• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

ADVANCE RIGGER TEST ACTUAL QUESTIONS AND

Exam (elaborations) Dec 14, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

ADVANCE RIGGER TEST (ACTUAL / ) QUESTIONS AND

VERIFIED 100% CORRECT ANSWERS

Proper lead sheave placement as it relates to the hoisting

drum location is:

  • The drum to hoist faster
  • Wires in rope to stay together
  • Proper spooling of wire rope
  • Precise hoisting - --Answers----c. Proper spooling of wire
  • rope

The MOST important information to consider when planning a

lift is:

  • Weather
  • Weight of the load
  • Time of lift
  • Available rigging gear - --Answers----b. Weight of the load

Prior to use, all new, altered, modified, or repaired rigging hardware shall be inspected by whom?

  • An equipment manager
  • A signal person
  • A safety coordinator
  • A designated person - --Answers----d. A designated
  • person 1 / 3

An unsafe condition that riggers should be aware of when

dealing with a multi part load block is:

  • Decreased lifting capacity
  • Static load
  • Twisting multi part lines
  • Added crane gross capacity - --Answers----c. Twisting
  • multi part lines

37. Most cranes in duty cycle operation require a:

  • Load line deduction
  • Critical lift plan
  • Load test
  • Deduction of rated capacity - --Answers----c. Load test

The only personnel allowed to have their body parts outside of the suspended personnel platform during hoisting and

lowering operations are:

  • Master riggers
  • Qualified persons
  • Signal persons
  • Craft workers - --Answers----c. Signal persons

What is the most important reason rigging hardware should NOT be modified?

  • It makes it hard to know who is responsible for the gear 2 / 3
  • It could negatively affect its capacity
  • It would require load tests
  • It could be expensive and time consuming - --Answers----
  • It could negatively affect its capacity

In the term (D/d ratio) the d is an abbreviation for:

  • Distribution
  • Density
  • Diameter
  • Displacement - --Answers----c. Diameter

A document that outlines weights, crane configuration and

rigging requirements for a lift is called a:

  • Lift work order
  • Bill of lading
  • Lift plan
  • Lift inspection - --Answers----c. Lift plan

When using a 1-inch wire rope sling in a vertical basket hitch lifting a 24-foot long, 36-inch diameter pipe,

  • 12 to 1
  • 24 to 1
  • 36 to 1
  • 48 to 1 - --Answers----c. 36 to 1
  • / 3

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

This document provided step-by-step guides, which made learning easy. Absolutely superb!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Dec 14, 2025
Description:

ADVANCE RIGGER TEST (ACTUAL / ) QUESTIONS AND VERIFIED 100% CORRECT ANSWERS Proper lead sheave placement as it relates to the hoisting drum location is: a. The drum to hoist faster b. Wires in rope...

Unlock Now
$ 1.00