PDF Download
FREE AND STUDY GAMES ABOUT SHIP'S 3M EXAM
QUESTIONS
Actual Qs and Ans Expert-Verified Explanation
This Exam contains:
-Guarantee passing score -67 Questions and Answers -format set of multiple-choice -Expert-Verified Explanation Question 1: Who is responsible for the final approval of the 3M quarterly schedule?
Answer:
Department Head (air boss)
Question 2: Who is the command's 3M system manager?
Answer:
Executive Officer (XO) Question 3: What provides a listing of the MIPs for systems and equipment assigned to each work center, and systems and equipment not requiring PMS or currently being evaluated for PMS?
Answer:
LOEP Question 4: Who is the only person that can authorize the splitting of a MIP if an MRC requires another Work Center to completely perform the MRC?
Answer:
Executive Officer
Question 5: What delineates how frequently the maintenance requirement must be performed?
Answer:
periodicity code
Question 6: What changes are authorized revisions to any aspect of existing PMS
documentation and are authorized in TFBR responses?
Answer:
pen and ink Question 7: All of part of the related MRC is performed when specific conditions are present or not met on the referencing MRC is known as what type of maintenance?
Answer:
conditional related Question 8: What are authorizations for and a record of changes to an existing MIP or MRC, or the addition of a new MRC?
Answer:
advance change notices (ACNs) Question 9: What following the periodicity code indicates that this procedure is intended to be scheduled and performed by either ship's force or off-ship maintenance personnel?
Answer:
double plus (++) Question 10: Technical review activities are required to answer all TFBRs submitted to them within how many working days?
Answer:
21 Question 11: What type of FBR is non-technical in nature and is intended to meet PMS needs which do not require technical review?
Answer:
CAT A
Question 12: The intentional placement of a piece of equipment/system in a hibernated state for a specific duration with the intention of reactivating at the end of that duration defines what type of equipment?
Answer:
inactive Question 13: A TFBR will be considered what when the reason for submission of a PMS TFBR involves safety of personnel, ship, or potential for damage to equipment and relates to the technical requirements of PMS?
Answer:
urgent Question 14: What classification is given to an equipment which has been analyzed by the designated technical review activity, and the need for PMS requirements established?
Answer:
MRS Question 15: What maintenance actions ensure that equipment is in a condition suitable for operation or to reactivate an equipment or system that has been inactivated for a prolonged period?
Answer:
start-up Question 16: Who is responsible to the Division Officer via the LCPO/LPO for the effective operation of the 3M system within their respective work center?
Answer:
work center supervisor Question 17: The SYSCOM MRC control number is a how many character alphanumeric code which is assigned in which MRC?
Answer:
7
Question 18: What are basic PMS reference documents?
Answer:
MIPs
Question 19: The maintenance procedures developed in accordance with what principles for planned maintenance are the minimum required to maintain equipment within specifications?
Answer:
PMS master file Question 20: What type of event is a single occurrence or action that may have a maintenance action tied to it?
Answer:
trigger Question 21: What type of even is a persistent event that can be tracked over duration of time (in days)?
Answer:
state Question 22: What will emphasize safety, preservation, damage control readiness, material condition and cleanliness?
Answer:
zone inspections Question 23: What provide detailed procedures for performing maintenance requirements and describes who, what, how, and with what resources a specific maintenance requirement will be accomplished?
Answer:
MRCs
Question 24: What defines an even that must occur for an MRC to be scheduled?
Answer:
situational requirement Question 25: What has been developed to provide the commands maintenance team with the tools to plan, schedule, and control planned maintenance effectively?
Answer:
PMS