Arizona General Residential Contractor (Class B-2) Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf
- What is the primary purpose of a building permit?
- To provide tax information
- To ensure compliance with zoning and building codes
- To allow contractors to charge more
- To reduce construction costs
Answer: B. To ensure compliance with zoning and building codes
Rationale: Building permits ensure that construction meets local safety,
structural, and zoning regulations, protecting public safety and property value. 1 / 4
- When is a contractor required to provide a written contract in Arizona
- Only if requested by the homeowner
- For projects over $1,000
- For projects over $500
- For all projects regardless of cost
for a home improvement project?
Answer: C. For projects over $500
Rationale: Arizona law requires written contracts for home improvement
projects exceeding $500 to clarify scope, cost, and responsibilities.
- Which soil type is most prone to shifting and requires special foundation
- Sand
- Clay
- Gravel
- Loam
design?
Answer: B. Clay
Rationale: Clay soils expand and contract significantly with moisture
changes, which can cause foundation movement if not properly addressed.
- What is the minimum slope required for a residential roof to ensure
water runoff?
A. 1/2:12
B. 2:12 2 / 4
C. 4:12
D. 6:12
Answer: B. 2:12 Rationale: A 2:12 slope allows for adequate water runoff in most roofing materials, though some materials require steeper slopes.
- What is the purpose of flashing in residential construction?
- To provide decorative trim
- To prevent water intrusion at roof and wall intersections
- To insulate the roof
- To support structural beams
Answer: B. To prevent water intrusion at roof and wall intersections
Rationale: Flashing directs water away from vulnerable areas like chimneys,
skylights, and roof valleys, preventing leaks and water damage.
- In Arizona, what is the maximum retention amount a homeowner may
- 5%
withhold from a contractor?
B. 10%
C. 15%
D. 20%
Answer: B. 10%
Rationale: State regulations allow homeowners to retain up to 10% of the 3 / 4
contract price until satisfactory completion to protect against incomplete work.
- What is the typical spacing for wood studs in residential framing?
- 12 inches on center
- 16 inches on center
- 18 inches on center
- 24 inches on center
Answer: B. 16 inches on center
Rationale: 16-inch spacing provides optimal structural support and
compatibility with standard sheathing and drywall sizes.
- Which fire rating is required for interior garage walls adjacent to living
- 15 minutes
- 30 minutes
- 45 minutes
- 1 hour
space in Arizona?
Answer: B. 30 minutes
Rationale: A 30-minute fire-rated barrier helps prevent fire spread from the
garage to living areas, as required by building codes.
- What is the primary purpose of vapor barriers in construction?
- To provide insulation
- To prevent moisture penetration into walls and floors
- / 4