• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Instructor’s Resource Manual to accompany Construction Project Management Fifth Edition Frederick E. Gould Nancy E. Joyce (Complete And Verified Study material) (64pages) LEARNEXAMS

exam bundles Jun 19, 2025
Preview Mode - Purchase to view full document
Loading...

Loading study material viewer...

Page 0 of 0

Document Text

CHAPTER QUIZZES CHAPTER 1 QUIZ 1. Construction is defined as a high-risk industry. Why? a. Construction is impacted by outside factors such as government funding. b. Construction is done outside and effected by weather conditions. c. Most construction projects are custom not benefitted from standardization. d. All of the above are true. For questions 2–6, identify in which era the following event/improvement occurred. (Answers are only used once.) a. Ancient times 3200 BC to AD 500 b. Middle ages AD 500 to the 14th Century c. Renaissance 14th Century to 17th Century d. Industrial Revolution 18th to 19th Century e. Modern Times 20th and 21st Century 2. Construction of the transcontinental railroad 3. Construction of the Roman aqueducts 4. The invention of the printing press and slide rule 5. The emergence of a project leader separate from the craftsman, architect and engineer 6. The emergence small cities and states fortified by the construction of castles 7. Increased productivity is an important area of focus for the construction industry and can be achieved by . a. improving the supply chain b. improving the management culture c. more investment in research and development d. improved safety e. a, b, c, and d 8. In the construction of the transcontinental railroad which company faced greater logistical challenges? a. Central Pacific b. Union Pacific 9. Henry Gantt’s graphi


Download Study Material

Buy This Study Material

$30.00
Buy Now
  • Immediate download after payment
  • Available in the pdf format
  • 100% satisfaction guarantee

Study Material Information

Category: exam bundles
Description:

Instructor’s Resource Manual to accompany Construction Project Management Fifth Edition Frederick E. Gould Nancy E. Joyce (Complete And Verified Study material) (64pages) LEARNEXAMS

UNLOCK ACCESS $30.00