Aerial plant - CORRECT ANSWER: Aerial plant typically has an expected life of about 30 years
Alternate Route Considerations - CORRECT ANSWER: An alternative route may be
considered if the field investigation indicates the proposed route would • High installation costs.• An unsafe working environment.• Future maintenance issues.
Direct-buried plant - CORRECT ANSWER: A lifespan of 30 years or shorter, depending on different conditions
Documentation - CORRECT ANSWER: A record should be made of the proposed route
details (e.g., path, quantity, size, depth)
Existing route - CORRECT ANSWER: The existing route may be fully adequate. The
OSP designer should evaluate the existing:
• Pole lines.• Conduit.• MHs.• Handholes (HHs).• Tunnels.
Flagging, Painting, and Marking Utilities - CORRECT ANSWER: All subsurface utilities must be located prior to construction and may be required for proper design.