• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

TEC GENERAL SAFETY AND SECURITY ORIENTATION TEST

Exam (elaborations) Jan 8, 2026
Preview Mode - Purchase to view full document
Loading...

Loading study material viewer...

Page 0 of 0

Document Text

PDF Download

TEC GENERAL SAFETY AND SECURITY ORIENTATION TEST

Actual Qs and Ans Expert-Verified Explanation

This Exam contains:

-Guarantee passing score -24 Questions and Answers -format set of multiple-choice -Expert-Verified Explanation Question 1: TEC facilities require fall protection with the fall exposure is _____ feet or more

Answer:

Fill out a confined space permit Conduct a RISK assessment briefing with the TEC project supervisor prior to entry Make no entry into any confined space until TEC has reviewed the permit and given approval

Question 2: Only in designated areas

Answer:

Smoking, including the use of electronics cigarettes, is allowed

Question 3: Which does not apply to equipment and to use

Answer:

Cut towards yourself

Question 4: Extension in straight ladder requirements are

Answer:

True

Question 5: True

Answer:

All contractors so have plans to account for their personnel after an incident

Question 6: Chemicals

High voltage High heat work environments

Answer:

Which is a hazard that may be found on a TEC site Question 7: Where exposed blades must be used, which is an example of precautions that shall not be takin

Answer:

A tie off at the top Someone to foot the ladder Question 8: Contractor personnel are not required to be trained and qualified to operate the equipment they utilize

Answer:

50

Question 9: Process Area

Answer:

Any area where equipment or systems may be operational in the support of megawatt production and/or transmission and distribution

Question 10: Minimum PPE requirements while on site include

Answer:

Dark lens in low light areas

Question 11: True

Answer:

If a contractors safety program conflicts with TEC program(s), the contractor shall notify TEC for direction regarding resolution

Question 12: What must be done prior to any hot work activities

Answer:

  • hour
  • Question 13: Spill prevention and control and countermeasures plans (SPCC) are written documents that describe the steps a facility must take to prevent oil spills and to minimize risk of harm to surface waters in the event of a release or oil spill

Answer:

It is critical to safety and to the environment Question 14: _____ Is indicated by a "red" tag and only personnel assigned to work in the area and who receives a job briefing to address the hazards may answer that area

Answer:

Hard hat/Safety glasses with side shields Question 15: Electrical equipment greater than blank volts shall be de-energized and hazardous energy control (HEC) applied before work begins

Answer:

Can be taken home and used when removed from service

Question 16: Why is good housekeeping important

Answer:

Have a valid drivers license to operate a motor vehicle on site Adhere to safe work practices and policies Successfully complete the safety orientation Always have a badge on your person while on site

Question 17: When entering a confined space, contractor shall

Answer:

Section "A" and/or "B" of TEC hot work permits shall be completed Hot work permits shall be approved by designated TEC personnel Follow procedures to prevent accidental fire Remove all flammables and combustibles within a 35' radius

Question 18: Before operating cranes and rigging

Answer:

False

Question 19: Approved eye protection includes all of the following except

Answer:

4 Question 20: A dedicated firewatch is to be provided during the entire hot work operation and for a minimum of _____ after hot work is completed or interrupted

Answer:

TEC must be notified of the intent to bring, use or store any chemicals on site Safety data sheets (SDS) must be available to personnel on site Containers must be labeled Chemicals must be approved by TEC prior to bring on site

Question 21: Hazards associated with the job

Barriers put in place Work procedures involved PPE requirements

Answer:

25

Question 22: Be identified with company name

Use designated entrance gates Park in the designated Parking Areas (all of the above)

Answer:

Contractor vehicles shall Question 23: All barriers in barricades so I'll be tagged every _____ feet on all sides

Answer:

Danger

Download Study Material

Buy This Study Material

$11.99
Buy Now
  • Immediate download after payment
  • Available in the pdf format
  • 100% satisfaction guarantee

Study Material Information

Category: Exam (elaborations)
Description:

PDF Download TEC GENERAL SAFETY AND SECURITY ORIENTATION TEST Actual Qs and Ans Expert-Verified Explanation This Exam contains: -Guarantee passing score -24 Questions and Answers -format set of mul...

UNLOCK ACCESS $11.99