• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

ICC MASONRY EXAM - Which of the following is the standard specific...

Exam (elaborations) Dec 14, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

  • | Page

ICC MASONRY EXAM

EXAM WITH CORRECT SOLUTIONS.

Which of the following is the standard specification for loadbearing concrete masonry units? - correct answer- ASTM C 90; RCMCI 6th Edition, Section 2.2.1

Which of the following grout admixtures is used to obtain a high slump with reduced water? - correct answer- Super plasticizer; RCMCI 6th Edition, Section 2.11.6

Which of the following is the standard specification that autoclaved aerated concrete masonry units must conform to for the strength class specified in the contract documents? - correct answer- ASTM C 1386; CI 530; Part 2, Section 2.3E.

IBC

2103.3

Grout intended for use in the construction of engineered and empirically designed masonry structures must comply with - correct answer- ASTM C 476; 2006 IBC 2103.12

  • / 3
  • | Page

The slump test for grout must be performed in accordance with

  • correct answer- ASTM C 1019; ASTM - C1019-03

In what condition are grout specimens to be tested? - correct answer- Damp; ASTM - 1019-03

When the prism test method is being utilized, how long must the prisms cure prior to being cut? - correct answer- 28; 2006 IBC

2105.3.1

After construction and grouting, masonry test prisms should not be disturbed or moved for a minimum of - correct answer- 48 hours; ASTM - C 1314, Section 5.10

When field sampling grout, the elapsed time between obtaining the first and final portions of the sample shall not be more than - correct answer- 15 minutes; ASTM - C1019, Section 7.2.1

  • / 3
  • | Page

If mortar compression tests are required, how many tests per day are to be taken for the three successive work days at the start of the job? - correct answer- 1; RCMCI 6th Edition, 3.2.4

Glass unit masonry shall not be laid at temperatures below - correct answer- 60 degrees F; 2006 IBC 2104.3.2.1

What is the maximum mean daily temperature permitted before newly constructed masonry must be fog sprayed during curing?

  • correct answer- 100 degrees F; 2006 IBC 2104.4.3

When the temperature is below 40 degrees F, newly constructed masonry must be covered with a weather resistant membrane for a minimum of - correct answer- 24 hours; 2006 IBC 2104.3.3.3

After initial mixing, when the ambient temperature exceeds 90 degrees F with a wind velocity over 8 mph, mortar used in masonry construction must be discarded after - correct answer- 2 hours;

2006 IBC 2104.4.2.1

  • / 3

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

The step-by-step guides offered by this document was incredibly useful for my research. A remarkable purchase!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Dec 14, 2025
Description:

ICC MASONRY EXAM EXAM WITH CORRECT SOLUTIONS. Which of the following is the standard specification for loadbearing concrete masonry units? - correct answer- ASTM C 90; RCMCI 6th Edition, Section 2....

Unlock Now
$ 1.00