IWCF Level 3 Well Intervention Pressure Control Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf
- Which of the following is the primary purpose of a blowout preventer
- Increase production rate
- Prevent uncontrolled flow of formation fluids
- Monitor drilling mud density
- Stabilize the drill string
(BOP) during well intervention?
Rationale: The primary purpose of a BOP is to prevent uncontrolled flow of
formation fluids, ensuring well control during intervention operations.
- What is the main function of the annular preventer?
- Provide a passage for wireline tools 1 / 4
- Seal around any size of tubing or drill pipe
- Circulate drilling fluid
- Measure well pressure
Rationale: The annular preventer is designed to seal around various sizes
of tubulars or even an open hole.
- Which type of BOP is used specifically for pipe ram operations?
- Annular BOP
- Ram BOP
- Diverter BOP
- Subsea BOP
Rationale: Ram BOPs are used for sealing around the drill pipe or
completely closing the wellbore in emergencies.
- During a well intervention, you notice a slow increase in surface
- Pump failure
- Kick from formation fluid
- Tool string stuck in hole
- Circulation loss
pressure. What is the most likely cause?
Rationale: A gradual increase in surface pressure is often indicative of a
kick, where formation fluids enter the wellbore.
- What is the recommended method to verify BOP function before
starting well intervention? 2 / 4
- Visual inspection only
- Pressure testing each preventer
- Running wireline
- Circulating drilling mud
Rationale: Pressure testing each BOP is critical to ensure proper function
and integrity before intervention.
6. The term “kill mud” refers to:
- Mud that lubricates the drill string
- Mud that enhances production
- Mud weighted to control formation pressure
- Mud used for cementing
Rationale: Kill mud is a high-density fluid used to control formation
pressure and prevent kicks.
- Which operation is considered a primary well control method during
- Using a slickline
- Closing the BOP to seal the well
- Logging the well
- Pulling tubing
intervention?
Rationale: Primary well control involves directly preventing influx, typically
by sealing the well with a BOP. 3 / 4
- In subsea well intervention, the hydraulic system for the BOP is
primarily used to:
- Circulate mud
- Operate the crane
- Open and close the BOP
- Measure formation pressure
Rationale: Subsea BOPs are operated hydraulically to control the opening
and closing of rams or annular preventers.
- When performing a well kill operation, what is the main objective?
- Increase flow rate
- Reduce mud density
- Stop the influx of formation fluids
- Pull tubing safely
Rationale: Well kill operations are aimed at stopping the influx and
regaining control of the well.
- What is the correct action if a ram BOP cannot fully close around
- Continue intervention
- Circulate faster
- Shut in the annular preventer
- Pull the pipe immediately
- / 4
the drill pipe?