• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

CON CONTRACTING CERTIFICATION 3990 EXAM QUESTIONS WITH ALL CORRECT AND VERIFIED ANSWERS LATEST UPDATE

EXAMS AND CERTIFICATIONS May 28, 2025
Preview Mode - Purchase to view full document
Loading...

Loading study material viewer...

Page 0 of 0

Document Text

What is the purpose of a contract file? (4)
Provide background/basis for decisions
Supporting actions taken
Provide information for reviews and investigations
Furnishing essential facts in the event of a litigation

A postaward orientation aids both Government and contractor personnel to?
Achieve a clear and mutual understanding of all contract requirements and identify and resolve potential problems


When late in paying an otherwise acceptable invoice, the Government will?
Pay an interest penalty


When acquiring commercial items, quality assurance is primarily the responsibility of?
The contractor


You have a requirement for an online subscription to Engineering News Record. The site owner requires payment before they will provide the license code number to activate the annual subscription. Which payment form is required?
An advance payment


What agency does DoD typically delegate contract administrative functions for supply contracts?
Defense Contract Management Agency


A purpose of a postaward orientation is to?
Achieve a clear and mutual understanding of all contract requirements


A contractor employee accidentally broke a test fixture that belongs to the Government and is accountable to a Government contract. Generally speaking?
Contractors are not held liable for loss of Government property


According to the FAR, the acquisition team?
Includes the contractor


With limited exceptions, a Contractor Performance Assessment Reporting System (CPARS) report is required?
When the contract dollar value exceeds the simplified acquisition threshold


To be determined responsible by a contracting officer, a prospective contractor must?
Have adequate financial resources to perform the contract, or the ability to obtain them


In ensuring overall quality of items and services received under a contract, which of the following is the responsibility of the Government?
Quality assurance surveillance


The Government's preferred remedy to nonconforming goods or services is?
Allow the contractor to repair or replace the nonconforming items, as long as there is still time left within the required delivery schedule


Quality assurance policies and procedures found in FAR part 46?
Apply to both the Government and contractor


Contractors are responsible for
Tendering to the Government for acceptance only those supplies or services that conform to contract quality requirements


Does the Government have the right to inspect a product before it is accepted?
Yes, always.


When does title for a completed product transfer to the Government, assuming the product meets all contract requirements?
Upon formal acceptance by the Government


In commercial contracting, what quality system is utilized?
The contractor's


Can contract files be combined if appropriate?
Yes


At what level are contract files maintained and why?
Maintained at the organizational level to ensure

Download Study Material

Buy This Study Material

$29.00
Buy Now
  • Immediate download after payment
  • Available in the pdf format
  • 100% satisfaction guarantee

Study Material Information

Category: EXAMS AND CERTIFICATIONS
Description:

CON CONTRACTING CERTIFICATION 3990 EXAM QUESTIONS WITH ALL CORRECT AND VERIFIED ANSWERS LATEST UPDATE

UNLOCK ACCESS $29.00