{"id":213289,"date":"2025-05-10T07:58:49","date_gmt":"2025-05-10T07:58:49","guid":{"rendered":"https:\/\/learnexams.com\/blog\/?p=213289"},"modified":"2025-05-10T07:58:52","modified_gmt":"2025-05-10T07:58:52","slug":"a-construction-company-is-planning-their-projects-for-the-year-2021","status":"publish","type":"post","link":"https:\/\/www.learnexams.com\/blog\/2025\/05\/10\/a-construction-company-is-planning-their-projects-for-the-year-2021\/","title":{"rendered":"A construction company is planning their projects for the year 2021."},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Problem<br>A construction company is planning their projects for the year 2021. The company is considering the construction of a certain number of 1,000 m&#8217; buildings. 1312018, the company has built 5 similar buildings but with smaller areas, and the material costs associated with those 5 buildings are as shown in the following table:<br>Buddmg e Cast (3D) 1 700 83,200 2 747 87,800 3 780 90,400 4 810 93,100 5 845 95,500<br>The material cost index values are displayed in the following table: Year Cost 2017 345 2018 355 2019 357 2020 360 2021 362<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-ast-global-color-0-color\">The Correct Answer and Explanation is:<\/mark><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To determine the <strong>estimated material cost<\/strong> of a <strong>1,000 m\u00b2 building in 2021<\/strong>, we must analyze the cost trends of the smaller buildings, normalize them using the cost index, and then project that trend forward using the cost index for 2021.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\">Step 1: Standardize historical costs using Cost Index<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">We are given:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Building<\/th><th>Area (m\u00b2)<\/th><th>Cost (USD)<\/th><th>Year<\/th><th>Index<\/th><\/tr><\/thead><tbody><tr><td>1<\/td><td>700<\/td><td>83,200<\/td><td>2018<\/td><td>355<\/td><\/tr><tr><td>2<\/td><td>747<\/td><td>87,800<\/td><td>2018<\/td><td>355<\/td><\/tr><tr><td>3<\/td><td>780<\/td><td>90,400<\/td><td>2018<\/td><td>355<\/td><\/tr><tr><td>4<\/td><td>810<\/td><td>93,100<\/td><td>2018<\/td><td>355<\/td><\/tr><tr><td>5<\/td><td>845<\/td><td>95,500<\/td><td>2018<\/td><td>355<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Since all buildings were built in <strong>2018<\/strong>, we will <strong>normalize the costs to a base year<\/strong> and then <strong>adjust them to 2021<\/strong> using the index.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Let\u2019s calculate the <strong>cost per square meter<\/strong> for each building in 2018:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>B1: 83,200 \/ 700 = <strong>118.86<\/strong><\/li>\n\n\n\n<li>B2: 87,800 \/ 747 \u2248 <strong>117.51<\/strong><\/li>\n\n\n\n<li>B3: 90,400 \/ 780 \u2248 <strong>115.90<\/strong><\/li>\n\n\n\n<li>B4: 93,100 \/ 810 \u2248 <strong>114.94<\/strong><\/li>\n\n\n\n<li>B5: 95,500 \/ 845 \u2248 <strong>113.02<\/strong><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The cost per m\u00b2 decreases as the building size increases \u2014 a common occurrence due to economies of scale.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Now we fit a <strong>linear trend<\/strong> to the cost\/m\u00b2 data.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Let\u2019s approximate the trend with linear regression. For simplicity, we can observe that:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>When area increases by 145 m\u00b2 (from 700 to 845), cost\/m\u00b2 drops from 118.86 to 113.02<\/li>\n\n\n\n<li>That\u2019s a drop of \u2248 5.84 across 145 m\u00b2 \u2192 slope \u2248 -0.0403<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">We use point-slope form to estimate cost\/m\u00b2 for a 1,000 m\u00b2 building:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Using Building 5: Cost\/m\u00b2 = 113.02 + (1000 &#8211; 845) \u00d7 (-0.0403)<\/li>\n\n\n\n<li>= 113.02 &#8211; 6.24 = <strong>106.78<\/strong> (in 2018)<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\">Step 2: Adjust cost to 2021 using the material cost index<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Use ratio of indices: 362 (2021) \/ 355 (2018) = <strong>1.0197<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">So, 2021 cost\/m\u00b2 = 106.78 \u00d7 1.0197 \u2248 <strong>108.89<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Total cost for a 1,000 m\u00b2 building = 108.89 \u00d7 1,000 = <strong>$108,890<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\">\u2705 Final Answer: <strong>$108,890<\/strong><\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\">Explanation (300+ words):<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The construction company wishes to estimate the material cost of constructing a 1,000 m\u00b2 building in 2021 based on data from 2018. The best approach involves adjusting historical cost data using <strong>material cost indices<\/strong> to account for inflation, and extrapolating trends to a larger building size.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">First, we calculate the <strong>unit cost (cost per m\u00b2)<\/strong> for each of the 5 smaller buildings built in 2018. This gives insight into how the cost behaves relative to the size of the building. As expected, we observe that the <strong>cost per m\u00b2 decreases<\/strong> as the size increases \u2014 a standard result of <strong>economies of scale<\/strong>, where larger projects benefit from bulk purchases and fixed cost dilution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We then estimate a <strong>linear trend<\/strong> to predict the cost per m\u00b2 for a building size of 1,000 m\u00b2. This method provides a simple yet effective forecast, considering only a modest extrapolation from 845 m\u00b2 (the largest building) to 1,000 m\u00b2. Using the slope derived from cost\/m\u00b2 versus area, we predict a base 2018 cost per m\u00b2 of about <strong>106.78 USD<\/strong> for the 1,000 m\u00b2 building.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Next, we apply <strong>index-based cost adjustment<\/strong> to translate this 2018 cost to 2021 values. Using the ratio of the material cost indices (362 in 2021 vs. 355 in 2018), we adjust the predicted cost by about 1.97%, yielding a final 2021 cost per m\u00b2 of <strong>approximately 108.89 USD<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Multiplying by the area (1,000 m\u00b2), we estimate the total material cost for the proposed building to be <strong>$108,890<\/strong>. This systematic method provides a reasonable and industry-standard approach for cost forecasting using historical data and material indices.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ProblemA construction company is planning their projects for the year 2021. The company is considering the construction of a certain number of 1,000 m&#8217; buildings. 1312018, the company has built 5 similar buildings but with smaller areas, and the material costs associated with those 5 buildings are as shown in the following table:Buddmg e Cast [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[25],"tags":[],"class_list":["post-213289","post","type-post","status-publish","format-standard","hentry","category-exams-certification"],"_links":{"self":[{"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/posts\/213289","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/comments?post=213289"}],"version-history":[{"count":0,"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/posts\/213289\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/media?parent=213289"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/categories?post=213289"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.learnexams.com\/blog\/wp-json\/wp\/v2\/tags?post=213289"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}