-Guarantee passing score -80 Questions and Answers -format set of multiple-choice -Expert-Verified Explanation Question 1: What document must be verified prior to conducting maintenance on a piece of equipment using portable power tools
Answer:
A current safety inspection from the electrical tool issue room
Question 2: What imformation is required on the secondary container label
Answer:
Type of material, manufacturer name and address and nature of hazard, including target orgin
Question 3: Which is an example of a SPLIT MIP
Answer:
When maintanence has a split between two work centers on the same piece of equipment
Question 4: What day must maintanance be closed ot for the week
Answer:
First work day of the week
Question 5: What is IEM status II
Answer:
Equipment scheduled for overhaul for seven days or greater Question 6: Who is responsible for ensuring that personnel assigned to their respective areas understand and comply with the tag out user manual
Answer:
CO Question 7: If a MRC has a SYSCOM control number of 11BWQD Y, what does the Y indicete
Answer:
Repair parts required
Question 8: How often should PMS check 6641/005 M-9R be accomplished
Answer:
Once a Month as required Question 9: Whos responsibility is it to review the CSMP with the WCS and the process TFBRs on a weekly basis
Answer:
DIVO
Question 10: Which of the following is a responsibility of the department head
Answer:
Authorize in writing any equipment placed in IEM status Question 11: T/F-When entering equipment in IEM, you should select an end date by forecasting when you believe you will be bringing the equipment back online
Answer:
False Question 12: What type of spot check is used to validate preventative maintanence that has been completed
Answer:
Historical
Question 13: Pen and ink changes made to a MRC as directed by a FBR must be first initialed by whom
Answer:
DIVO Question 14: What type of tag would be used as a precautionary measure to provide temporary instruction or to indicate that unusual action must be exercised to operate equipment
Answer:
Caution
Question 15: What does CASREP stand for
Answer:
Casualty report Question 16: What does the "C" to the left of the MIP number on the LOEP indicate
Answer:
Change MIP
Question 17: What does TPMTEN stand for
Answer:
Tools, parts, material, and test equipment Question 18: What should a maintenance person do upon completion of preventative maintenance
Answer:
Mark the maintenance action as complete in sked immediately upon completion Question 19: Who is overall responsible for ensuring maintenance is accomplished following the 3M system
Answer:
CO Question 20: Where would a WCS look to find out what maintanence checks are required prior to entering a CNO availability
Answer:
Situational/ R- check report
Question 21: What do the first two numbers of the SYSCOM MRCs Control number indicate
Answer:
Date code
Question 22: Who is responsible for reviewing and finalzing force revision
Answer:
Department head Question 23: In status I IEM, the equipment that will remain on board, is not scheduled for corrective maintenance or overhaul and will be inactive for
Answer:
Seven or more days Question 24: This control document is used for adminstrative OOC and CAL lables. It provides sequential listings of all OOC and CAL instruments.
Answer:
Instrument log Question 25: The international placment of a piece of equipment/ system in a hibernated state for a specific duration with the intention of reactivating at the end of that duration is defined as what
Answer:
Inactive equipment
Question 26: What are considered omitted checks
Answer:
MIPs and MRCs not scheduled that are required Question 27: What manual gives you a generic risk assesment, compatibility imformation, control mesures, safety control, and disposal guidelines for 22 hazardous material groups, arranged by common uses and properties