ADVANCE RIGGER TEST (ACTUAL / ) QUESTIONS AND
VERIFIED 100% CORRECT ANSWERS
Proper lead sheave placement as it relates to the hoisting
drum location is:
- The drum to hoist faster
- Wires in rope to stay together
- Proper spooling of wire rope
- Precise hoisting - --Answers----c. Proper spooling of wire
rope
The MOST important information to consider when planning a
lift is:
- Weather
- Weight of the load
- Time of lift
- Available rigging gear - --Answers----b. Weight of the load
Prior to use, all new, altered, modified, or repaired rigging hardware shall be inspected by whom?
- An equipment manager
- A signal person
- A safety coordinator
- A designated person - --Answers----d. A designated
person 1 / 3
An unsafe condition that riggers should be aware of when
dealing with a multi part load block is:
- Decreased lifting capacity
- Static load
- Twisting multi part lines
- Added crane gross capacity - --Answers----c. Twisting
multi part lines
37. Most cranes in duty cycle operation require a:
- Load line deduction
- Critical lift plan
- Load test
- Deduction of rated capacity - --Answers----c. Load test
The only personnel allowed to have their body parts outside of the suspended personnel platform during hoisting and
lowering operations are:
- Master riggers
- Qualified persons
- Signal persons
- Craft workers - --Answers----c. Signal persons
What is the most important reason rigging hardware should NOT be modified?
- It makes it hard to know who is responsible for the gear 2 / 3
- It could negatively affect its capacity
- It would require load tests
- It could be expensive and time consuming - --Answers----
- It could negatively affect its capacity
In the term (D/d ratio) the d is an abbreviation for:
- Distribution
- Density
- Diameter
- Displacement - --Answers----c. Diameter
A document that outlines weights, crane configuration and
rigging requirements for a lift is called a:
- Lift work order
- Bill of lading
- Lift plan
- Lift inspection - --Answers----c. Lift plan
When using a 1-inch wire rope sling in a vertical basket hitch lifting a 24-foot long, 36-inch diameter pipe,
- 12 to 1
- 24 to 1
- 36 to 1
- 48 to 1 - --Answers----c. 36 to 1