Asphalt Field Level I Test with
Hierarchy of construction documents (least to most) - âœâ€Ã¢Å“â€Standard drawings, Standard specs,
Supplemental specs, Plans, Special provisions, Special provisions copied notes
Which construction documents details approved additions and revisions to the standard spec -
âœâ€Ã¢Å“â€Supplemental specs
This ensures an adequate bond between the existing pavement surface and the new asphalt overlay so
that slippage and delamination do not occur - âœâ€Ã¢Å“â€Tack coat
Which tack coat can be used prior to May and after September? - âœâ€Ã¢Å“â€Conventional
Which tack coat can be used year round, and must be used from May through September? -
âœâ€Ã¢Å“â€Trackless
What is the range of proper tack coat application? (in gal/yd^2) - âœâ€Ã¢Å“â€.05 to .10
Proper tack coat will leave a residual asphalt cement content ranging from approximately...? (in
gal/yd^2) - âœâ€Ã¢Å“â€.04 to .06
Most asphalt emulsions contain __% to __% residual asphalt cement - âœâ€Ã¢Å“â€60, 65