• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

FREE AND STUDY GAMES ABOUT WORK CENTER SUP

Class notes Jan 11, 2026
Preview Mode - Purchase to view full document
Loading...

Loading study material viewer...

Page 0 of 0

Document Text

PDF Download

FREE AND STUDY GAMES ABOUT WORK CENTER SUP

EXAM QUESTIONS

Actual Qs and Ans Expert-Verified Explanation

This Exam contains:

-Guarantee passing score -80 Questions and Answers -format set of multiple-choice -Expert-Verified Explanation Question 1: What document must be verified prior to conducting maintenance on a piece of equipment using portable power tools

Answer:

A current safety inspection from the electrical tool issue room

Question 2: What imformation is required on the secondary container label

Answer:

Type of material, manufacturer name and address and nature of hazard, including target orgin

Question 3: Which is an example of a SPLIT MIP

Answer:

When maintanence has a split between two work centers on the same piece of equipment

Question 4: What day must maintanance be closed ot for the week

Answer:

First work day of the week

Question 5: What is IEM status II

Answer:

Equipment scheduled for overhaul for seven days or greater Question 6: Who is responsible for ensuring that personnel assigned to their respective areas understand and comply with the tag out user manual

Answer:

CO Question 7: If a MRC has a SYSCOM control number of 11BWQD Y, what does the Y indicete

Answer:

Repair parts required

Question 8: How often should PMS check 6641/005 M-9R be accomplished

Answer:

Once a Month as required Question 9: Whos responsibility is it to review the CSMP with the WCS and the process TFBRs on a weekly basis

Answer:

DIVO

Question 10: Which of the following is a responsibility of the department head

Answer:

Authorize in writing any equipment placed in IEM status Question 11: T/F-When entering equipment in IEM, you should select an end date by forecasting when you believe you will be bringing the equipment back online

Answer:

False Question 12: What type of spot check is used to validate preventative maintanence that has been completed

Answer:

Historical

Question 13: Pen and ink changes made to a MRC as directed by a FBR must be first initialed by whom

Answer:

DIVO Question 14: What type of tag would be used as a precautionary measure to provide temporary instruction or to indicate that unusual action must be exercised to operate equipment

Answer:

Caution

Question 15: What does CASREP stand for

Answer:

Casualty report Question 16: What does the "C" to the left of the MIP number on the LOEP indicate

Answer:

Change MIP

Question 17: What does TPMTEN stand for

Answer:

Tools, parts, material, and test equipment Question 18: What should a maintenance person do upon completion of preventative maintenance

Answer:

Mark the maintenance action as complete in sked immediately upon completion Question 19: Who is overall responsible for ensuring maintenance is accomplished following the 3M system

Answer:

CO Question 20: Where would a WCS look to find out what maintanence checks are required prior to entering a CNO availability

Answer:

Situational/ R- check report

Question 21: What do the first two numbers of the SYSCOM MRCs Control number indicate

Answer:

Date code

Question 22: Who is responsible for reviewing and finalzing force revision

Answer:

Department head Question 23: In status I IEM, the equipment that will remain on board, is not scheduled for corrective maintenance or overhaul and will be inactive for

Answer:

Seven or more days Question 24: This control document is used for adminstrative OOC and CAL lables. It provides sequential listings of all OOC and CAL instruments.

Answer:

Instrument log Question 25: The international placment of a piece of equipment/ system in a hibernated state for a specific duration with the intention of reactivating at the end of that duration is defined as what

Answer:

Inactive equipment

Question 26: What are considered omitted checks

Answer:

MIPs and MRCs not scheduled that are required Question 27: What manual gives you a generic risk assesment, compatibility imformation, control mesures, safety control, and disposal guidelines for 22 hazardous material groups, arranged by common uses and properties

Answer:

OPNAV INSTRUCTION 5100.28

Download Study Material

Buy This Study Material

$11.99
Buy Now
  • Immediate download after payment
  • Available in the pdf format
  • 100% satisfaction guarantee

Study Material Information

Category: Class notes
Description:

PDF Download FREE AND STUDY GAMES ABOUT WORK CENTER SUP EXAM QUESTIONS Actual Qs and Ans Expert-Verified Explanation This Exam contains: -Guarantee passing score -80 Questions and Answers -format s...

UNLOCK ACCESS $11.99