<p>According to ASME B30.3, when shall pre-operational testing be perform:<br>After erection and each climbing operations<\/p>\n\n\n\n<p>According to ASME B30.3 Load Limit Device settings shall be verified by means of a static test using test loads of <strong><em><strong><em>_<\/em><\/strong><\/em><\/strong> of applicable reading:<br>102.5% &#8211; 110%<\/p>\n\n\n\n<p>According to ASME B30.3, hoist rope should be visually inspected at least once each:<br>Work day<\/p>\n\n\n\n<p>According to ASME B30.3, Trolley rope should be visually inspected at least once each:<br>Month<\/p>\n\n\n\n<p>According to ASME B30.3, rotation resistant wire rope shall be removed from service if:<br>There are 2 randomly distributed broken wires in six rope diameters or 4 randomly distributed broken wires in thirty rope diameters<\/p>\n\n\n\n<p>According to ASME B30.3, if MORE than <strong><em>__<\/em><\/strong> Broken wires at the end connection the wire rope shall be ore-socketed or replaced:<br>2<\/p>\n\n\n\n<p>According to ASME B30.3, Who should be present during climbing or telescoping operations?<br>Operator 3<\/p>\n\n\n\n<p>According to ASME B30.3, The operator shall test the brakes each time lifting a rated load by:<br>Lifting it a few inches and applying the brakes<\/p>\n\n\n\n<p>According to ASME B30.3, personnel platforms shall be limited to capacity of_______ Persons<br>6<\/p>\n\n\n\n<p>According to OSHA 1926.550, personnel platforms shall be limited to how many occupants?<br>Number required for the work being performed<\/p>\n\n\n\n<p>According to ASME B30.3 Personnel platform shall be proof tested with what percentage of the platforms rated capacity?<br>200%<\/p>\n\n\n\n<p>According to ASME B30.3, What is the duration of a proof test?<br>5 minutes<\/p>\n\n\n\n<p>According to ASME B30.3, personnel platforms should not be used in winds in excess of:<br>15 mph<\/p>\n\n\n\n<p>According to ASME B30.3 if any controls do not operate properly they shall be adjusted or repaired prior to:<br>Commencing the next lift operation<\/p>\n\n\n\n<p>According to OSHA, wire rope slings shall not be used if, in any length of eight diameters, the total number of visible broken wires exceed <strong>_<\/strong> Percent of the total number of wires:<br>10<\/p>\n\n\n\n<p>According to OSHA 1926.251, rigging hardware shall be inspected:<br>Prior to each shift<\/p>\n\n\n\n<p>According to OSHA 1926.251, custom designed rigging hardware shall be proof tested to _______Percent of their rated load:<br>125<\/p>\n\n\n\n<p>According to OSHA 1926.251 safety factor of______ must be maintained on all wire rope slings.<br>5<\/p>\n\n\n\n<p>According to OSHA 1926.251, all rigging and rigging hardware must be inspected by a:<br>Competent person<\/p>\n\n\n\n<p>The maximum included angle allowed when attaching slings directly to the hook is________degrees.<br>90<\/p>\n\n\n\n<p>Slings shall be removed from service if hooks are cracked or have been opened more than_______ percent of the normal throat opening measured at the narrowest point.<br>15<\/p>\n\n\n\n<p>Slings shall be removed from service if hooks are twisted more than______degrees from the plane of the unbent hook.<br>10<\/p>\n\n\n\n<p>According to OSHA 1926.753, cranes being used in steel erection activities shall be visually inspected by a competent person:<br>Prior to each shift<\/p>\n\n\n\n<p>According to OSHA 1926.753 All loads shall be rigged by a:<br>Qualified rigger<\/p>\n\n\n\n<p>According to OSHA 1926.753, the maximum number of pieces that you may Christmas tree is?<br>5<\/p>\n\n\n\n<p>According to OSHA 1926.753, what is the minimum distance between pieces during Christmas tree operations?<br>7 feet<\/p>\n\n\n\n<p>According to OSHA 1926.753, all hooks used will be equipped with_____latches.<br>Self closing<\/p>\n\n\n\n<p>According to OSHA 1926.753, a critical lift means a lift that exceeds_______percent of the rated capacity of the crane or derrick or requires the use of more than one crane or derrick.<br>75<\/p>\n\n\n\n<p>What is the OSHA regulation dealing with steel erection?<br>1926.753<\/p>\n\n\n\n<p>According to OSHA 1926.753, components of the multiple lift rigging assembly shall be specifically designed and assembled with a maximum capacity for total assembly and for each individual attachment point.<br>This capacity, certified by the manufacturers or a qualified rigger, shall be based on the manufacturers specifications with a_____ to 1 safety factor for all components.<br>5<\/p>\n\n\n\n<p>What is the proper procedure when using an insulating link or a boot near powerlines?<br>Be sure to maintain the correct allowable distance from the lines<\/p>\n\n\n\n<p>According to ASME B30.3 ,A periodic Inspection shall be performed by a:<br>Appointed person<\/p>\n\n\n\n<p>Central ballast blocks must be distributed around the tower base:<br>Equally<\/p>\n\n\n\n<p>According to the tower crane reference manual how often should the hoist wire rope be lubricated?<br>200 hours of operation<\/p>\n\n\n\n<p>According to the tower crane reference manual, using twist free wire rope the twist compensator should generally be:<br>Open<\/p>\n\n\n\n<p>Tower crane load hooks must be inspected each time a crane is erected or once every<br>Year<\/p>\n\n\n\n<p>When installing a wedge socket with wire rope how long should the tail length of the dead end be using standard 6 to 8 strand rope?<br>6<\/p>\n\n\n\n<p>What is the task of high tensile bolt connections between tower sections?<br>Connecting components and transmitting forces<\/p>\n\n\n\n<p>The maximum included angle allowed when attaching slings a shackle then to the hook is_________degrees.<br>120<\/p>\n\n\n\n<p>According to ASME B30.3, a class <strong><em>__<\/em><\/strong> fire is sting wisher shall be kept in the cab or on the machinery platform.<br>10BC<\/p>\n\n\n\n<p>sources;<br><a href=\"https:\/\/www.gcu.edu\/\nhttps:\/\/yaveni.com\/\nhttps:\/\/www.rasmussen.edu\/\nhttps:\/\/www.chamberlain.edu\/\nhttps:\/\/smartu.smartsheet.com\/page\/smartsheet-certified\" target=\"_blank\" rel=\"noopener\">https:\/\/www.gcu.edu\/<br>https:\/\/yaveni.com\/<br>https:\/\/www.rasmussen.edu\/<br>https:\/\/www.chamberlain.edu\/<br>https:\/\/smartu.smartsheet.com\/page\/smartsheet-certified<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NCCCO Tower Crane Test (New 2023\/ 2024 Update) Questions and Verified Answers| Graded A| 100% Correct NCCCO Tower Crane Test (New 2023\/ 2024Update) Questions and Verified Answers|Graded A| 100% CorrectQUESTIONAccording to AMSE B30.3 an overhead powerline is ALWAYS considered to be:Answer:Energized until the power company has verified it is not energizedQUESTIONHigh tensile bolts shall be [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[25],"tags":[],"class_list":["post-130644","post","type-post","status-publish","format-standard","hentry","category-exams-certification"],"_links":{"self":[{"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/posts\/130644","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/comments?post=130644"}],"version-history":[{"count":0,"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/posts\/130644\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/media?parent=130644"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/categories?post=130644"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/tags?post=130644"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}