• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

1- 6Study Questions Latest Update -

Exam (elaborations) Dec 14, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

PCI Quality Control Technician Level 1 Chapter 1- 6Study Questions Latest Update - Actual Exam Questions and 100% Verified Correct Answers Guaranteed A+

A commitment to quality starts where in the organization? - CORRECT ANSWER: The

commitment to quality begins with a company's top management.

A number of principal factors in quality control are mentioned in this chapter. Name four of these. - CORRECT ANSWER: Principal factors in quality control include: -Management commitment to quality -Qualified personnel for all stages of design and production -Testing and inspection of the various materials selected for use as well as product storage and handling -Clear and complete shop drawings -Accurate testing procedures -Control of dimensions and tolerances -Proper position of all embedded items -Correct size and positioning of reinforcing steel Proper handling, placing, and consolidation of concrete Proper proportioning and adequate mixing of concrete -Appropriate and controlled curing -Proper procedure for de-tensioning and striping -Proper handling, storing, ransporting, and erecting of members -Complete and accurate production documentation

A plant producing architectural concrete products must have:

  • At least one Level III technician
  • At least one level I and one level II technician
  • at least one Level II technician 1 / 3
  • at least one Level I technician - CORRECT ANSWER: D. At least a level 1 Technician

Each plant should have a written QA program. What is this program called and what are

the minimum items to be addressed by it. - CORRECT ANSWER: Minimum items to be

addressed by the QSM are:

-Management commitment -Definition of organization structure -Management review of the QA program -Plant facilities layout and definition -Purchasing procedures for QC compliance -Uniform methods for reporting, reviewing, and maintaining records -identification of training needs -Control, calibration, and paintenance of necessary equipment -Standards for shop drawings to ensure accuracy and uniform interpretation of instructions for manufacturing handling -Procedures for review and dissemination of project-specific requirements to production and quality control personell.

Inspection and recordkeeping should cover many areas in production. List four of the areas mentioned in this chapter. - CORRECT ANSWER: Inspection and record keeping

should cover the following areas:

-identification, examination, acceptance, and plant testing of materials and subassemblies -Inspecting and recording of tensioning -Inspection of beds and forms prior to concreting -Checking of dimensions of members, numbers, size, and positions of tendons, reinforcing steel, other incorporated materials, openings, blockouts, and the like -Regular inspection of batching mixing, conveying, placing, compacting, finishing, and curing concrete -Preparation of concrete specimens for strength testing and performance of concrete tests 2 / 3

-Inspecting operations of detensioning, product removal from beds, handling, and storing -Preparation of concrete specimens for strength testing and performance of concrete tests -Final inspection of finished product prior to shipment. Monitoring dimensions, camber, blockouts, embedments, and finishes -General observation of plant equipment, working conditions, weather, and other items that have the potential for affecting the products -Products purchased from suppliers shall comply with requirements for in-plant prodcution as outlined in PCI's quality control manuals MNL-116 & 117 -To establish evidence of proper manufactureing and monitoring as outlined, a system of records shall be utilized in each plant for the procedures outlined

Post-pour inspection covers many areas that need to be checked. Name three from this

chapter. - CORRECT ANSWER: Post-pour inspections should include

-Product identification -Visual inspection of product -Product dimensional verification -Strand slippage -Camber -Product storage -Product finish

Production personnel may be involved in quality control activities in practices where

they were directly involved - true or false? - CORRECT ANSWER: False

Project samples should be used for what project conditions? - CORRECT ANSWER:

Project samples should be used when required by the project specifications and when special finishes are involved.

The flag shown on the weld symbol indicates what? - CORRECT ANSWER: Field Weld

  • / 3

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

I was amazed by the in-depth analysis in this document. It was a perfect resource for my project. Truly impressive!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Dec 14, 2025
Description:

PCI Quality Control Technician Level 1 Chapter 1- 6Study Questions Latest Update - Actual Exam Questions and 100% Verified Correct Answers Guaranteed A+ A commitment to quality starts where in the ...

Unlock Now
$ 1.00