• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

FREE MILITARY AND STUDY GAMES ABOUT 2S071 VOL 2

Class notes Jan 11, 2026
Preview Mode - Purchase to view full document
Loading...

Loading study material viewer...

Page 0 of 0

Document Text

PDF Download

FREE MILITARY AND STUDY GAMES ABOUT 2S071 VOL 2

EXAM QUESTIONS

Actual Qs and Ans Expert-Verified Explanation

This Exam contains:

-Guarantee passing score -103 Questions and Answers -format set of multiple-choice -Expert-Verified Explanation

Question 1: What is the mission change process designed to achieve?

Answer:

Alters demand levels for items applicable to a weapon system that is already assigned at the base that will be affected by a known "mission change", such as the addition or loss of a number of weapon system end items at a base.Question 2: What Bear component subsystem set supports up to 150 personnel in the open-the -base force module?

Answer:

BEAR 150-personnel housekeeping (B-150) set Question 3: Who is the Air Force lead command through the BEAR Integrated Management Team (BIMT) structure for BEAR systems?

Answer:

HQ ACC/A4

Question 4: How long is the support period funded and planned for IRSP?

Answer:

30 days

Question 5: What MICAP cause code indicates base decision not to stock the item

Answer:

D

Question 6: What RIC is used on lateral support shipments?

Answer:

JLS or Dxx.Question 7: Within what time period are COMSEC source documents sent to document control personnel?

Answer:

Within three workdays.

Question 8: List the five major phases in the deliberate planning process

Answer:

Initiation; Concept Development; Plan Development; Plan Review; and Supporting Plans Question 9: What's the result of the consignee not providing a document number for a post-post lateral shipment?

Answer:

The input will be rejected.

Question 10: What type of shipment results from a local management decision?

Answer:

Nondirected shipment.Question 11: Who can direct small arms transfer from one accountable activity to another within or outside the Air Force?

Answer:

WR-ALC

Question 12: Who is responsible for preparing and packaging, inventorying, and maintaining bags

Answer:

War Readiness Element Question 13: In what phase do planners determine the best mix of UTCs, based on availability, timing, criteria, and required AFSCs?

Answer:

Phase III Plan Development Question 14: What MICAP cause code indicates no due-in established and AWP assets are on hand at the time of MICAP

Answer:

X

Question 15: What's a transfer to DRMS? What are the two types of transfers?

Answer:

Movement of materiel to DRMS. Directed and nondirected.

Question 16: When should an AF Form 2005 be used to request an equipment item?

Answer:

When the requested item is in an allowance standard where the approval is at wing/base level or below, and when the allowance standard preface or other directive requires special base-level coordination.Question 17: Who wil process items requiring functional checks according to procedures outlined in AFMAN23-110

Answer:

War-Readiness

Question 18: What's the Serial Number Control System?

Answer:

A central file of all COMSEC assets by serial number within the Air Force.

Question 19: How are RBLs forwarded to a base for retail supply system implementation?

Answer:

Via an electronic Headquarters AFMC Computed Level Transaction (XCA).

Question 20: What are the two types of WRM equipment?

Answer:

Joint-use and mobility equipment

Question 21: What does advice code "6L" identify

Answer:

The requisition is for an AFMC-managed AWP end item

Question 22: When is a Customer Oriented Leveling Technique used?

Answer:

to compute levels for items that have established demand patterns Question 23: What information needs continuous monitoring in the mobility section?

Answer:

Expiration dates for the shelf-life assets.Question 24: What BEAR component set includes facilities, equipment, and supplies necessary to establish and support aircraft flight-related operations and maintenance activities for an initial aircraft squadron deployed at a bare-base location?

Answer:

BEAR initial flight-line (B-IF) set.Question 25: What RDD will be assigned to output requisitions when items are identified as two-level maintenance

Answer:

777 Question 26: What type levels does an RBL override to become the basis for a base's peacetime stock requisitioning

Answer:

Retail supply-computed RBLs and any ASLs

Download Study Material

Buy This Study Material

$11.99
Buy Now
  • Immediate download after payment
  • Available in the pdf format
  • 100% satisfaction guarantee

Study Material Information

Category: Class notes
Description:

PDF Download FREE MILITARY AND STUDY GAMES ABOUT 2S071 VOL 2 EXAM QUESTIONS Actual Qs and Ans Expert-Verified Explanation This Exam contains: -Guarantee passing score -103 Questions and Answers -fo...

UNLOCK ACCESS $11.99