• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

D-90 - CORRECT ANSWER: B-45

Exam (elaborations) Dec 14, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Florida Contractors Manual Questions and Answers – 1 Latest Update - Actual Exam Questions and 100% Verified Correct Answers Guaranteed A+

___ days so the maximum time after commencing construction for the contractor to give notice to the owner of his lien rights

A-30 B-45 C-60

D-90 - CORRECT ANSWER: B-45

A contract will not be enforced if it is

A- oral B- illegal C- no work is accomplished for 90 days

D- all of the above - CORRECT ANSWER: B- illegal

A lien that is properly perfected may be discharged by any of the following except ____

A-the completion of the project B-by failure to begin action to enforce writhing prescribed time limit C-by an order of the circuit court D-by recording in clerks officer of a judgement by court of competent jurisdiction - CORRECT ANSWER: A- the completion of the project

A secondary qualifying agent has pulled a permit for a building project. There is a problem with payment to a subcontractor. ___ is responsible for the payment to the subcontractor 1 / 3

A-primary qualifying agent B-both primary & secondary have joint responsibility C-secondary qualifier

D-owner of the company - CORRECT ANSWER: A- primary qualifying agent

A short-term project schedule is a detailed explanation of the next two weeks of construction activities and should be developed and/or reviewed by all of the following except ___

A-superintendent B-architect C-subcontractors

D-project engineer - CORRECT ANSWER: B- architect

A subcontractor started work in his co tract with the general contractor on aug. 1 . The owner made the final payment to the general contractor on sep 13 . The latest fat the sub contractor can serve notice to owner to preserve his claim under the construction kein law is _______

A- sep 16 B- sep 15 C- sep 13

D- sep 12 - CORRECT ANSWER: D- sep 12

Page: 9-21

According to the statue of frauds, a contract need not be in writing and still be enforceable in Florida if less than ___ and ___

A-$500 in value and less than 2 years in length B-$1000 in value and less than 1 year in length 2 / 3

C-$2500 in value and less than 1 year in length D-$500 in value and less than 1 year in length - CORRECT ANSWER: D-$500 I'm value and less than 1 year in length

After relocating his business to a new location, the contractor has ___ days to notify the department of his new address

A-10 B-21 C-45

D-60 - CORRECT ANSWER: C-45

All of the following must follow OSHA standards except ___

A-religious establishments B-general contractor with one employee C-landscape contractors

D-equipment rental business - CORRECT ANSWER: A-religious establishemnts

An Action for breach of a written contract must be brought within ____ years

A-2 B-3 C-4

D-5 - CORRECT ANSWER: D-5

Based on the completed contract method, for a job bid at $300,000 and currently 66.67% complete, with a gross profit of 16.67% (50,000) the current amount of profit recognized would be

A-$200,000

  • / 3

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

This document featured detailed explanations that made learning easy. Such an impressive resource!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Dec 14, 2025
Description:

Florida Contractors Manual Questions and Answers – 1 Latest Update - Actual Exam Questions and 100% Verified Correct Answers Guaranteed A+ ___ days so the maximum time after commencing constructi...

Unlock Now
$ 1.00