Arizona General Commercial Contractor (Class B) Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf
- A Class B contractor in Arizona is required to maintain which type of
- Health insurance
- Liability insurance
- Workers’ compensation insurance
- Vehicle insurance
insurance?
Rationale: Class B contractors must have workers’ compensation
insurance for employees to comply with state law and protect against workplace injuries. 1 / 4
- When a contractor is paid a deposit exceeding $1,000 for home
improvements, Arizona law requires:
- Full completion of work before using funds
- A written contract
- Only verbal agreement
- No requirement
Rationale: Arizona statutes require a written contract for deposits
over $1,000 to protect both parties and clearly define scope and payment terms.
3. The purpose of a building permit is to:
- Increase construction costs
- Ensure compliance with building codes
- Guarantee project completion
- Avoid inspections
Rationale: Permits ensure that construction adheres to safety,
zoning, and structural regulations.
4. In Arizona, the Arizona Registrar of Contractors oversees:
- Federal construction projects
- Tax collection
- Licensing and regulation of contractors
- Insurance policies
Rationale: The Registrar of Contractors licenses, regulates, and
enforces compliance for contractors in the state. 2 / 4
- Which of the following materials is considered combustible?
- Concrete
- Steel
- Wood
- Brick
Rationale: Wood is combustible and must be treated or used with fire
safety precautions.
- What is the standard slope for residential roof drainage?
- 1/16 inch per foot
- 1/4 inch per foot
- 1 inch per foot
- 1/2 inch per foot
Rationale: The typical minimum slope for proper roof drainage in
residential construction is 1/4 inch per foot.
7. OSHA requires fall protection for workers at heights of:
- 2 feet
- 4 feet
- 6 feet
- 10 feet
Rationale: OSHA mandates fall protection for construction workers
at 6 feet or higher to prevent injuries.
8. The term “liquidated damages” refers to:
- Cash payment at project start 3 / 4
- Contractor’s profit
- Pre-determined damages for project delays
- Insurance claims
Rationale: Liquidated damages are a contractual method to
compensate the owner for delays without proving actual loss.
9. The proper sequence of construction scheduling is:
- Framing → Site Prep → Foundation → Finishing
- Site Prep → Foundation → Framing → Finishing
- Foundation → Finishing → Framing → Site Prep
- Framing → Finishing → Site Prep → Foundation
Rationale: Construction starts with site preparation, followed by
foundation, structural framing, and then finishing work.
- A contractor discovers underground electrical lines during
- Continue digging
- Notify the owner
- Stop work and contact utility company
- Use alternative tools
excavation. What is the first action?
Rationale: Safety regulations require stopping work and notifying
utilities to prevent hazards.
11. The primary purpose of a lien is to:
- Reduce taxes
- Secure payment for labor or materials
- / 4