{"id":130650,"date":"2023-12-19T21:06:37","date_gmt":"2023-12-19T21:06:37","guid":{"rendered":"https:\/\/learnexams.com\/blog\/?p=130650"},"modified":"2023-12-19T21:06:40","modified_gmt":"2023-12-19T21:06:40","slug":"mobile-crane-test-new-2023-2024-update-questions-and-verified-answers-100-correct-graded-a","status":"publish","type":"post","link":"https:\/\/www.learnexams.com\/blog\/2023\/12\/19\/mobile-crane-test-new-2023-2024-update-questions-and-verified-answers-100-correct-graded-a\/","title":{"rendered":"Mobile Crane Test (New 2023\/ 2024 Update) Questions and Verified Answers| 100% Correct| Graded A"},"content":{"rendered":"\n<p>Mobile Crane Test (New 2023\/ 2024 Update) Questions and Verified Answers| 100% Correct| Graded A<\/p>\n\n\n\n<p>Mobile Crane Test (New 2023\/ 2024 Update)<br>Questions and Verified Answers| 100%<br>Correct| Graded A<br>QUESTION<br>On a mobile cranes range diagram, boom length and boom angle can be used to determine?<br>a. load weight<br>b. load radius<br>c. counterweights<br>d. gross capacity<br>Answer:<br>load radius<br>QUESTION<br>On a mobile crane, what is the weight of the stowed jib that is deducted in load chart<br>calculations called?<br>a. actual weight<br>b. non-deducted weight<br>c. effective weight<br>d. non-effective weight<br>Answer:<br>Effective weight (because it is behind out riggers and becomes counter weight)<br>QUESTION<br>When determining boom tip elevation for a mobile crane, the user could:<br>a. call the manufacturer<br>b. use the range diagram<br>c. use the wiring diagram<br>d. call the site supervisor<\/p>\n\n\n\n<p>Answer:<br>use the range diagram<br>QUESTION<br>The term net capacity is best defined by which of the terms listed below?<br>a. net load plus capacity<br>b. capacity deductions minus gross capacity<br>c. net load minus gross capacity<br>d. gross capacity minus capacity deductions<br>Answer:<br>gross capacity minus capacity deductions<br>QUESTION<br>When lifting off the main boom, how is the effective weight of the fly\/jib different in the erected<br>position from that of the stowed position?<br>a. effective weight increases<br>b. effective weight decreases<br>c. effective weight is reduced 85%<br>d. effective weight is reduced 75%<br>Answer:<br>effective weight increases<br>QUESTION<br>mobile cranes that are setup on barges, shall have a list chart provided by which of the entities<br>listed below?<br>a. crane owner<br>b. superintendent<br>c. manufacturer<br>d. employer<br>Answer:<\/p>\n\n\n\n<p>manufacturer<br>QUESTION<br>when lifting loads on tires, mobile cranes are rated at what percentage of tipping?<br>a. 70%<br>b. 75%<br>c. 80%<br>d. 85%<br>Answer:<br>75%<br>QUESTION<br>How does the effective weight of a stowed extension relate to the actual weight of the<br>extension?<br>A. lower than the actual weight<br>b. depends on the boom angle<br>c. higher than the actual weight<br>d. same as the actual weight<br>Answer:<br>lower than the actual weight<br>(stowed is lower because it is uses as counter weight behind outriggers)<br>QUESTION<br>When load radius is between radii values, the operator must use the:<br>a. shorter radius<br>b. longer radius<br>c. shorter angle<br>d. longer angle<br>Answer:<br>Longer radius<\/p>\n\n\n\n<p>( when it is between values always take lesser of them longer radius means lower value!)<br>QUESTION<br>Why do must crane manufacturers reduce load capacity for duty-cycle operations?<br>a. the maximum load is almost always known<br>b. dynamic loads are not encountered<br>c. side loading forces may occur<br>d. front loading forces may occur<br>Answer:<br>side loading forces may occur<br>(because of torque you&#8217;re putting on it working faster)<br>QUESTION<br>why should only approved attachments or extra counterweights provided by the manufacturer be<br>placed on the rear of crane?