1 / 31
https://www.stuvia.com/user/Mboffin
NCCCO MOBILE CRANE| 99 ACTUAL QUESTIONS &
CORRECT VERIFIED ANSWERS || GRADED A+ | LATEST
- What action does a signal person intend the operator to perform if he
- Boom down
- Swing
- Boom up
- Extend boom ANS >> c.
- When hoisting personnel, within what percentage of level must a tele-
- 1%
- 2%
- 5% 1 / 4
extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up?
scopic boom crane be in order for the gross ratings in the load chart to remain valid?
2 / 31
https://www.stuvia.com/user/Mboffin
- 8% ANS >> a.
- The load line of the crane you're operating contacts an energized power
- Climb down carefully from the crane cab
- Jump down, feet together
- Stay in the cab until the lines are de-energized
- Get as far away from the crane as possible ANS >> c.
- According to OSHA 1926.1413, how many randomly distributed broken
- 1 broken wire in 6 rope diameters
- 2 broken wires in 30 rope diameters
- 3 broken wires in one strand in one lay
- 2 broken wires in 6 rope diameters ANS >> d.
- What is the net capacity of a crane on main boom unless the manufacturer
- The capacity listed in the load chart minus the weight of the rigging and all
- The capacity listed in the load chart plus the weight of the rigging and all
- The capacity listed in the load chart minus the weight of the rigging and all
line. There's no sign of any other danger, such as fire. What should you do?
wires in rotation-resistant rope are cause for replacement of the rope?
states otherwise?
attachments
attachments
attachments not in use 2 / 4
3 / 31
https://www.stuvia.com/user/Mboffin
- The capacity listed in the load chart minus the weight of the rigging alone ANS
- What may happen to a properly rigged load when lifted off the ground
- It could swing out away from the crane
- It could swing in towards the crane 3 / 4
>> a.
unless the operator takes account of boom deflection?
4 / 31
https://www.stuvia.com/user/Mboffin
- It could raise absolutely vertically
- It could shift in its rigging ANS >> a.
- What Standard Method hand signal is being illustrated?
- Swing
- Stop
- Emergency Stop
- Travel ANS >> a.
- Who should an operator respond to a "stop" signal from?
- Appointed signal person only
- Project manager only
- Superintendent only
- Anyone ANS >> d.
- Which area do truck cranes without a 5th outrigger generally have no
- The side
- The rear
- / 4
lifting capacity unless the manufacturer states otherwise?