• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

DBIA EXAM 3 Latest Update -

Exam (elaborations) Dec 14, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

DBIA EXAM #3 Latest Update - 180 Questions and 100% Verified Correct Answers Guaranteed A+

_____ _____ _____ Documents set forth the documents that, if changed, would allow for a change

order. - CORRECT ANSWER: Basis of Design

_____ _____ _____ mandates that certain types of contracts be written. - CORRECT ANSWER: Statute of Frauds

_____ _____ _____: defines who is responsible for what portion of the deliverables for the RFQ/RFP. -

CORRECT ANSWER: Matrix of Responsibilities

_____ _____ _____: Modifies a mandatory RFP requirement. - CORRECT ANSWER: Alternative Technical Concepts

_____ _____ _____: Subsurface or physical conditions at the site that differ materially from those

indicated in the CD - CORRECT ANSWER: Differing Site Conditions

_____ _____ _____: the use of a word in a specific industry.

a.) Course of Performance b.) Course of Conduct

c.) Terms of Art - CORRECT ANSWER: c.) Terms of Art

_____ _____ _____: Unknown physical conditions at the site, of an unusual nature that differ materially from those ordinarily encountered and generally recognized as inhering in the work of the character

provided for in the contract. - CORRECT ANSWER: Differing Site Conditions

_____ _____ _____: what the parties do during the performance of other similar contracts. 1 / 3

a.) Course of Performance b.) Course of Conduct

c.) Terms of Art - CORRECT ANSWER: b.) Course of Conduct

_____ _____ _____: what the parties do during the performance of this contract.

a.) Course of Performance b.) Course of Conduct

c.) Terms of Art - CORRECT ANSWER: a.) Course of Performance

_____ _____ are agreements that address business pursuits. - CORRECT ANSWER: Teaming Agreements

_____ _____ are Payment and performance bonds requires for public works contracts - CORRECT

ANSWER: Surety Bonds

_____ _____ contracts satisfy many of the goals behind DB best practices. - CORRECT ANSWER: Standard Form

_____ _____ Insurance: First-party coverage against physical damage to project during construction. -

CORRECT ANSWER: Builder's Risk

_____ _____ Insurance: Risk of liability due to injuries to workers. Each state has different statutes. -

CORRECT ANSWER: Worker's Compensation

_____ _____ Insurance: Risk of liability to Owner from employee injuries caused by occupational

diseases. - CORRECT ANSWER: Employer's Liability

_____ _____ Insurance: Risk of liability to third parties for BI/PD caused by vehicle accidents in

connection with the project. - CORRECT ANSWER: Auto Liability

  • / 3

_____ _____ risk is one of the major risks on projects. - CORRECT ANSWER: Site Condition

_____ ______ & _____ _____: If contract's subject is unique, a court may order that the breaching party perform its obligations under that contract (specific performance) or stop doing something (injunction). -

CORRECT ANSWER: Specific Performance & Injunctive Relief

_____ ______ contracting rule makes it very difficult to create an Oral contract. - CORRECT ANSWER: Public Sector

_____ _____: Any party entering into a lower tier or subcontracting agreement with Design-

Builder. - CORRECT ANSWER: Teaming Party

_____ _____: Award of a reasonable sum of money (i.e., "what the claimant deserved") - CORRECT

ANSWER: Quantum Meruit

_____ _____: Means of protecting a party who is reliant on someone's actions. - CORRECT ANSWER: Promissory Estoppel

_____ _____: Provides the following implied warranties-- Plans and specs furnished are accurate and are

suitable for intended purpose. - CORRECT ANSWER: Spearin Doctrine

_____ _____: When expectation damages not available, award what party would have had if contract

had not existed. - CORRECT ANSWER: Rescission Damages

_____ Agreement: The subcontractor that the parties will enter into if Design-Builder wins the

procurement. - CORRECT ANSWER: Subsequent

_____ and _____ contracts are fundamental to any delivery process. - CORRECT ANSWER: - Fair

  • Clear

_____ Application: Owner needs to pay once for items negligently omitted. - CORRECT ANSWER: Practical

  • / 3

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

This document featured in-depth analysis that helped me ace my presentation. Such an superb resource!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Dec 14, 2025
Description:

DBIA EXAM #3 Latest Update - 180 Questions and 100% Verified Correct Answers Guaranteed A+ _____ _____ _____ Documents set forth the documents that, if changed, would allow for a change order. - CO...