<br>a. they could cause a backward stability problem<br>b. the crane will develop a swing problem<br>c. the swing clearance will increase<br>d. the ground pressure will increase<br>Answer:<br>they could cause a backward stability problem<br>(only use things that are accepted by manufacturer)<br>QUESTION<br>A mobile cranes jib is offset 15 degrees versus its original 0 degrees offset, but the boom angle<br>remains unchanged. In this situation, the load radius:<br>a. increases<br>b. remains the same<br>c. decreases<br>d. cannot be determined<br>Powered by <a href=\"https:\/\/learnexams.com\/search\/study?query=\" target=\"_blank\" rel=\"noopener\">https:\/\/learnexams.com\/search\/study?query=<\/a><\/p>\n\n\n\n<p>What is the purpose of placing mats or cribbing under outrigger floats?<br>Distribute the force over a larger area<\/p>\n\n\n\n<p>Where is the best location for leveling a crane?<br>Upperworks<\/p>\n\n\n\n<p>Before leveling a mobile crane on outriggers, an operator should ensure:<br>There is no weight of the crane bearing on any tires.<\/p>\n\n\n\n<p>Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered<br>Keeping a 90\u00ba angle between cylinder rod and pad.<\/p>\n\n\n\n<p>When may blocking (cribbing) be placed under outrigger beams on mobile cranes?<br>Never approved<\/p>\n\n\n\n<p>Mobile cranes should be level to within what percent of grade?<br>1%<\/p>\n\n\n\n<p>Timber crane mats work best when they are:<br>bolted together.<\/p>\n\n\n\n<p>When arriving in the crane at the job site, the operator should first determine the condition of the:<br>access roads.<\/p>\n\n\n\n<p>What surface listed below would NOT be a good location for assembly or setup of a mobile crane?<br>Above underground vaults<\/p>\n\n\n\n<p>Each outrigger pad and its blocking should be sufficient to support?<br>The total weight of the crane and its load.<\/p>\n\n\n\n<p>How does high wind affect a mobile crane with a long boom?<br>Introduces side load onto the boom.<\/p>\n\n\n\n<p>When is the only time the outrigger beams should be less than fully extended?<br>The load chart indicates that this is allowed.<\/p>\n\n\n\n<p>What is the primary purpose for a rooster sheave or auxiliary boom point sheave?<br>Separate the load hoist lines.<\/p>\n\n\n\n<p>Eccentric main boom tip reeving causes which of the following:<br>twisting of the main boom.<\/p>\n\n\n\n<p>Which type of wire rope listed below is installed on most cranes?<br>Right regular lay.<\/p>\n\n\n\n<p>The hoist drum flange shall extend a minimum of <em>__<\/em> over the top layer of wire rope at all times while crane is in operation.<br>1\u20442 inch<\/p>\n\n\n\n<p>Which of the following is classified as a standing wire rope?<br>Pendant line.<\/p>\n\n\n\n<p>When lifting on outriggers, the floats or pads should always be:<br>secured to the outriggers cylinder<\/p>\n\n\n\n<p>How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, before it should be removed from service?<br>6<\/p>\n\n\n\n<p>What is the minimum design factor required for a right regular lay, boom or hoist wire rope?<br>3.5<\/p>\n\n\n\n<p>On a mobile crane, how many broken wires are permitted at the end connection of a pendant before it must be taken out of service?<br>1<\/p>\n\n\n\n<p>Type 1 rotation resistant hoist wire rope has a design factor of:<br>5 to 1<\/p>\n\n\n\n<p>It is important to know when lubricating crane hoist wire rope, that the lubricant must:<br>not hinder visual inspection.<\/p>\n\n\n\n<p>How often is the competent person required to inspect the running wire ropes on a mobile crane?<br>Each shift<\/p>\n\n\n\n<p>On mobile cranes, how many broken wires must be present in one strand of one lay for running wire rope to be removed from service?<br>3<\/p>\n\n\n\n<p>How many randomly distributed broken wires in rotation-resistant hoist wire rope are considered for replacement?<br>2 broken wires in 6 rope diameters.<\/p>\n\n\n\n<p>According to OSHA, what is the minimum number of full wraps of wire rope that must remain on hoist drums in all service conditions?<br>2<\/p>\n\n\n\n<p>On whose recommendations should a mobile crane preventative maintenance program be developed?<br>Crane manufacturer.<\/p>\n\n\n\n<p>On a mobile crane, the measurement for the load radius is the distance from the center of gravity of the suspended load to the:<br>center of rotation of the crane.