• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

CEPSCI CERTIFIED EROSION PREVENTION

Exam (elaborations) Dec 14, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

  • | Page

CEPSCI (CERTIFIED EROSION PREVENTION

AND SEDIMENT CONTROL INSPECTOR)

UPDATED ACTUAL EXAM WITH CORRECT

SOLUTIONS.

NPDES - correct answer- National Pollutant Discharge Elimination System

Clean Water Act - correct answer- Administered by the EPA in 1972

Water Quality Act - correct answer- Amendment to CWA in 1987 to regulate storm water discharges under NPDES program

Point Source Pollution - correct answer- Discharges from readily identifiable sources like treatment plants

Nonpoint Source Solution - correct answer- Runoff from urbanized or agricultural areas

  • / 3
  • | Page

NPDES in South Carolina - correct answer- SC is a delegated state. Regulations are administered by SCDHEC

CGP Phase II - correct answer- Construction General Permit effective on September 1, 2006

NPDES Permit Coverage - correct answer- 1 or more acres of land disturbance. Within 1/2 mile of a receiving water body in SC Coastal Zone

NOI - correct answer- Notice Of Intent

CGP Requirements for OCRM - correct answer- Coverage granted 7 days after DHEC receives NOI

CGP Requirements for SCDOT - correct answer- Coverage granted 10 days after DHEC receives NOI

CGP Requirements for DHEC - correct answer- Coverage granted 20 days after DHEC receives completed NOI

  • / 3
  • | Page

SWPPP - correct answer- Storm Water Pollution Prevention Plan, Completed prior to filing NOI, Prepared in accordance with Phase II CGP

SWPPP Requirements - correct answer- Identification of operators Sequence of construction Locations of all BMP's Locations of all surface waters of state

CGP Filing - correct answer- Must be in compliance with all other permits Must comply with Federal reporting requirements File NOT when construction is complete Retain documentation 3 years.

Pre Construction meeting - correct answer- 10 or more acres Explain SWPPP to all co-permittees Contractors that are not co-permittees and the preparer must be present

  • / 3

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

With its detailed explanations, this document enhanced my understanding. Definitely a superb choice!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Dec 14, 2025
Description:

CEPSCI (CERTIFIED EROSION PREVENTION AND SEDIMENT CONTROL INSPECTOR) UPDATED ACTUAL EXAM WITH CORRECT SOLUTIONS. NPDES - correct answer- National Pollutant Discharge Elimination System Clean Water ...