• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

ICC GENERAL REQUIREMENTS

Exam (elaborations) Dec 14, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

  • | Page

ICC GENERAL REQUIREMENTS

PRACTICE EXAM

ACTUAL EXAM WITH CORRECT

SOLUTIONS.

Who performs a structural observation?

  • the RDP in responsible charge
  • The special inspector
  • The contractor
  • The building official - correct answer- A) the RDP in
  • responsible charge

Who prepares the statement of special inspections?

  • The building offficial
  • The contractor
  • The owner
  • The RDP - correct answer- D) The RDP

Who is in charge of reviewing and approving reports?

  • The building offficial
  • The contractor
  • The owner 1 / 2
  • | Page
  • The RDP - correct answer- D) The RDP

ICC exams are based on which document?

a) ACI

b) IBC

c) ASTM - correct answer- B) IBC

Who is in charge of giving "approval to proceed"

  • The building offficial
  • The contractor
  • The owner
  • The RDP - correct answer- A

Who responds to reports of uncorrected discrepancies?

  • The building official
  • the contractor
  • The owner
  • The RDP - correct answer- D) The RDP

  • / 2

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

This document provided in-depth analysis, which made learning easy. Absolutely remarkable!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Dec 14, 2025
Description:

ICC GENERAL REQUIREMENTS PRACTICE EXAM ACTUAL EXAM WITH CORRECT SOLUTIONS. Who performs a structural observation? A) the RDP in responsible charge B) The special inspector C) The contractor D) The ...