<\/p>\n\n\n\n<p>On a mobile crane, should the load be applied when determining the proper boom angle?<br>yes<\/p>\n\n\n\n<p>On a mobile cranes range diagram, boom length and boom angle can be used to determine?<br>Load radius<\/p>\n\n\n\n<p>On a mobile crane, what is the weight of the stowed jib that is deducted in load chart calculations called?<br>Effective weight<\/p>\n\n\n\n<p>When determining boom tip elevation for a mobile crane, the user could:<br>use the range diagram<\/p>\n\n\n\n<p>The term net capacity is best defined by which of the terms listed below?<br>Gross capacity minus capacity deductions.<\/p>\n\n\n\n<p>When lifting off the main boom, how is the effective weight of the fly\/jib different in the erected position from that of the stowed position?<br>Effective weight increases.<\/p>\n\n\n\n<p>Mobile cranes that are setup on barges, shall have a list chart provided by which of the entities listed below?<br>Manufacturer<\/p>\n\n\n\n<p>When lifting loads on tires, mobile cranes are rated at what percentage of tipping?<br>75%<\/p>\n\n\n\n<p>How does the effective weight of a stowed extension relate to the actual weight of the extension?<br>Lower than the actual weight.<\/p>\n\n\n\n<p>When load radius is between radii values, the operator must use the:<br>longer radius<\/p>\n\n\n\n<p>Why do most crane manufacturers reduce load capacity for duty-cycle operations?<br>Side loading forces may occur<\/p>\n\n\n\n<p>Why should only approved attachments or extra counterweights provided by the manufacturer be placed on the rear of crane?<br>They could cause a backward stability problem.<\/p>\n\n\n\n<p>A mobile crane&#8217;s jib is offset 150 versus its original 00 offset, but the boom angle remains unchanged. In this situation, the load radius:<br>increases<\/p>\n\n\n\n<p>What is the difference between an anti-two-block warning device and an anti-two-block prevention device?<br>Warning device only warns, but prevention devices will stop the functions.<\/p>\n\n\n\n<p>How can the LMI&#8217;s boom length or load radius reading be verified?<br>Actual measurements.<\/p>\n\n\n\n<p>On mobile cranes, what does the boom angle indicator show the operator?<br>Angle of boom to horizontal<\/p>\n\n\n\n<p>What is the device called that automatically stops the boom when it nears the cranes maximum angle?<br>Boom hoist limiting<\/p>\n\n\n\n<p>When the number of layers of wire rope on a drum increases the:<br>allowable line pull decreases.<\/p>\n\n\n\n<p>On a mobile crane, side loading of the boom could be caused by which of the following?<br>Starting or stopping the swing to rapidly<\/p>\n\n\n\n<p>Which person listed below, has the responsibility for determining the correct weight of a load?<br>Lift Director<\/p>\n\n\n\n<p>What must an operator do when an operator leaves the controls of the crane for an extended period of time?<br>Apply all brakes and dogs ,and lower the load to the ground<\/p>\n\n\n\n<p>Abruptly stopping a rapid swing on a long-boom mobile crane will produce what major effect?<br>Collapsing the boom.<\/p>\n\n\n\n<p>When should a tag line be used, during the hoisting of material?<br>When the rotation of the load would be dangerous.<\/p>\n\n\n\n<p>What percentage of the rated capacity of a mobile crane must be used when lifting with two cranes attached to the same load?<br>75%<\/p>\n\n\n\n<p>When lifting a load with two mobile cranes, it is very important to:<br>keep the hoist lines of both cranes vertical.<\/p>\n\n\n\n<p>If lifting a load with two mobile cranes of different rated capacities, the crane with the larger rated capacity should:<br>be hooked at a distance closer to the loads center of gravity.<\/p>\n\n\n\n<p>When determining the position to a mobile crane should be left in over night, with high winds in the forecast the operator should:<br>follow manufacturers recommendations<\/p>\n\n\n\n<p>When performing a multiple crane lift it is important for the operator&#8217;s of each crane to understand that:<br>the weight may increase if the other crane lands the load.