• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

DBIA - PROJECT DELIVERY EXAM

Exam (elaborations) Dec 14, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

DBIA - PROJECT DELIVERY EXAM

ACTUAL EXAM QUESTION AND CORRECT

ANSWERS VERIFIED ANSWERS ALREADY

GRADED A+

Time period when building profession took very defined roles of architect, engineer and building. - ANSWER✔✔Industrial Revolution Project delivery where the CM is more responsible for the project and sharing the risk associated with the project. Owner requires commitment to schedule and price. - ANSWER✔✔CM @ Risk Project delivery with three linear phases and many separate contracts with the owner. Eliminates General Contractor's Fee. - ANSWER✔✔Multi-Prime Project delivery with 3 linear process with no opportunity to accelerate the construction schedule. Two separate contracts. - ANSWER✔✔Design Bid Build Project Delivery where the A/E and Contractor are on the same team and provide unified responses and recommendations to the owner. Must manage design to price, could subject quality to risk. - ANSWER✔✔Design Build Project delivery where the CM contracted with the Owner bears no risk; the owner holds all risk. The contractors contract directly with the owner who has multiple prime contractors owner is typically inexperienced. - ANSWER✔✔Agency CM Project delivery that has the least litigation and claims. - ANSWER✔✔Design Build Procurement method which is based solely on price to the lowest responsible bidder. - ANSWER✔✔Low- Bid Procurement method where price and qualification are both considerations. - ANSWER✔✔Best Value 1 / 2

Procurement method used when the choice of builders, CM's or design-builders is obvious.Predetermined values of qualification criteria are already determined. - ANSWER✔✔Negotiated Procurement Procurement method used when selection is made on the basis of demonstrated competence. Price is not a factor. - ANSWER✔✔Qualifications Based Selection The pricing system in which the final cost is not determined until the work is complete. Often used for underground work. - ANSWER✔✔Unit Price The pricing system that offers the greatest degree of risk to the owner. - ANSWER✔✔Cost-Plus-Fee or Percentage The pricing system that is a variation of a cost plus fee. - ANSWER✔✔GMP The pricing system that offers an owner minimal risk on projects that be clearly defined and designed and provides the contractor with the greatest amount of risk. - ANSWER✔✔Lump Sum DBOM - ANSWER✔✔Design Build Operate Maintain CURT - ANSWER✔✔Construction Users Round Table CMAR - ANSWER✔✔Construction Manager at Risk DBIA - ANSWER✔✔Design Build Institute of America AEC - ANSWER✔✔Architecture Engineering and Construction Integrated Project Delivery - ANSWER✔✔IPD AIA - ANSWER✔✔American Institute of Architects GMP - ANSWER✔✔Guaranteed Maximum Price IFOA - ANSWER✔✔Integrated Form of Agreement SOQ - ANSWER✔✔Standard of Quality

  • / 2

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

The practical examples offered by this document made learning easy. A remarkable purchase!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Dec 14, 2025
Description:

DBIA - PROJECT DELIVERY EXAM ACTUAL EXAM QUESTION AND CORRECT ANSWERS VERIFIED ANSWERS ALREADY GRADED A+ Time period when building profession took very defined roles of architect, engineer and buil...

Unlock Now
$ 1.00