• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

CISEC Exam Latest Update -

Exam (elaborations) Dec 14, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

CISEC Exam Latest Update - Exam from Credible Sources with 120 Questions and Verified Correct Answers Golden Ticket to Guaranteed A+ Verified by Professor

"Check structures" as an Erosion Control measure. - CORRECT ANSWER: Top of the downstream structure MUST be IN-LINE with the Bottom of the upstream structure to minimize erosion.

"Sump" conditions - CORRECT ANSWER: when water comes to a low point and *captures* runoff

Basin divides - CORRECT ANSWER: Separates flows

-water that goes from low point to high. To extend the time of concentration

Bix Box Projects - CORRECT ANSWER: -commercial buildings

-mass grading and mass choas -highly visible w/ fairly large footprint

Cellular confinements - CORRECT ANSWER: Rigid plastic structure where soil can be placed into for vegetative establishment.

CWA Penalty Types - CORRECT ANSWER: Adminstrative

Class I. Neglegent Class II. Knowlingly = greater fines

Diversion Channel and Berms - CORRECT ANSWER: an E.C. method used to direct

runoff to a specific location

  • / 3

Inspection:

  • Will runoff remain within the diversion channel?
  • Are the embankements stabilized?
  • Is the discharge area stabilized?

ECB and TRM - CORRECT ANSWER: Erosion Control Blanket and Turf Reinforcement

Mats

  • RECB/ECB = usually put on hillsides
  • TRM = usually put on channels

Inspect:

  • Has seed been planted before laying the blanket?
  • Is the material anchored in a trench?
  • Do sufficient staples exist (2 in. apart?)
  • Are the edges secure (w staples)?
  • Can you pull up the TRM 6-12'? = Not good

Establishing Vegetation - CORRECT ANSWER: #1 method for E.C.

  • Delineate area carefully!
  • Vegetative Buffer Strip: used to delineate areas of no construction and sensitive
  • areas. Also traps sediment in runoff waters.

  • Installing SOD: Instant erosion control, but requires moisture and proper installation.

Flocculant Treatment System Types - CORRECT ANSWER: 1. Liquid Treatment

System - water pumped from SCS and mixed w flocculant in a treatment chamber then sent to a capture system where treated water can be discharged 2 / 3

  • Solid Treatment System - runoff dissolves o soild flocculant "block"
  • -may or may not have a treatment chamber

Flocculants - CORRECT ANSWER: chemicals added to a mixture to make suspended

particles clump together

created larger particles that fall rapidly

method for reducing turbidity

Types of flocculants:

Cationic = dangerous for fish/can suffocate Anionic = ok for fish

Gabions - CORRECT ANSWER: Steel mesh cages filled with small rocks, absorb wave

energy.

Hard Armoring - CORRECT ANSWER: Using rip rap/ rock on hillsides

-Are animals borrowing in it?

  • Is sediment accumulating on rocks?
  • Is the rock being undercut or collapsing?

Inspecting Area Drains / Rock Barriers - CORRECT ANSWER: Is the area drain in a

sump?

Rock barriers around area drain:

  • Does 1.5 to 2 in. diameter rock exist around? Appropriate size rocks?
  • / 3

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

This document featured in-depth analysis that was incredibly useful for my research. Such an remarkable resource!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Dec 14, 2025
Description:

CISEC Exam Latest Update - Exam from Credible Sources with 120 Questions and Verified Correct Answers Golden Ticket to Guaranteed A+ Verified by Professor "Check structures" as an Erosion Control m...

Unlock Now
$ 1.00