<\/p>\n\n\n\n<p>When lifting loads that are submerged under water with a mobile crane, what is one of the conditions that the operator should be familiar with?<br>Load will increase when lifting the load out of the water.<\/p>\n\n\n\n<p>When lifting over water with a personnel platform, what are the occupants of the platform required to wear?<br>A flotation device.<\/p>\n\n\n\n<p>If a mobile crane is NOT set-up level and the operator swings the load from the high side to the low side, what effect will that have on the radius?<br>The radius increase.<\/p>\n\n\n\n<p>Increasing the distance from the crane&#8217;s center of gravity to the tipping axis will have what effect on a mobile crane?<br>Increase stability<\/p>\n\n\n\n<p>Backward stability of a mobile crane is tested in which configuration listed below?<br>Basic boom at maximum angle with no load.<\/p>\n\n\n\n<p>What is the minimum pitch diameter used for sheaves in a boom hoist reeving system using rotation resistant wire rope?<br>Not less than 18 times rope diameter.<\/p>\n\n\n\n<p>When can capacity altering modifications be made to mobile cranes?<br>When permission is given by the crane manufacturer.<\/p>\n\n\n\n<p>A crane is at the point of instability when the crane&#8217;s leverage on the load equals:<br>100% of the load&#8217;s leverage on crane.<\/p>\n\n\n\n<p>Who must determine maximum speed for a mobile crane to travel with a suspended load?<br>The competent person<\/p>\n\n\n\n<p>Deflection of the boom while operating a mobile crane will increase?<br>Load radius.<\/p>\n\n\n\n<p>A sudden start or stop of the hoisting function while operating a mobile crane can produce a:<br>dynamic load<\/p>\n\n\n\n<p>When traveling with a suspended load on a mobile crane climbing an incline, the load should be carried in which direction?<br>Uphill.<\/p>\n\n\n\n<p>Which mobile crane boom configuration can cause the most hazardous side-loading condition for the crane?<br>Long boom with minimum radius.<\/p>\n\n\n\n<p>When preparing to hoist a load, the load block hook should be positioned:<br>directly above the load&#8217;s center of gravity.<\/p>\n\n\n\n<p>When making a lift on outriggers, the maximum ground-bearing pressure occurs in which boom position?<br>Over the corner.<\/p>\n\n\n\n<p>When personal platforms are hoisted with a mobile crane what item listed below must be provided?<br>An anti two-block device.<\/p>\n\n\n\n<p>Personnel platforms suspended on the hook of a mobile crane, must not exceed what percentage of a crane&#8217;s capacity at any given radius?<br>50%.<\/p>\n\n\n\n<p>When proof testing a personnel platform to 125% of its rated capacity, how long must the platform be suspended?<br>5 minutes.<\/p>\n\n\n\n<p>Which of the following correctly states the requirements for hooks used to hoist employees on a crane-supported personnel platform?<br>Hooks shall have a latch that closes and locks.<\/p>\n\n\n\n<p>OSHA permits hoisting of personnel by a crane as long as the employer can show:<br>there is no less hazardous or practicable way<\/p>\n\n\n\n<p>Before lifting an occupied personnel platform on a jobsite the crew must ensure they perform which of the following<br>a) Must attend a pre-lift meeting.<br>b) Must fully deploy all outriggers.<br>c) Must perform a trial lift.<br>d) ALL OF THE ABOVE is the answer<\/p>\n\n\n\n<p>Before lifting an occupied personnel platform on a jobsite, which of the following applies?<br>a) Must use 50% of cranes rated capacity.<br>b) Must trial lift anticipated load weight.<br>c) Must ensure rigging is dedicated to platform only.<br>d) ALL OF THE ABOVE Pg 74,77<\/p>\n\n\n\n<p>Which of the following standards or regulations governs the lifting of personnel in construction?<br>OSHA 1926. 1431.<\/p>\n\n\n\n<p>According to OSHA 1926.1431, which device listed below must be attached to the crane?<br>Anti-two-block.<\/p>\n\n\n\n<p>According to OSHA 1926.1431, which of these hoist options is prohibited?<br>Hoist free fall<\/p>\n\n\n\n<p>Inside the personnel platform except for gates, how much of the perimeter must contain a grab rail for the occupants?<br>100 percent.<\/p>\n\n\n\n<p>According to OSHA 1926. 