According to ASME B30.3, the prohibited zone for power lines that are 60kV is - CORRECT ANSWER✔✔15ft. ASME 3-3.3.4.3(1) Table 1
According to ASMA 30.3, load hoist rotation resistant wire rope has a design factor of - CORRECT ANSWER✔✔5 to 1 ASME 3-1.5.5(b)
According to ASME B30.3, when lifting a suspended personnel platform the design factor for the rigging hardware is - CORRECT ANSWER✔✔5 to 1 ASME 3-3.2.2(b)(3)
According to ASME B30.3, Load hoist ropes that are not rotation must have a design factor of - CORRECT ANSWER✔✔5 to 1 ASME 3-1.5.5(b)
The OSHA construction standard for rigging equipment is - CORRECT ANSWER✔✔1926.251
According to ASMA B30.3, on whose recommendations should a preventative maintenance program be set up - CORRECT ANSWER✔✔Crane manufacturer ASME 3-2.3.1(a)
When using cable or nylon spreaders it is important to remember - CORRECT ANSWER✔✔ The lower the spreader angle the greater the tension
According to OSHA when testing a man basket how long must the test pick be maintaned - CORRECT ANSWER✔✔5 minutes. OSHA 1926.550 (g)(5)(vi)
According to ASME B30.3, what is the minimum pitch diameter for load hoisting sheaves - CORRECT ANSWER✔✔not less than 18 times rope diameter ASME 3-1.5.4(d)
- / 2
According to ASME B30.3, what is the minimum pitch diameter for load block sheaves - CORRECT ANSWER✔✔not less then 16 times rope diameter ASMA 3-1.5.4(d)
According to ASME b30.3, what is the minimum pitch diameter for boom hoist sheaves - CORRECT ANSWER✔✔not less then 15 times rope diameter ASME 3-1.5.4(d)
According to OSHA when lifting personnel the cranes hook must be the types that - CORRECT ANSWER✔✔Can be closed and locked OSHA 1926.550(g)(4)(iv)(B)
According to OSHA, when working over water with a man basket are the people inside required to wear a belt/harness - CORRECT ANSWER✔✔No harness or belt required OSHA 1926.550(g)(6)(VII)
According to ASME B30.3, when working near power lines where should caution stickers be installed - CORRECT ANSWER✔✔At operators station and at the base of the crane ASME 3- 3.4.3(f)
According to OSHA a frequent inspection is - CORRECT ANSWER✔✔Daily to monthly OSHA 1910.180(d)(2)(i)
According to OSHA a periodic inspection is - CORRECT ANSWER✔✔Monthly to annually OSHA 1910.180(d)(2)(ii)
Cranes idle for more than six months must have inspections performed: - CORRECT ANSWER ✔✔Frequent and Periodic ASME 3-2.1.5(b)
Cranes idle for less than six months must have inspections performed: - CORRECT ANSWER ✔✔Frequent ASME 3-2.1.5(a)
Cranes lifting personnel platform must have the platform and rigging inspected: - CORRECT ANSWER✔✔Prior to each shift ASME 3-3.2.2(c)(1)