• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

DBIA 3 TEST QUESTIONS WITH

Exam (elaborations) Dec 14, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

DBIA 3 TEST QUESTIONS WITH

CERTIFIED ANSWERS BEST SOLUTION-

CHALLENGE TEST -

QUESTION AND CORRECT ANSWERS

VERIFIED ANSWERS ALREADY

GRADED A+

The true measure of a teamis that it accomplishes the - ANSWER✔✔results sets out to achieve The Owner sets the - ANSWER✔✔tone for the project Being good at construction management or project management will not - ANSWER✔✔automatically make you good at Design-Build management Owners know how to do Design-Bid-Build - ANSWER✔✔They have a comfort level with tradition-Many have a tendency to "tweak" Design-Build to look more like Design-Bid-Build•"Low Bid" to select the team•Dictating solution through prescriptive design Performance Monitors (Owner's Rep) - ANSWER✔✔On the front lines—Owner's agents who regularly oversee Design-Build Team's performanceAssigned specific areas of award fee responsibility (in accordance with criteria)Must provide regular performance feedback to Design-Build teamAt the end of each period, provide input for award fee determination Design-Value Interface - ANSWER✔✔Managing the project to ensure that Best Value is delivered to the Owner 1 / 2

Design-Cost Interface - ANSWER✔✔Managing & monitoring the project to meet the constraints of the budget Design-Construct Interface - ANSWER✔✔Managing & monitoring the design to meet the requirements for sequence, constructability, productivity, fabrication, procurement, & schedule Design-Performance Interface - ANSWER✔✔Managing & monitoring the project to meet the performance and quality criteria of the project Owners value design and architecture as a significant delivery objective - ANSWER✔✔Owners traditionally "trust" architects and are skeptical of contractors Design Value is a - ANSWER✔✔subjective deliverable Value - ANSWER✔✔Performance + Quality/Cost Design-Cost RelationshipIn Design-Bid-Build - ANSWER✔✔Design is Fixed -Design dictates cost (and performance becomes a variable) Design-Cost RelationshipIn Design-Build - ANSWER✔✔Designing to Budget Cost & Performance are Fixed Trend Management Program - ANSWER✔✔Tool used to identify, evaluate, manage, and resolve changes during design, procurement, & construction Encourages a proactive approach with the owner to resolve any changes Mitigates any disputes before they become bigger problems Typical Internal Trends - ANSWER✔✔Design Development changes

•Work quantity adjustments•Changes associated with constructability or fabrication issues

  • / 2

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

This document featured detailed explanations that was a perfect resource for my project. Such an excellent resource!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Dec 14, 2025
Description:

DBIA 3 TEST QUESTIONS WITH CERTIFIED ANSWERS BEST SOLUTION- CHALLENGE TEST - QUESTION AND CORRECT ANSWERS VERIFIED ANSWERS ALREADY GRADED A+ The true measure of a teamis that it accomplishes the - ...

Unlock Now
$ 1.00