Study material
Quiz
Category
Tutor
Login
Register
Categories
wonderlic tests
EXAM REVIEW
NCCCO Examination
Summary
Class notes
QUESTIONS & ANSWERS
NCLEX EXAM
Exam (elaborations)
Study guide
Latest nclex materials
HESI EXAMS
EXAMS AND CERTIFICATIONS
HESI ENTRANCE EXAM
ATI EXAM
NR AND NUR Exams
Gizmos
PORTAGE LEARNING
Ihuman Case Study
LETRS
NURS EXAM
NSG Exam
Testbanks
Vsim
Latest WGU
AQA PAPERS AND MARK SCHEME
DMV
WGU EXAM
exam bundles
Study Material
Study Notes
Test Prep
Study material
Quiz
Category
Tutor
Documents
Memberships
Study materials
Categories
wonderlic tests
EXAM REVIEW
NCCCO Examination
Summary
Class notes
QUESTIONS & ANSWERS
NCLEX EXAM
Exam (elaborations)
Study guide
Latest nclex materials
HESI EXAMS
EXAMS AND CERTIFICATIONS
HESI ENTRANCE EXAM
ATI EXAM
NR AND NUR Exams
Gizmos
PORTAGE LEARNING
Ihuman Case Study
LETRS
NURS EXAM
NSG Exam
Testbanks
Vsim
Latest WGU
AQA PAPERS AND MARK SCHEME
DMV
WGU EXAM
exam bundles
Study Material
Study Notes
Test Prep
Certified Healthcare Constructor Exam Study Guide Questions
Helpsheet
×
Helpsheet
×
Report question problem
×
I think the answer is wrong
There are multiple correct answers
There is a typing error
Image or comprehension text is not display properly
Something else(please specify below)
Any more information
Question Number 166
What is required when using smoke barriers to divide areas of the hospital into smoke departments
has a fire rating for new one hour rated for existing half an hour rated walls are required to go to the deck above doors are not required to latch, but our self closing in 20 minute rated or equivalent penetrations are required to be stopped. Smoke dampers are required for ductwork penetrations with exceptions, not required if HVAC is fully ducted existing not required if HVAC is fully ducted and sprinkler
✔ Correct Answer:
has a fire rating for new one hour rated for existing half an hour rated walls are required to go to the deck above doors are not required to latch, but our self closing in 20 minute rated or equivalent penetrations are required to be stopped. Smoke dampers are required for ductwork penetrations with exceptions, not required if HVAC is fully ducted existing not required if HVAC is fully ducted and sprinkler