DBIA - PROJECT DELIVERY EXAM QUESTIONS
WITH SOLUTIONS-
QUESTION AND CORRECT ANSWERS VERIFIED
ANSWERS ALREADY GRADED A+
The term used to describe the situation where the designers and contractors are placed in close proximity to one another, often in the same office or jobsite trailer. - ANSWER✔✔Co-location The process of managing the design to a set of pre-determined "targets" - ANSWER✔✔Design Reconciliation Technology to assess design value. - ANSWER✔✔ADePT Document the describes the procurement process, forms the basis for final proposals an becomes an element of the contract. - ANSWER✔✔Request for Proposals Three documents that initially govern the DB agreement in the best value competition. - ANSWER✔✔RFP, Technical Proposal, Price Proposal The party holding the prime contract position in a multiple firm DB contractual relationship. - ANSWER✔✔Controlling Party Design Build RFP's will be evaluated off of less than what percentage for qualifications based evaluation.
- ANSWER✔✔35%
What the DB'er now has the right to do after award of contract. - ANSWER✔✔Negotiate A stated amount sometimes paid to unsuccessful proposers in consideration of preparing a Design-Build Proposal. - ANSWER✔✔Honorarium The owner warrants the sufficiency of the plans and specs to the contractor under this regulation. - ANSWER✔✔Spearin Doctrine 1 / 2
The process of narrowing the field of DB teams through the selection of the most qualified proposers on the basis of qualifications. - ANSWER✔✔Shortlisting When you align design delivery with the construction schedule. - ANSWER✔✔Design-Construct Interface The owner has plans that are too developed and the DB'er must provide a price. - ANSWER✔✔"No-Go" Example All firms that prequalify in the RFQ process are eligible to compete for the Best Value procurement in the RFP process. - ANSWER✔✔"No-Go" Example The portion of the DB proposal that contains the non-price components such as design, proposed schedule, overall management approach, and quality assurance plan. - ANSWER✔✔Technical Proposal A requirement the expressed the owner's needs and expected operation of the end product. - ANSWER✔✔Performance Requirement NOT included in the basis of design documents. - ANSWER✔✔Certificate of Errors and Omissions Insurance Owner's Project Criteria (RFP), Deviation List, Design-Builder's Proposal. - ANSWER✔✔Basis of Design Documents Amount of dollars added to an estimate to cover risks associated with the unknown. - ANSWER✔✔Contingency A tool used to develop and manage the design. - ANSWER✔✔Design-Build Cost Model Best And Final Offer - ANSWER✔✔BAFO Occurs when the design component has been priced and confirmed "within budget" and when the drawings and specs are approved by the Designer on record as complying with the RFP. - ANSWER✔✔Committed Design
- - Facilitate decisions to keep the estimate from increasing budget.