• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

CCHT PRODUCT WATER EXAM QUESTIONS

Class notes

What's included in this material?

  • Up-to-date Content: This is the latest version of the study guides, questions, and answers.
  • Instant Access: Immediately available for download right after your purchase.
  • Multi-Device: High-quality PDF format, easily readable on your phone, tablet, or PC.
  • Verified Quality: Carefully curated content designed to help you prepare effectively.

Sample Content from this Document

PDF Download

CCHT PRODUCT WATER EXAM QUESTIONS

Qs and Ans - Expert- Explanation - ing score -24 Questions and Answers

-Format: Multiple-choice / Flashcard

Question 1: The TDS (Total Dissolve Solids) Setting on the RO should be set at ____ times the TDS reading

Answer:

2

Question 2: Hardness strips are used to test for ___ and ___

Answer:

Calcium and Magnesium

Question 3: When is the low level alarm set on the holding tank

Answer:

Always

Question 4: The HACH meter is

Answer:

Daily

Question 5: When the test is H. drops to ____ the RO membranes must be replaced

Answer:

80

Question 6: The TDS meter is standardized ______ with a full calibration done _____

Answer:

daily; weekly Question 7: Water exceeding the TDS alarm limits will cause the product diverter to send the water to the

Answer:

Drain Question 8: A delta pressure of ____ would indicate the pre filter needed to be changed

Answer:

10

Question 9: How many Backflow preventers should each facility have

Answer:

  • for pretreatment and 1 as a back-up

Question 10: The purpose of the Residual Chlorine strips is to test for ____

Answer:

Bleach

Question 11: RPC strips are used to test

Answer:

Total Chlorine Question 12: One particle the RO will not remove is ___ (Carbon Tanks perform this task)

Answer:

Chlorine Question 13: Invisible radiation used to alter the DNA of bacteria is provided by a

Answer:

UV LIGHT

Question 14: The Ultra filters are located

Answer:

after the holding tank

Question 15: Wave length of UV Light is

Answer:

254 Question 16: The vial for testing Total Chlorine is filled with ____ml of sample water

Answer:

10 ml

Question 17: The loop pumps should run

Answer:

24/7

Question 18: Idea pH of incoming water is

Answer:

7

Question 19: Product water is called

Answer:

Permeate Question 20: After adding the pillow packet to the test sample the sample is read at ___ to __ min

Answer:

  • to 6

Question 21: The RO should produce water that meets

Answer:

AAME Standards

Question 22: The loop piping is usually made of

Answer:

PVC

Question 23: Pre Filters for the Reverse Osmosis machine are sized at

Answer:

  • microns

Question 24: One method to test the performance of the RO is to calculate

Answer:

Percent Rejection

Download Study Material

Buy This Study Material

$35.00
Buy Now

Study Material Information

Category: Class notes
Description:

CCHT PRODUCT WATER EXAM QUESTIONS

UNLOCK ACCESS $35.00