• wonderlic tests
  • EXAM REVIEW
  • NCCCO Examination
  • Summary
  • Class notes
  • QUESTIONS & ANSWERS
  • NCLEX EXAM
  • Exam (elaborations)
  • Study guide
  • Latest nclex materials
  • HESI EXAMS
  • EXAMS AND CERTIFICATIONS
  • HESI ENTRANCE EXAM
  • ATI EXAM
  • NR AND NUR Exams
  • Gizmos
  • PORTAGE LEARNING
  • Ihuman Case Study
  • LETRS
  • NURS EXAM
  • NSG Exam
  • Testbanks
  • Vsim
  • Latest WGU
  • AQA PAPERS AND MARK SCHEME
  • DMV
  • WGU EXAM
  • exam bundles
  • Study Material
  • Study Notes
  • Test Prep

NCCCO Tower Crane Actual Exam 100 Questions and Answers.

Exam (elaborations) Dec 14, 2025 ★★★★★ (5.0/5)
Loading...

Loading document viewer...

Page 0 of 0

Document Text

NCCCO Tower Crane Actual Exam 100 Questions and Answers.How many broken wires must be present in one stand on one lay for running wire rope to be removed from service - ANSWER-4 ASME 3-2.4.3(b)(1)

What is the maximum permitted wind speed when climbing a tower - ANSWER-20mph ASME 3-1.1.5(i)

According to ASME B30.3 a crane should be plumbed to - ANSWER-1 to 500 ASME 3-1.1.5(g)

According to ASME B30.3 the rated load under static conditions shall not exceed of calculated tipping loads - ANSWER-63% ASME 3-1.2.1(a)

According to ASME B30.3 an overhead power line is ALWAYS considered to be - ANSWER-Energized until the power company has verified it is not energized

High Tensile bolts should be marked with manufacturers designation and - ANSWER-Strength rating TCCM Bolting 4-4

Bolt connections for tower sections must use high tensile strength nuts with ratings of - ANSWER-12 TCCM Bolting 4-5

Washers used in high tensile bolt connections shall be marked with - ANSWER-HV TCCm bolting 4-5

Before installation high tensile bolt connection components shall be cleaned and visually examined for - ANSWER-damage and corrosion TcCCM bolting 4-7

When ready to torque the nut on a high tensile bolt connection you should - ANSWER-Lubricate threads TCCM bolting 4-8 1 / 3

During tightening of high tensile connections the bolt is stretched tom a specific percentage of its elastic limit at the correct - ANSWER-Torque TCCM bolting 4-9

Preferably the tightening torque shall be applied to the - ANSWER-Nut TCCM bolting 4-9

The tightening torque values placed on the nuts and bolts of high tensile bolt connection are dependent on the - ANSWER-type and size. TCCM bolting 4-9

What components of a tower crane are connected with high/tensile bolt connections? - ANSWER- Foundation anchors, tower sections, slewing, ring support TCCM bolting 4-2

When the tower base bolts are torque the counter job should be positioned - ANSWER-0 degrees from the bolt

According to the NCCCO Tower Crane reference manual what items below should be part of the operators daily pre check - ANSWER-Wire ropes limit switches. TCCM maintenance 2-19

According to the NCCCO Tower Crane reference manual, how any safety turns (wraps) must be left on the hoist drum when the load hook is in its lowest position - ANSWER-3 TCCM wire rope 5-1

According to NCCCO tower crane reference manual when possible installing the hoist wire rope on a tower crane you should wind the rope with approximately how much of the maximum permissible load - ANSWER-10% TCCM Wire rope 5-1

According to the ASME B30.3 what is the design factor for rotation resistant load hoist wire rope - ANSWER-5.0 to 1 ASME 3-15.5 (b)

Who determines the correct hoist wire rope to be installed on tower cranes - ANSWER-Manufacturer

What grade alloy steel chain should be used for crane hoisting slings - ANSWER-80 OSHA 1910.184 2 / 3

According to ASME B30.3 using rotation resistant running rope on a tower crane how many broken wires in six rope diameters can you have to leave it in service. - ANSWER-1 ASME 3-2.4.3(b)(2)

According to ASME B30.3 a periodic inspection of a tower cranes wire rope shall be performed at least? - ANSWER-Annually ASME 3-2.4.2(b)(1)

According to ASME B30.3 which inspection does not require records to be kept - ANSWER-Frequent

ASME 3-2.4.2

Wire rope lubricant is very important. It should be applied according to who's recommendations? - ANSWER-Manufacturer ASME 3-2.4.4(e)

When you have core failure in wire rope a common result is - ANSWER-reduction in diameter ASME 3- 2.4.2 (Figure 9)

According to OSHA 1926.550, Who is responsible for machinery and equipment inspection before each use - ANSWER-competent person

With a hook height of 350 feet, where should the hydraulic top climbing unit be positioned before operating crane according to chart B - ANSWER-Uppermost tie in position

According to spacing chart B what is the distance from the face of the structure to the center line of the crane - ANSWER-10`10"

When is it permitted to shift the hoist gear of a tower crane - ANSWER-Neutral Gear

According to ASME B30.3 an overhead power line is always considered to be - ANSWER-Energized until the power company had verified it is not energized

According to ASME B30.3 maintenance personnel are permitted to operate the crane only when - ANSWER-Performing their duties

  • / 3

User Reviews

★★★★★ (5.0/5 based on 1 reviews)
Login to Review
S
Student
May 21, 2025
★★★★★

This document featured comprehensive coverage that helped me ace my presentation. Such an impressive resource!

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Exam (elaborations)
Added: Dec 14, 2025
Description:

NCCCO Tower Crane Actual Exam 100 Questions and Answers. How many broken wires must be present in one stand on one lay for running wire rope to be removed from service - ANSWER-4 ASME 3-2.4.3(b) Wh...

Unlock Now
$ 1.00