PDF Download
FREE AND STUDY GAMES ABOUT DCAPES 1 EXAM
QUESTIONS
Actual Qs and Ans Expert-Verified Explanation
This Exam contains:
-Guarantee passing score -37 Questions and Answers -format set of multiple-choice -Expert-Verified Explanation
Question 1: DCAPES Users
Answer:
Functional Managers User account Managers Standard Users
Question 2: COURSE OF ACTION (COA)
Answer:
A sequence activities that an individual or unit may follow. A COA is a product of JOPES concept development phase.
Question 3: Unit Line number (ULN)
Answer:
Unique identification number that uniquely describes a unit entry line in JOPES.
Question 4: Component Commands
Answer:
Responsible to identify theater pre-positioned war reserve material to supporting MAJCOMS
Question 5: Shortfall
Answer:
The lack of forces, equipment, personnel, material, or capability, reflected as difference between the resources.
Question 6: D-Day
Answer:
The unnamed day on which a operation Commence.
Question 7: LIMFAC
Answer:
A factor or condition that either temporarily or permanently impedes mission accomplishments
Question 8: LOGMOD
Answer:
Automates the development of and distribution of UTC Packages. Stand along system.
Question 9: Central Site
Answer:
The main PERSCO location within an AOR.
Question 10: Time phased force and deployment Data(TPFDD)
Answer:
The JOPES database portion of an OPLAN.
Question 11: Operation Order
Answer:
A directive issued by a commander to subordinate commanders the purpose of effecting the coordinated execution of an operation.
Question 12: Global Command and Control System (GCCS)
Answer:
A DOD System providing the planning community the ability to share the workload among computer center and rapidly query programs.
Question 13: C-Day
Answer:
The unnamed day on which a deployment operation commences or is to commence.
Question 14: Installation Personnel Readiness (IPR)
Answer:
FSS office that functions as base level office of primary responsibility for all personnel Deployment/contingency exercise or rotational matters.
Question 15: Manpower office (MO)
Answer:
Is responsible for validating all tasking
Question 16: Unit Deployment Manager (UDM)
Answer:
Unit representative who is responsible for the unit deployment program.
Question 17: ART
Answer:
Chief staff of the AF directed system at the AEFC that was develop to measure AEF readiness. AF Only uses this system.
Question 18: Directorate of Operation and training
Answer:
Responsible for overall Readiness and training, contributing to a force that is trained and ready to deploy
Question 19: Supporting Command
Answer:
Responsible for establishing accountability by tracking and managing mini-records.
Question 20: Operation Plan (OPLAN)
Answer:
A plan for conduct of military operations. Identifies the forces and supplies required to execute the Command in Chief strategic concept and movement schedule of these resources to the theater of Operations.
Question 21: What are the two subsystem of MEFPAK?
Answer:
MANFOR & LOGFOR
Question 22: MEFPAK
Answer:
A Data system designed to support contingency and general war planning.
Question 23: SORTS
Answer:
A Reporting system used to measure the readiness of a combat or combat support unit.
Question 24: MAJCOM
Answer:
Verifies tasking utilizing AFVC which sets code to
- Wing level Visibility.
Question 25: Unit identification Code (UIC)
Answer:
A six character alpha numeric identifier of a unit
Question 26: Unit Type Code (UTC)
Answer:
A five- Character, code that uniquely identifies each type of unit(force package) of Armed Forces.
Question 27: War Planners
Answer:
Responsible for supporting, developing, and managing planning and execution requirements to support all possible wartime contingencies.
Question 28: Fragmentation Code (FRAG)
Answer:
A one character code, the second of three parts of a ULN. used to identify subordinate units.