When the number of layers of wire rope on a drum increases the:
- Allowable line pull decreases
- Allowable line pull increases
- Allowable line pull remains the same
- Allowable line pull can't be calculated CORRECT ANSWER: A) Allowable line pull
decreases
What is the weakest quadrant of a boom truck? CORRECT ANSWER: Front
On a mobile crane, side loading of the boom could be caused by which of the following?
- Starting or stopping the swing too rapidly
- Raising or lowering the load too rapidly
- Raising or lowering the boom too rapidly
D) Starting or stopping the engine too rapidly CORRECT ANSWER: A) Starting or
stopping the swing too rapidly
What effect would blocking up the ends of the tracks have on a crane? CORRECT
ANSWER: It would increase capacity over the ends
The tipping axis of a crawler crane is? CORRECT ANSWER: It depends if the idler or sprocket are offset from track rollers
Which person listed below, has the responsibility for determining the correct weight of a load?
- Crane Operator
- Crane Owner
- Lift Director
D) Signal Person CORRECT ANSWER: C) Lift Director
What must an operator do when an operator leave the controls of the crane for an extended period of time?
- Apply all brakes and dogs, and leave the load suspended
- Apply all brakes and dogs, and lower the load to the ground
- Apply all brakes and dogs, and lower boom to ground 1 / 4
D) Apply only swing brake and leave the engine running CORRECT ANSWER: B)
Apply all brakes and dogs, and lower the load to the ground
According to ASME B30.5 what percentage should not be exceeded on a mobile crane
during a load test? CORRECT ANSWER: 100%
Abruptly stopping a rapid swing on a long -boom mobile crane will produce what major effect
- Overheating the swing brake
- Collapsing the boom
- Increasing ground pressure
D) Overheating the race and bearings CORRECT ANSWER: B) Collapsing the boom
When should a tag line be used, during the hoisting of material?
- When the rotation of the load would be dangerous
- When the rigger is not certain of the loads stability
- When only one signal person is required to signal lift
- When the lift director leaves the lifting area of the crane CORRECT ANSWER: A)
When the rotation of the load would be dangerous
What percentage of the rated capacity of a mobile crane must be used when lifting with two cranes attached to the same load?
A) 85%
B) 75%
C) 50%
D) 90% CORRECT ANSWER: B) 75%
From strongest to weakest put the following hitches in order CORRECT ANSWER:
Basket, vertical, choker
When lifting a load with two mobile cranes, it is very important to
- Use only cranes from the same manufacturer
- Use only cranes with the same rated capacity
- Keep the working radius of both cranes identical
- Keep the hoist lines of both cranes vertical CORRECT ANSWER: D) Keep the hoist
lines of both cranes vertical
If lifting a load with two mobile cranes of different rated capacities, the crane with the
larger rated capacity should:
- Be hooked at an equal distance from the loads center of gravity
- Be hooked at a distance closer to the loads center of gravity
- Be hooked at the loads center of gravity
- Be hooked at a distance farther from the loads center of gravity CORRECT
ANSWER: B) Be hooked at a distance closer to the loads center of gravity
Which of the following should synthetic slings not be used around? CORRECT
ANSWER: Acid 2 / 4
When determining the position to a mobile crane should be left in over night, with high
winds in the forecast the operator should:
- Tie off to the closest solid structure with the wind in the front
- Tie off to the closest solid structure with the wind in the back
- Put the crane in weather vane position
D) Follow manufacturers recommendations CORRECT ANSWER: D) Follow
manufacturers recommendations
When performing a multiple crane lift it is important for the operator of each crane to
understand that:
- The weight is equally distributed at all times during the lift
- The weight is never equally distributed during the crane lift
- The weight may increase if the other crane lands the load
D) The weight may decrease if the other crane lands the load CORRECT ANSWER: C)
The weight may increase if the other crane lands the load
When lifting loads that are submerged under water with a mobile crane, what is one of the conditions that the operator should be familiar with?
- Current can change and cause the crane to tip over
- Brakes or dogs on the crane could get wet and slip
- Boom and extension can't be removed without high tide
D) Load will increase when lifting the load out of the water CORRECT ANSWER: D)
Load will increase when lifting the load out of the water
When lifting over water with a personnel platform, what are the occupants of the platform required to wear?
- A body harness
- A waist belt
- A floatation device
D) A full face respirator CORRECT ANSWER: C) A floatation device
If a mobile crane is NOT set-up level and the operator swing the load from the high side to the low side, what effect will that have on the radius?
- The radius will decrease
- The radius stays the same
- The radius can't be calculated
D) The radius increase CORRECT ANSWER: D) The radius increase
Increasing the distance from the crane's center of gravity to the tipping axis will have what effect on a mobile crane?
- Increase stability
- Decrease stability
- Increase structural competence
D) Decrease structural competence CORRECT ANSWER: B) Decrease stability
Backward Stability of a mobile crane is tested in which configuration listed below? 3 / 4
- Basic Boom at maximum angle with maximum load
- Maximum boom at maximum angle with maximum load
- Basic boom at minimum angle with no load
D) Basic boom at maximum angle with no load CORRECT ANSWER: D) Basic boom
at maximum angle with no load
What is the minimum pitch diameter used for sheaves in a boom hoist reeving system using rotation resistant wire rope?
- Not less than 15 times rope diameter. Boom hoist
- Not less than 16 times rope diameter. load block
- Not less than 18 times rope diameter, Load hoisting- this is the one on the test
D) Not less than 20 times rope diameter CORRECT ANSWER: A) Not less than 15
times rope diameter. Boom hoist
When can capacity altering modifications be made to mobile cranes?
- Capacity altering modifications may not e made to mobile cranes
- When lifting in the tipping portion of the load chart
- When lifting in the structural portion of the load chart
D) When permission is given by the crane manufacturer CORRECT ANSWER: D)
When permission is given by the crane manufacturer
A crane is at the point of instability when the crane's leverage on the load equals:
- 100% of the load's leverage on crane
- 90% of the load's leverage on crane
- 85% of the loads leverage on crane
D) 75% of the load's leverage on crane CORRECT ANSWER: A) 100% of the load's
leverage on crane
Who must determine maximum speed for a mobile crane to travel with a suspended load?
- The competent person
- The job Site
- The superintendent
D) The craft foreman CORRECT ANSWER: A) The competent person
Deflection of the boom while operating a mobile crane will increase?
- Load Radius
- Weight of Boom
- Load Weight
D) Crane Stability CORRECT ANSWER: A) Load Radius
A sudden start or stop of the hoisting function while operating a mobile crane can
produce a:
- Static load
- Dynamic Load
- Eccentric Load
- Symmetrical Load CORRECT ANSWER: B) Dynamic Load
- / 4