• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

IICL CONTAINER INSPECTOR'S EXAM 2026/2027 QUESTIONS AND ANSWERS NEW UPDATE

Study Material Jul 14, 2025
Preview Mode - Purchase to view full document
Loading...

Loading study material viewer...

Page 0 of 0

Document Text

IICL CONTAINER INSPECTOR'S EXAM 2026/2027 QUESTIONS AND ANSWERS NEW UPDATE

Which of the following defects requires repair?
A. A loose door gasket
B. A bent J-bar that does not affect door operation
C. A dent 13mm (1/2 in) deep on the door sill
D. Four dents, each 11mm (7/16 in) deep, on contiguous outboard corrugations
of a roof panel
A. A loose door gasket
Of the following conditions in a dry-van container, which one would require
cleaning?
A. Raised mud foot prints in excess of what might normally remain after a
sweep out
B. Dry dust covering dried floor stains as might normally be found after a sweep
out
C. Coffee beans remaining inside the container as might occur after a sweep out
D. Polyurethane beads as might be expected to lodge in grooves between
floorboards after a sweep out
C. Coffee beans remaining inside the container as might occur after a sweep out
An Equipment Interchange Receipt (EIR), based on an inspection with no
damage found, can be evidence of a container's compliance with: A. Australian
Timber Component Treatment Regulations B. Convention for Safe Containers
(CSC) regulations through the ACEP Program
C. Transport under custom's seal (TIR) regulations D. International Standards
Organization (ISO) CEDEX codes regulations
B. Convention for Safe Containers (CSC) regulations through the ACEP Program
The top of a replacement plastic ventilator should be centered what distance
from the top side rail? A. 50-55mm (2-2 3/16 in) B. 70-75mm (2 5/8 - 3 in)
C. 100mm (4in) D. 150mm (6 in)

Download Study Material

Buy This Study Material

$24.00
Buy Now
  • Immediate download after payment
  • Available in the pdf format
  • 100% satisfaction guarantee

Study Material Information

Category: Study Material
Description:

IICL CONTAINER INSPECTOR'S EXAM 2026/2027 QUESTIONS AND ANSWERS NEW UPDATE

UNLOCK ACCESS $24.00