Lean Six Sigma Green Belt IASSC Latest Update
- Actual Exam 225 Questions and 100%
Verified Correct Answers Guaranteed A+ Verified by Professor
(Within DPMO) How is Total number of opportunities calculated? - CORRECT
ANSWER: Units*Number of opportunities per unit
3 M's of Lean - CORRECT ANSWER: Muda, Muri, Mura
- Whys technique - CORRECT ANSWER: asks iterative questions to find the root cause
5S - CORRECT ANSWER: Organize work area: Sort, Set in order, Shine, Standardize, Sustain
5S helps in..? - CORRECT ANSWER: Improving the workplace, productivity and
maintenance
A Measurement System Analysis (MSA) is needed prior to any...? - CORRECT
ANSWER: data collection activities
A project charter - CORRECT ANSWER: Define's a team's mission, scope of operation, objectives, time frame, and consequences for the project
A project plan - CORRECT ANSWER: An approved document used to control and
manage a project
A test-statistic is used to ? - CORRECT ANSWER: Determine the validity of a
hypothesis test
- / 3
Affinity Diagram - CORRECT ANSWER: Method used by teams to organize several
ideas
Alternative Hypothesis - CORRECT ANSWER: The hypothesis that states there is A
DIFFERENCE OR CHANGE
Another name for Attribute data - CORRECT ANSWER: Discrete
Another word for Variable data - CORRECT ANSWER: Continuous
Apart from financial accounting, Business Score Card (BSC) also considers? -
CORRECT ANSWER: Internal processes, customer satisfaction, and learning and
growth
Benchmarking - CORRECT ANSWER: Comparing an organization's business
processes, practices, and performance metrics with that of industry leaders.
Bias The measure of distance between the measure value and the true or actual value -
CORRECT ANSWER: The measure of distance between the measure value and the
true or actual value
Binomial Distribution - CORRECT ANSWER: -Defective items
-Sample size > 30, >10%
Business Process (SIPOC) - CORRECT ANSWER: Supplier, Input, Process, Output,
Customer
C chart used for - CORRECT ANSWER: Defective which have constant subgroups size
and is represented as number of defects
- / 3
Cause and Effect Diagram is used to? - CORRECT ANSWER: Find the the root cause
and the potential solutions to a problem
Census - CORRECT ANSWER: A study that obtains data from every member of a
population
Chi-Square Distribution - CORRECT ANSWER: -Used in Inferential Statistics
-Used in hypothesis test
Chosen as an industry standard and accounts for 99% of Measurement System
variation? - CORRECT ANSWER: 5.15
Combination - CORRECT ANSWER: The unordered arrangement of a set, group, or
number of things
Common Lean tools and techniques - CORRECT ANSWER: Poka-Yoke, 5S, Kaizen,
JIT, Heinjunka, Standardized Work, Take Time
Comparing Cp and Cpk if Cpk < Cp **Cpk can never be larger than Cp because Cp represents the maximum capability with the current process variation Cp= process performing at MAXIMUM capability Cpk = how the process is CURRENTLY performing - CORRECT ANSWER: -> Mean is not centered between specification limits
Control Pan - CORRECT ANSWER: Written summary description of the system for
controlling a process
Control plan tools - CORRECT ANSWER: -Control cahrts
-MSA -Error-proofing -SOP
- / 3