• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

ICC General Requirements Practice Exam Latest

Exam (elaborations) Dec 14, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

ICC General Requirements Practice Exam Latest Update - Sources with 270 Questions and Verified Correct Answers Golden Ticket to Guaranteed A+ Verified by Professor A basic knowledge in which subject is NOT required to be a special inspector?

  • Structural design
  • An understanding of construction documents
  • An understanding o the current codes
  • How to perform all test expected of you - CORRECT ANSWER: A) Structural design

Can a material not listed in the IBC be used for construction?

  • Yes

B) No - CORRECT ANSWER: A

ICC exams are based on which document?

a) ACI

b) IBC

c) ASTM - CORRECT ANSWER: B) IBC

What does a special inspector's job NOT entail while on the job site?

  • instructing the contractor;s workers on how to do their job
  • Verify means and methods of construction
  • Inform the contractor of arrival
  • Discuss with the contractor any discrepancies as they may come up later in a lawsuit

- CORRECT ANSWER: A) Instructing the contractor's workers on how to their job

  • / 4

What should a special inspector NOT do prior to arriving to the jobsite?

  • Attend a preconstruction meeting
  • Review the construction documents
  • Discuss frequency of reports with the building official

D) Ask any questions you may have - CORRECT ANSWER: A) Attend a preconstruction

meeting

Which of the following should a special inspector contact the contractor about immediately?

  • If the concrete temperature is 80 degrees
  • If the slump calls for a maximum of 4' but is 6'
  • If the air content calls for 6% but is 3%

D) If the steel isn't tied properly - CORRECT ANSWER: B and C

Who can deem special inspections unnecessary?

  • The building offficial
  • The contractor
  • The owner

D) The RDP - CORRECT ANSWER: A) The building official

Who hires the special inspector?

  • The building offficial
  • The contractor
  • The owner

D) The RDP - CORRECT ANSWER: C and D

Who is in charge of giving "approval to proceed"

  • The building offficial
  • The contractor 2 / 4
  • The owner

D) The RDP - CORRECT ANSWER: A

Who is in charge of reviewing and approving reports?

  • The building offficial
  • The contractor
  • The owner

D) The RDP - CORRECT ANSWER: D) The RDP

Who performs a structural observation?

  • the RDP in responsible charge
  • The special inspector
  • The contractor

D) The building official - CORRECT ANSWER: A) the RDP in responsible charge

Who prepares the statement of special inspections?

  • The building offficial
  • The contractor
  • The owner

D) The RDP - CORRECT ANSWER: D) The RDP

Who responds to reports of uncorrected discrepancies?

  • The building official
  • the contractor
  • The owner

D) The RDP - CORRECT ANSWER: D) The RDP

Who should NOT hire the special inspector? 3 / 4

  • The building official
  • The contractor
  • The Owner

D) The RDP - CORRECT ANSWER: B

Who should the special inspector notify upon arrival to the jobsite?

  • The building offficial
  • The contractor
  • The owner

D) The RDP - CORRECT ANSWER: B

Who's job is it to ensure that the special inspector has an approved set of plans?

  • The building offficial
  • The contractor
  • The owner

D) The RDP - CORRECT ANSWER: B

A basic knowledge in which subject is NOT required to be a special inspector?

a) Structural design

b) An understanding of construction documents

c) An understanding of the current codes

d) How to perform all tests expected of you - CORRECT ANSWER: Not sure... All seem

important, but I chose (a).

Can a material not listed in the IBC be used for construction?

a) Yes

b) No - CORRECT ANSWER: a) Yes

  • / 4

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

I was amazed by the practical examples in this document. It was incredibly useful for my research. Truly excellent!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Dec 14, 2025
Description:

ICC General Requirements Practice Exam Latest Update - Sources with 270 Questions and Verified Correct Answers Golden Ticket to Guaranteed A+ Verified by Professor A basic knowledge in which subjec...

Unlock Now
$ 1.00