Arkansas Commercial Contractor Licensing Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2026 Q&A | Instant Download Pdf
- Which of the following is required to obtain a commercial contractor
- High school diploma only
- Proof of experience and passing exam
- Letter of recommendation from a homeowner
- Proof of experience and passing exam
license in Arkansas?
Rationale: Arkansas requires applicants to demonstrate relevant
experience and successfully pass the licensing exam.
- What is the primary purpose of a performance bond in construction?
- To insure the contractor’s personal property
- To guarantee project completion according to contract
- To provide insurance for workers’ injuries 1 / 4
- To guarantee project completion according to contract
Rationale: A performance bond ensures the contractor fulfills
contractual obligations.
- Which of the following is considered a critical component of a
- Contractor’s social media presence
- Scope of work, schedule, and payment terms
- Contractor’s office location
- Scope of work, schedule, and payment terms
construction contract?
Rationale: Clear scope, schedule, and payment terms are essential to
avoid disputes.
- In Arkansas, a contractor must maintain which type of insurance to
- Vehicle insurance
- General liability insurance
- Pet insurance
- General liability insurance
legally operate?
Rationale: General liability insurance protects against property
damage and bodily injury claims.
- What is the maximum fine for unlicensed contracting in Arkansas?
A. $500
- $2,500 per offense
- $50,000 per year 2 / 4
- $2,500 per offense
Rationale: Arkansas law sets fines up to $2,500 for each act of
unlicensed contracting.
6. A construction schedule that is delayed due to weather is considered:
- A default by the contractor
- A force majeure event
- A breach of contract
- A force majeure event
Rationale: Uncontrollable events like weather delays are typically
classified as force majeure.
- What is the purpose of a lien in construction?
- To transfer ownership of a property
- To secure payment for labor or materials
- To cancel a contract
- To secure payment for labor or materials
Rationale: Liens ensure contractors or suppliers can claim payment if
owed.
- Which type of permit is generally required before starting a
- Electrical permit only
- Building permit
- Plumbing permit only
- Building permit 3 / 4
commercial construction project?
Rationale: A building permit ensures the project complies with local
codes.
- What is the primary reason for performing a soil test before
- To evaluate soil color
- To determine load-bearing capacity
- To test water quality
- To determine load-bearing capacity
construction?
Rationale: Soil tests help engineers design foundations that can
safely support the structure.
- When a subcontractor fails to perform, who is ultimately
- Subcontractor
- General contractor
- Architect
- General contractor
responsible to the owner?
Rationale: The general contractor holds primary responsibility for
overall project performance.
11. OSHA regulations primarily protect:
- Contractors’ profits
- Workers’ safety and health
- Building aesthetics
- Workers’ safety and health
- / 4