◉When it is necessary to wet sieve the concrete sample, wet sieving should be performed after the individual samples are remixed into a
composite sample (T or F) . Answer: F
◉Tests for slump, temperature, and air content must begin within
______ minutes after obtaining the composite sample . Answer: 5
minutes
◉Begin molding test specimens within ______ minutes after obtaining
the composite sample . Answer: 15 minutes
◉The concrete samples should be protected from . Answer: the sun,
wind, and other sources of rapid evaporation, from contamination
- / 2
◉When test specimens are to be molded, the minimum size of sample
obtained is . Answer: 28 L (1 ft^3)
◉The primary objective of the sampling process is to obtain a
representative sample (T or F) . Answer: T
◉When sampling from a revolving drum truck mixer collect concrete
from ______ portions of the batch . Answer: 2 or more
◉Wet sieving is performed . Answer: when the concrete contains
aggregates larger than appropriate for a test
◉When sampling from a paving mixer it is not acceptable to place 3 small containers on the sub grade in order to obtain the required samples
of concrete (T or F) . Answer: F
◉TEMPERATURE . Answer:
◉it may require up to ___ min before the temp stabilizes when the NMS
of the coarse agg is greater than ___ . Answer: 20min., 3in.
◉The container for the concrete shall be large enough to provide at least ___ inches, or _____ of coarse agg, of concrete in all directions around
the TMD . Answer: 3in., 3 x NMS