• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

IASSC LSSGB sigma EXAM Latest Update -

Exam (elaborations) Dec 14, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

IASSC LSSGB sigma EXAM Latest Update - Actual Exam 100 Questions and 100% Verified Correct Answers Guaranteed A+ Verified by Professor

A ''pull'' production system is a production system where you make as much product as you can regardless of whether the customer needs it or not.

  • True

B. False - CORRECT ANSWER: B. False

A Pull production system only make the amount needed to meet the customer's specific demands.

A calculation for reproducibility results in a value of 0 (zero), while repeatability yields a positive number. Without any other considerations, what conclusion can be made regarding the reproducibility result?

  • The number of distinct categories is small compared to the appraiser variation.
  • Operator influence in the measurement is the main cause of variation.
  • Repeat the calculations; no conclusion can be determined without a reproducibility
  • value.

  • A reproducibility of zero means there is no operator effect on this measurement. -
  • CORRECT ANSWER: D. A reproducibility of zero means there is no operator effect on this measurement.

  • / 4

It is possible to have a reproducibility result of zero when studying automated equipment. Sometimes the appraiser only places a part in an instrument and an automatic reading is recorded in a database. There is no appraiser or operator effect in this kind of measurement, therefore, reproducibility is zero. So option d is correct.

A process has high variability and an off-centered mean. What is the first action the team needs to take?

  • Center the mean
  • Reduce Variations
  • Increase the specifications

D. None of the above - CORRECT ANSWER: A. Center the mean

For this process, centering the mean will bring a lot of the non-conforming possibilities within the specification limits. Option a is the answer.

A sample _____ is used to make inferences about the population _____.

  • Value; Parameter
  • Value; Statistic
  • Statistic; Parameter

D. Parameter; Statistic - CORRECT ANSWER: C. Statistic; Parameter

A sample is to a statistic as a population value is to a:

  • Sample
  • Unit
  • Parameter
  • Measurement - CORRECT ANSWER: C. Parameter 2 / 4

A statistic is derived from a sample. A parameter is derived from a population. So option c is correct.

A scoop samples 100 units/trial. What must be the average number of defects for there to be an 80% chance that more than one defect will be found in the sample?

A. 5.4

B. 4.75

  • 3

D. 1.8 - CORRECT ANSWER: C. 3

This question requires using the Poisson table in reverse. Note that more than one defect is desired. For the sample to contain more than one defect with an 80% probability, a table must be used to determine a 20% probability of 0 or 1. From the table, np=3.0. There must be three defects in the scoop. So option c is correct.

A Six Sigma team has been created to improve the process in which a company takes orders for its products. Which of the following tools should the team use to determine all the potential pitfalls and the actual defects that occur?

  • Process failure mode and effects analysis
  • Supplier input process output control
  • Process map

D. Design for Six Sigma - CORRECT ANSWER: A. Process failure mode and effects

analysis

A Process Failure Mode Effects Analysis (PFMEA) is a structured analytical tool used by an organization, business unit, or cross-functional team to identify and evaluate the potential failures of a process. PFMEA helps to establish the impact of the failure, and 3 / 4

identify and prioritize the action items with the goal of alleviating risk. It is a living document that should be initiated prior to the process of production and maintained through the life cycle of the product.

A team of Six Sigma has reached the control stage of DMAIC. The team has successfully reduced the defect of fabric critical stains from 73 to 1 per fabric roll. Now what type of control chart should the team recommend?

  • A control chart based on the normal distribution such as the X-bar chart
  • A control chart based on the Poisson distribution such as the u-chart
  • A p-chart based on the binomial distribution
  • An np chart based on the binomial distribution - CORRECT ANSWER: B. A control
  • chart based on the Poisson distribution such as the u-chart

All four answers refer to valid control charts, but only answer B recognizes the Poisson nature of the improvement achieved. Critical stains are defect counts which are descriptive of the Poisson distribution. All other chart options are improper applications.Option b is correct

According to a national grocery store chain manager, only 6% of customers who have surveys mailed to their homes return them filled out completely. What is this type of sampling error called?

  • Non-response error
  • Confidence interval
  • Lazy consumer error

D. Mailing error - CORRECT ANSWER: A. Non-response error

  • / 4

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

This document provided practical examples, which was incredibly useful for my research. Absolutely remarkable!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Dec 14, 2025
Description:

IASSC LSSGB sigma EXAM Latest Update - Actual Exam 100 Questions and 100% Verified Correct Answers Guaranteed A+ Verified by Professor A ''pull'' production system is a production system where you ...

Unlock Now
$ 1.00