What are shop drawings, product data and samples considered, according to the AIA?
Not contract documents


According to the AIA, what is a construction change directive?
Written order, prepared by the architect and signed by the owner and architect


According to the AIA 201, Blank will not be included by the architect for the cost of a change directive?
Hand tool rental cost


According to the AIA documents, when can the contractor see payment for his retainage amount?
Upon issuance of the certificate of substantial completion


If a contractor is required to provide submittals in accordance with the contract documents, then the contractor shall not perform that portion of the work until Blank?
The submittal has been approved by the architect


Which of the following is not a cause for an architect to withhold a certificate of payment?
Damage done by the owner to the contractor


Partial occupancy does not constitute acceptance of noncompliant work in that portion occupied, unless otherwise agreed, true or false?
True


After the approval of the contractor certification for payment by the architect, what shall be done?
The owner should make the payment

Download Study Material

Buy This Material

$35.00 One-time purchase
Buy Now
  • Full access to this material
  • Download anytime
  • No expiration

Study Material Information

Category: EXAMS AND CERTIFICATIONS
Description:

FLORIDA CONTRACTOR ‚ „ S EXAM QUESTIONS WITH CORRECT AND UPDATE

Get this material $35.00