1431, during personnel platform hoisting operations, access gates shall NOT swing in which direction?<br>Outward<\/p>\n\n\n\n<p>OSHA 1926. 1431 states that tag lines must be used:<br>when necessary to control platform.<\/p>\n\n\n\n<p>According to OSHA 1926.1431, while hoisting a personnel platform, what weather condition listed below will promptly discontinue the operation?<br>Dangerous<\/p>\n\n\n\n<p>While hoisting employees in a personnel platform, direct communication must be maintained between the signal person and who?<br>Operator.<\/p>\n\n\n\n<p>According to OSHA 1926.1431, at what wind speed must a qualified person be consulted?<br>20mph<\/p>\n\n\n\n<p>If working near power lines and using a tag line, which type of rope is least conductive to electricity?<br>Polypropylene.<\/p>\n\n\n\n<p>When working near power lines with a mobile crane, where does OSHA require caution stickers be installed on all equipment?<br>At operators station and 2 on the outside of the equipment<\/p>\n\n\n\n<p>According to OSHA table T, what is the minimum clearance for 133kV power lines?<br>10 feet.<\/p>\n\n\n\n<p>According to OSHA, when working near power lines when is a dedicated spotter required?<br>When crane operator is unable to see the warning line of signs.<\/p>\n\n\n\n<p>According to OSHA&#8217;s table T, what clearance should a mobile crane IN TRANSIT keep while going under 445kV lines?<br>16 feet.<\/p>\n\n\n\n<p>According to OSHA when is it safe to hoist loads with a mobile crane below energized power lines?<br>When the fully extended boom can&#8217;t reach the prohibited zone.<\/p>\n\n\n\n<p>According to OSHA 1926. 1408, when operating near high voltage power lines, what clearance shall be required when the rating of the lines is 275kV?<br>20 feet w\/encroachment precautions.<\/p>\n\n\n\n<p>According to OSHA 1926. 1411, when you encounter power lines with a voltage of 44 kV and the crane is TRAVELING, according to Table T, what is the minimum required clearance?<br>6.<\/p>\n\n\n\n<p>According to OSHA 1926. 1408, the minimum clearance between any part of the crane and power lines rated 50 kV or below shall be:<br>10 feet w\/encroachment precautions.<\/p>\n\n\n\n<p>According to OSHA 1926. 1408, for power lines rated 100 kV, the minimum clearance between the crane and any lines shall be?<br>15 feet w\/encroachment precautions.<\/p>\n\n\n\n<p>The term &#8220;jib offset&#8221; can be expressed as the jib angle to which mobile crane component listed below?<br>Boom.<\/p>\n\n\n\n<p>On a mobile crane the term &#8220;part&#8217;s of line&#8221; refers to which item listed below?<br>The number of lines running thru the load block and boom point<br>sheaves.<\/p>\n\n\n\n<p>According to OSHA, mobile crane load block hooks must not have a twist in excess of:<br>0 degrees.<\/p>\n\n\n\n<p>According to OSHA, mobile crane load block hooks must not have a throat opening in excess of:<br>5% of its original size.<\/p>\n\n\n\n<p>What is the design factor for grade 80 chain slings?<br>4.<\/p>\n\n\n\n<p>What grade alloy steel chain should be used for hoisting slings?<br>80.<\/p>\n\n\n\n<p>Loads rigged using a basket hitch should be <strong>__<\/strong> to prevent slippage.<br>Balanced.<\/p>\n\n\n\n<p>When slings encounter sharp edges on loads to be lifted, riggers shall ensure that slings are:<br>protected or padded.<\/p>\n\n\n\n<p>According to OSHA, quadruple sling bridle ratings are the same as:<br>triple sling bridle ratings.<\/p>\n\n\n\n<p>When correctly installing U-bolt type wire rope clips, the U portion of the clip shall be on:<br>the dead or short end.<\/p>\n\n\n\n<p>Which statement listed below is correct about basic load rigging?<br>As horizontal load angle decreases, stress increases<\/p>\n\n\n\n<p>The approximate percentage of strength of choker, vertical, and basket hitches respectively are:<br>75%, 100%, 200%.<\/p>\n\n\n\n<p>According to ASME which of the following listed below shall NOT be used for the suspension system on suspended personnel platforms?<br>Synthetic web bridle.<\/p>\n\n\n\n<p>When rigging a bundle of pipe or tubing, which of the following would provide the best contact between sling and load?