• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

FREE AND STUDY GAMES ABOUT 4790.2A NAMP EXAM

Class notes Jan 11, 2026
Preview Mode - Purchase to view full document
Loading...

Loading study material viewer...

Page 0 of 0

Document Text

PDF Download

FREE AND STUDY GAMES ABOUT 4790.2A NAMP EXAM

QUESTIONS

Actual Qs and Ans Expert-Verified Explanation

This Exam contains:

-Guarantee passing score -49 Questions and Answers -format set of multiple-choice -Expert-Verified Explanation

Question 1: MDU

Answer:

Material Delivery Unit

Question 2: NAMP Reference?

Answer:

COMNAVAIRFORINST 4790.2A

Question 3: Workload priorities - Priority 2

Answer:

Repair of critical LRCAs and SE. This priority is also assigned to O-level maintenance activity's work stoppage requirements.

Question 4: UAV

Answer:

Unmanned Aerial Vehicle

Question 5: I Level

Answer:

AIMD/FRC

Question 6: D Level

Answer:

Depot

Question 7: What does SRC stand for?

Answer:

Scheduled Removal Components

Question 8: Workload priorities - Priority 1

Answer:

Support of NMC or PMC aircraft. NMCS and PMCS items, based on a valid outstanding requisition held by supply (EXREP), or work requests causing NMC or PMC conditions on aircraft, will be assigned Priority 1.

Question 9: The Equipment Master Roster (E-00) will be kept up-to-date by who?

Answer:

Maintenance Control to reflect current aircraft inventory and status on a day-to-day basis during the reporting period.

Question 10: RCU

Answer:

Requisition Control Unit

Question 11: Validation of AWP items, is performed every?

Answer:

AWP list provided by the aviation support division, shall be performed jointly with the AWP unit at least weekly.

Question 12: Workload priorities - Priority 3

Answer:

Repair of noncritical LRCAs and SE, and repair or manufacture of material for nonfixed allowance stock.

Question 13: Two Maintenance Types

Answer:

Reworked or Upkeep

Question 14: What does NAMP stand for?

Answer:

NAVAL AVIATION MAINTENANCE PROGRAM

Question 15: what needs to be done prior to delivery of the aircraft to the rework activity.

Answer:

Remove all loose gear not required during therework process and, if applicable, annotate the inventory log accordingly.

Question 16: What does MMP stand for?

Answer:

Monthly Maintenance Plan

Question 17: Define Hot Seating.

Answer:

An operational evolution where the pilot/crew of an aircraft is changed while the engine(s) is (are) operating and the aircraft is to be immediately relaunched.

Question 18: Project Codes - ZC8

Answer:

Assigned by the IMA when requisitioning material to stop an AWP condition on components and aircraft engines undergoing repair when directly related to aircraft support.

Question 19: AWP

Answer:

Awaiting Parts Unit

Question 20: What are you validating on your AWP list?

Answer:

AWP validation ensures all parts on order are still required and all required parts are still on order.Possible cannibalization actions are also explored to reduce the number of AWP components.

Question 21: How often are work center audited by QA?

Answer:

Semi annual

Question 22: NDI

Answer:

Nondestructive Inspection:

Question 23: OPNAV 4790/64

Answer:

Support Equipment Transaction Report

Question 24: Project Codes - ZF7

Answer:

"Broad Arrow" (SE inoperative) assigned by IMA to material requirements for nonoperational SE used in direct support of operational aircraft for which there is no redundancy.

Question 25: C2 capability

Answer:

Impact on repair capability.Repair turnaround time is able to meet customer demand rate. AWM backlog is low or none.Workaround may exist, but is unreliable.Question 26: How many hours of processing time for issue priority group 2 and priority designator 4-8

Answer:

  • hour

Question 27: What does AWP stand for?

Answer:

Awaiting parts Question 28: How many hours of processing time for issue priority group 1 and priority designator 1-3

Answer:

  • hour

Download Study Material

Buy This Study Material

$11.99
Buy Now
  • Immediate download after payment
  • Available in the pdf format
  • 100% satisfaction guarantee

Study Material Information

Category: Class notes
Description:

PDF Download FREE AND STUDY GAMES ABOUT 4790.2A NAMP EXAM QUESTIONS Actual Qs and Ans Expert-Verified Explanation This Exam contains: -Guarantee passing score -49 Questions and Answers -format set ...

UNLOCK ACCESS $11.99