DBIA - PRINCIPLES OF DESIGN-BUILD AND
POST AWARD
AND CORRECT ANSWERS VERIFIED
ANSWERS ALREADY GRADED A+
Occurs when the design component has been priced and confirmed "within budget" and when the drawings and specs are approved by the Designer on record as complying with the RFP. - ANSWER✔✔Committed Design
- - Facilitate decisions to keep the estimate from increasing budget.
- - Encouraging proactive approaches to resolve changes quickly with the owner.
- - Tracking & Documenting cost fluctuations between milestone estimates.
- - Mitigating disputes before they get larger. - ANSWER✔✔Trend Management
When the design is completed enough such that accurate cost estimates can be determined. - ANSWER✔✔Design Stability A multi-disciplined comprehensive risk identification, evaluation and analysis session that involves representatives from the entire design build team. - ANSWER✔✔Joint Risk Assessment Award Fees, Shared Shavings, Target Cost Contracts, Alliance Contracts. - ANSWER✔✔Performance Incentives Cooperative Contracting model that is characterized by collaboration and aligning values, goals and objectives amongst owner, architect and contractor. Shares Risk among all participants. - ANSWER✔✔Alliance Contract Incentive mechanism for target cost contracts that triggers a financial reward when the DB'er meets or exceeds certain performance standards. Typically for non-cost related performance items: safety, schedule, communication, customer satisfaction. - ANSWER✔✔Award Fee 1 / 2
- - ID MWEBE Goals
- - Expected Substantial Completion Date
- -Weighted proposal selection criteria
4 - Performance Requirements - ANSWER✔✔RFP should include:
- - Statement of desired results
- - Attributes or Characteristics of a facility Element
- - Measurable or observable definitions of performance
- - Testing requirements to validate performance - ANSWER✔✔Performance Specs should include:
- - Fixed Price/Best Design
- - Equivalent Design/Low Bid
- - Adjusted Low Bid - ANSWER✔✔Best Value Procurement Examples
- - When the owner issues addenda to the RFP after reviewing design proposals to reflect aspects that
- - Footprint SF
- - Gross SF
- - Building Perimeter
Form of Procurement where techinical proposals are critiqued not scored and the proposer revises design and is then judged off of low bid. - ANSWER✔✔Equivalent Design/Low Bid AKA BAFO
the owner likes about each proposal. - ANSWER✔✔Technical Leveling
4 - Roof Area - ANSWER✔✔Conceptual Estimate needs:
Programming and design are developed by the design-build entity. - ANSWER✔✔Direct Design-Build