<br>Double wrap choker.<\/p>\n\n\n\n<p>What is the angle between the top of the load and the sling leg referred to in sling load charts?<br>Horizontal sling angle.<\/p>\n\n\n\n<p>When installing a wedge socket, it must be attached with the load line pulling in a straight line from the:<br>pin.<\/p>\n\n\n\n<p>For any signal other than emergency stop, who is permitted to give hand signals to the crane operator during a lift?<br>A qualified signal person.<\/p>\n\n\n\n<p>Select the correct OSHA Standard Method Hand Signal that matches the illustration.<br>Move slowly.<\/p>\n\n\n\n<p>Select the correct OSHA Standard Method Hand Signal that matches the illustration.<br>Use whipline.<\/p>\n\n\n\n<p>What is the first element of voice signals given to a crane operator prior to the lift?<br>Function and Direction.<\/p>\n\n\n\n<p>According to OSHA, each series of voice signals contain how many elements?<br>Three.<\/p>\n\n\n\n<p>Select the correct OSHA Standard Method Hand Signal that matches the illustration.<br>Lower.<\/p>\n\n\n\n<p>Select the correct OSHA Standard Method Hand Signal that matches the illustration.<br>Swing.<\/p>\n\n\n\n<p>Select the correct OSHA Standard Method Hand Signal that matches the illustration.<br>Lower boom and raise load.<\/p>\n\n\n\n<p>Select the correct OSHA Standard Method Hand Signal that matches the illustration.<br>Emergency stop. (both arms extended in the middle)<\/p>\n\n\n\n<p>Select the correct OSHA Standard Method Hand Signal that matches the illustration.<br>Lower boom. (thumb down)<\/p>\n\n\n\n<p>Select the correct OSHA Standard Method Hand Signal that matches the illustration.<br>Dog Everything. (both hands on stomach)<\/p>\n\n\n\n<p>Select the correct OSHA Standard Method Hand Signal that matches the illustration.<br>Raise boom, lower load.<\/p>\n\n\n\n<p>Select the correct OSHA Standard Method Hand Signal that matches the illustration.<br>Stop.<\/p>\n\n\n\n<p>When directing a crane using voice signals the transmission must be through a channel that is:<br>dedicated.<\/p>\n\n\n\n<p>Before commencing lifting operations, the operator and signal person must contact and identify each other when using which form of communication?<br>Voice signals.<\/p>\n\n\n\n<p>According to OSHA where must a signal chart be posted?<br>On the equipment or in the area of the hoisting operation.<\/p>\n\n\n\n<p>How many audible travel signals are there?<br>3.<\/p>\n\n\n\n<p>Select the correct OSHA Standard Method Hand Signal that matches the illustration.<br>Use main hoist<\/p>\n\n\n\n<p>Select the correct OSHA Standard Method Hand Signal that matches the illustration.<br>Hoist.<\/p>\n\n\n\n<p>Select the correct OSHA Standard Method Hand Signal that matches the illustration.<br>Raise boom.<\/p>\n\n\n\n<p>Select the correct ASME Standard Hand Signal that matches the illustration.<br>Extend boom.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mobile Crane Test (New 2023\/ 2024 Update) Questions and Verified Answers| 100% Correct| Graded A Mobile Crane Test (New 2023\/ 2024 Update)Questions and Verified Answers| 100%Correct| Graded AQUESTIONOn a mobile cranes range diagram, boom length and boom angle can be used to determine?a. load weightb. load radiusc. counterweightsd. gross capacityAnswer:load radiusQUESTIONOn a mobile crane, what [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[25],"tags":[],"class_list":["post-130650","post","type-post","status-publish","format-standard","hentry","category-exams-certification"],"_links":{"self":[{"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/posts\/130650","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/comments?post=130650"}],"version-history":[{"count":0,"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/posts\/130650\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/media?parent=130650"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/categories?post=130650"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/tags?post=130650"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}