• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

Asphalt Paving Level 1 Latest Update -

Exam (elaborations) Dec 14, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Asphalt Paving Level 1 Latest Update - Actual Exam Questions and 100% Verified Correct Answers Guaranteed A+ Verified by Professor

A full lot is composed of 5 sublots and 4 cores per lot T/F - CORRECT ANSWER: False

A full lot of super pave asphalt is what size?1,000 tons 1,000 to 2000 tons 2000 to 4000 tons

1 days production - CORRECT ANSWER: 2000 to 4000 tons

A tack truck distributor tank reading of 20/15 translates to - CORRECT ANSWER: 20 inches 15/16s inches

A temperature corrected quantity of tack to 60 degrees in gallons will be ___ than the original measured amount measured at higher temperature.More Less The same as

None of the above - CORRECT ANSWER: More

Align the core barrel over the marked sampling location so that It is a slight angle to the pavement It is perpendicular to the truck bumper It is perpendicular to the pavement surface The top of the barrel is tilted slightly towards the truck - CORRECT ANSWER: It is perpendicular to the pavement surface 1 / 2

Asphalt placed when the mix temperature is too low can cause which of the following problems?Texture problems Density may not be achieved Ride or smoothness problems

All the above - CORRECT ANSWER: All the above

Density cores for acceptance testing are not required for:

Mix less than 1 inch thick Shoulders less than 5 feet wide Acceleration and deceleration lanes less than 1000 feet in length

Ramos less than 1000 feet - CORRECT ANSWER: All of the above

For bridge approach slabs, the 15 foot manual straightedge should be set so ____ is on the bridge deck.

  • inch
  • Exactly 1/2 of the straightedge The entire straightedge

None of the above - CORRECT ANSWER: 1 inch

For the first transverse joint on a project place the ___ on the new pavement while overlapping the transverse joint by one inch.

  • foot level
  • 15 foot manual straight edge Rolling straightedge

All the above - CORRECT ANSWER: 15 foot manual straight edge

Given the target mix temperature of 290 degrees and the following truck temperatures 280, 285, 295, 300, 275....

  • / 2

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

With its comprehensive coverage, this document made learning easy. Definitely a excellent choice!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Dec 14, 2025
Description:

Asphalt Paving Level 1 Latest Update - Actual Exam Questions and 100% Verified Correct Answers Guaranteed A+ Verified by Professor A full lot is composed of 5 sublots and 4 cores per lot T/F - CORR...

Unlock Now
$ 1.00